2002 HONDA CIVIC ignition

[x] Cancel search: ignition

Page 887 of 1139

HONDA CIVIC 2002 7.G Workshop Manual Gauges
Self-diagnostic Procedure
The gauge assembly has a self-diagnosis function.. The Beeper Drive Circuit Check. The Indicator Drive Circuit ChecL. The LCD Segments Check. The Gauges Drive Circuit

Page 888 of 1139

HONDA CIVIC 2002 7.G Workshop Manual \
The LCD Segment Check:
When entering the self-diagnosis mode, the odo/trip segment blinks five times.
The Gauge Drive Circuit Check:
When entering the self-diagnosis mode, the speedometer, the tacho

Page 896 of 1139

HONDA CIVIC 2002 7.G Workshop Manual IVehicle Speed Signal Circuit Troubleshooting
Special Tools Required:
Test Harness 07LAJ-PT3020A
Before testing, inspect the No. 4 (10A) and No. 10 (7.5A)
fuses in the under-dash fuse/relay box.
1. Di

Page 897 of 1139

HONDA CIVIC 2002 7.G Workshop Manual Gauges
9.
10.
Vehicle Speed Signal Circuit Troubleshooting (contdl
Turn the ignition switch OFF.
Connect the other test harness connector (A) to the
VSS (B),
11.Raise the front of the vehicle, and ma

Page 907 of 1139

HONDA CIVIC 2002 7.G Workshop Manual Exterior Lights
Daytime Running Lights Control Unit Input Test - Canada
The DRL indicator light in the gauge assembly will come on when you turn the ignition switch to ON (ll) with the
headlight switc

Page 920 of 1139

HONDA CIVIC 2002 7.G Workshop Manual Entry Light Control System
Component Location Index
IGNITION KEY LIGHTTest, page 22-91
IGNITION KEY SWITCHlest, page 22-91
DRIVERS DOOR SWITCH
CEILING LIGHT/SPOTLIGHTSTest, page 22-96Replacement, pag

Page 922 of 1139

HONDA CIVIC 2002 7.G Workshop Manual \lgnition Key Switch Test
NOTE: For more key-in beeper information, refer to the
circuit diagram (see page 22-90) and input test (see
page 22-921.
When the ignition key is in the ignition switch the
m

Page 924 of 1139

HONDA CIVIC 2002 7.G Workshop Manual I
5. With the connectors stilldisconnected, make these input tests at the connector
. lf anv test indicates a problem, find and correct the cause, then recheck the system. lf all the inpul tests prov