Page 373 of 656

6E2-40 ENGINE AND EMISSION CONTROL SYSTEM (SEQUENTIAL MULTIPORT FUEL INJECTION FOR H27 ENGINE)
INSPECTION
1) Check sensor O-ring (1) for damage and deterioration.
Replace as necessary.
2) Arrange 3 new 1.5 V batteries (2) in series and connect its
positive terminal to “Vin” terminal of MAP sensor (1) and
negative terminal to “Ground” terminal. Then check voltage
between “Vout” and “Ground”.
Also, check if voltage reduces when vacuum is slowly
applied up to 400 mmHg by using vacuum pump (3).
If check result is not satisfactory, replace manifold absolute
pressure sensor.
MAP sensor output voltage (Vin voltage 4.5 – 5.5 V, ambi-
ent temp. 20 – 30°C (68 – 86°F))
CAUTION:
As connection to wrong terminal will cause damage to
manifold absolute pressure sensor, make absolutely sure
to connect properly as shown in the figure.
ALTITUDE
(Reference)BAROMETRIC
PRESSUREOUTPUT
VOLTAGE
(ft) (m) (mmHg) (kPa) (V)
0
–
20000
–
610760
–
707100 – 94 3.3 – 4.3
2001
–
5000611
–
1524Under 707
over 63494 – 85 3.0 – 4.1
5001
–
80001525
–
2438Under 634
over 56785 – 76 2.7 – 3.7
8001
–
100002439
–
3048Under 567
over 52676 – 70 2.5 – 3.3
Page 375 of 656
6E2-42 ENGINE AND EMISSION CONTROL SYSTEM (SEQUENTIAL MULTIPORT FUEL INJECTION FOR H27 ENGINE)
3) Check resistance between each two terminals as in table
below.
If check results are as specified, proceed to next operation
check. If not, replace.
Main relay resistance:
4) Check that there is continuity between terminals “A” and “B”
when battery is connected to terminals “C” and “D”.
If malfunction is found, replace.
Fuel pump relay
INSPECTION
1) Disconnect negative (–) cable at battery.
2) Remove fuel pump relay (2) from connector.
3) Structure of fuel pump relay is the same as that of main
relay.
Check its resistance and operation using the same proce-
dure as that for main relay.
If malfunction is found, replace. TERMINALS RESISTANCE
Between “A” and “B”∞
∞∞ ∞ (Infinity)
Between “C” and “D”
79 – 95 Ω
ΩΩ Ω (at 20
°C (68°F))
1. Main relay
3. Fuse box
4. Instrument panel
[A]: Left-hand steering vehicle
[B]: Right-hand steering vehicle
Page 376 of 656
ENGINE AND EMISSION CONTROL SYSTEM (SEQUENTIAL MULTIPORT FUEL INJECTION FOR H27 ENGINE) 6E2-43
Fuel cut operation
INSPECTION
1) Warm up engine to normal operating temperature.
2) While listening to sound of injector by using sound scope (1)
or such, increase engine speed to higher than 3,000 r/min.
3) Check to make sure that sound to indicate operation of injec-
tor stops when throttle valve is closed instantly and it is
heard again when engine speed is reduced to less than
about 2,000 r/min. NOTE:
Before inspection, check to make sure that gear shift
lever is in Neutral position (with A/T model, selector lever
in “P” range) and that parking brake lever is pulled all the
way up.
Page 378 of 656
ENGINE AND EMISSION CONTROL SYSTEM (SEQUENTIAL MULTIPORT FUEL INJECTION FOR H27 ENGINE) 6E2-45
INSPECTION
1) Check resistance between following terminals of EGR valve
(1) in each pair.
If found faulty, replace EGR valve assembly.
EGR valve resistance:
2) Remove carbon from EGR valve gas passage.
3) Inspect valve (2), valve seat (3) and rod for fault, cracks,
bend or other damage.
If found faulty, replace EGR valve (1) assembly.
INSTALLATION
Reverse removal procedure noting the followings.
•Clean mating surface of valve and intake manifold.
•Use new gasket.
EVAP canister
INSPECTION
Terminals Standard resistance
A – B
C – B
F – E
D – E20 – 24 Ω
ΩΩ Ω at 20°C (68°F)
B - valve body
E - valve bodyinfinity (∞
∞∞ ∞)
NOTE:
Do not use any sharp-edged tool to remove carbon.
Be careful not to damage or bend EGR valve, valve seat
and rod.
WARNING:
DO NOT SUCK nozzles on EVAP canister. Fuel vapor
inside EVAP canister is harmful.
Page 379 of 656

6E2-46 ENGINE AND EMISSION CONTROL SYSTEM (SEQUENTIAL MULTIPORT FUEL INJECTION FOR H27 ENGINE)
1) Disconnect vacuum hoses from EVAP canister and remove
EVAP canister.
2) When air is blown into tank pipe, there should be no restric-
tion of flow through purge pipe and air pipe.
If operation differs from above description, EVAP canister
must be replaced.
3) Install EVAP canister and connect hoses to canister.
Vacuum passage
INSPECTION
Start engine and run it at idle speed. Disconnect vacuum hose
from EVAP canister purge valve. With finger placed against hose
disconnected, check that vacuum is applied.
If it is not applied, clean vacuum passage by blowing compressed
air.
TANK PRESSURE CONTROL VALVE INSPECTION
1) Remove tank pressure control valve installed around EVAP
canister.
2) Air should pass through valve smoothly from black side (3) of
tank pressure control valve (1) to orange side (2) when
blown hard.
3) From orange side, even when blown softly, air should come
out of black side.
4) If air doesn’t pass through valve in Step 2) or hard blow is
required in Step 3), replace tank pressure control valve.
5) Plug orange nozzle and apply 26 kPa (20 cmHg) vacuum to
black nozzle. Check that vacuum is held at that level (there is
no leakage).
If vacuum leaks, replace.
6) Install tank pressure control valve.
1. Tank pipe
2. Purge pipe
3. Air pipe
4. Blow air
WARNING:
DO NOT SUCK air through tank pressure control valve.
Fuel vapor inside the valve is harmful.
4. To canister
5. From fuel tank
Page 380 of 656
ENGINE AND EMISSION CONTROL SYSTEM (SEQUENTIAL MULTIPORT FUEL INJECTION FOR H27 ENGINE) 6E2-47
PCV System
PCV hose
INSPECTION
Check hoses for connection, leakage, clog, and deterioration.
Replace as necessary.
PCV valve
ON-VEHICLE INSPECTION
1) Disconnect PCV valve from cylinder head cover and plug
head cover hole.
2) Run engine at idle.
3) Place your finger over end of PCV valve (1) to check for vac-
uum. If there is no vacuum, check for clogged valve. Replace
as necessary.
4) After checking vacuum, stop engine and remove PCV valve
(1). Shake valve and listen for the rattle of check needle
inside the valve (1). If valve does not rattle, replace.
5) After checking, connect PCV valve (1), PCV hose and clamp
securely. NOTE:
Be sure to check that there is no obstruction in PCV
valve or its hoses before checking engine idle speed/IAC
duty for obstructed PCV valve or hose hampers its accu-
rate checking.
Page 381 of 656
6E2-48 ENGINE AND EMISSION CONTROL SYSTEM (SEQUENTIAL MULTIPORT FUEL INJECTION FOR H27 ENGINE)
PCV system
PCV HOSE
Check hoses for connection, leakage, clog, and deterioration.
Replace as necessary.
Tightening Torque Specification
Special Tool
NOTE:
Be sure to check that there is no obstruction in PCV
valve or its hoses (6) before checking engine idle speed/
IAC duty for obstructed PCV valve or hose hampers its
accurate checking.
1. EVAP canister purge valve 4. EGR pipe
2. EVAP canister purge valve hose 5. EGR valve
3. Breather hose 6. PCV hose
Fastening partTightening torque
Nm kg-m lb-ft
Heated oxygen sensor 45 4.5 32.5
Fuel pressure regulator bolts 10 1.0 7.5
Fuel pipe union bolts 30 3.0 22.0
Engine coolant temp. sensor 15 1.5 11.0
09912-58441 09912-58431 09912-58490 09912-58421
Pressure gauge Pressure hose 3-way joint & hose Checking tool set
(See NOTE “A”.)
Page 384 of 656

IGNITION SYSTEM (FOR H27 ENGINE) 6F2-1
6F2
SECTION 6F2
IGNITION SYSTEM (FOR H27 ENGINE)
CONTENTS
General Description ...................................... 6F2-2
Components ................................................ 6F2-2
System Wiring ............................................. 6F2-3
Diagnosis ....................................................... 6F2-4
Diagnostic Flow Table ................................. 6F2-4
Ignition Spark Check ................................... 6F2-6
Ignition Timing Check and Adjustment........ 6F2-6On-Vehicle Service ....................................... 6F2-8
Ignition Coil Assembly (Igniter and Ignition
Coil)............................................................. 6F2-8
Spark Plug .................................................. 6F2-8
CMP Sensor.............................................. 6F2-10
Noise Suppressor ..................................... 6F2-12
Special Tool ................................................. 6F2-13
WARNING:
For vehicles equipped with Supplemental Restraint (Air Bag) System:
Service on and around the air bag system components or wiring must be performed only by an
authorized SUZUKI dealer. Refer to “Air Bag System Components and Wiring Location View” under
“General Description” in air bag system section in order to confirm whether you are performing ser-
vice on or near the air bag system components or wiring. Please observe all WARNINGS and “Ser-
vice Precautions” under “On-Vehicle Service” in air bag system section before performing service
on or around the air bag system components or wiring. Failure to follow WARNINGS could result in
unintentional activation of the system or could render the system inoperative. Either of these two
conditions may result in severe injury.
Technical service work must be started at least 90 seconds after the ignition switch is turned to the
“LOCK” position and the negative cable is disconnected from the battery. Otherwise, the system
may be activated by reserve energy in the Sensing and Diagnostic Module (SDM).