Page 152 of 656

ANTILOCK BRAKE SYSTEM (ABS) 5E2-27
DTC C1063 (DTC 63) – ABS Fail-Safe Relay Circuit
DESCRIPTION
ABS control module monitors the voltage at the terminal of solenoid circuit constantly with ignition switch turned
ON. Also, immediately after ignition switch is turned ON, perform initial check as follows.
Switch fail-safe relay in the order of OFF → ON and check if voltage changes to Low → High. If anything faulty is
found in the initial check and when the voltage is low with ignition switch turned ON, this DTC will be set.
INSPECTION
1. Ignition switch 3. ABS hydraulic unit/control module connector 5. Fail-safe relay
2. ABS hydraulic unit/control module assembly 4. To solenoid valves
Step Action Yes No
1 Check battery voltage. Is it about 11 V or
higher?Go to Step 2. Check charging system
referring to “CHARGING
SYSTEM” section.
2 Check ABS main fuse and connection.
Is it in good condition?Go to Step 3. Repair and/or replace
fuse.
3 1) Ignition switch OFF.
2) Disconnect ABS hydraulic unit/control mod-
ule connector.
3) Check proper connection to ABS hydraulic
unit/control module at terminal “E136-25”.
4) If OK, then measure voltage between con-
nector terminal “E136-25” and body ground.
Is it 10 – 14 V?Substitute a known-good
ABS hydraulic unit/con-
trol module assembly and
recheck.“WHT/BLU” circuit open
or short to ground.
Page 208 of 656

ENGINE GENERAL INFORMATION AND DIAGNOSIS (H27 ENGINE) 6-1-47
INSPECTION
Step Action Yes No
1 Main relay operating sound check :
Is operating sound of main relay heard at igni-
tion switch ON?Go to Step 5. Go to Step 2.
2 Fuse check :
Is main “FI” fuse in good condition?Go to Step 3. Check for short in circuits
connected to this fuse.
3 Main relay check :
1) Turn OFF ignition switch and remove main
relay.
2) Check for proper connection to main relay
at terminal 3 and 4.
3) If OK, check main relay for resistance and
operation referring to “MAIN RELAY
INSPECTION” in Section 6E2.
Is check result satisfactory?Go to Step 4. Replace main relay.
4 ECM (PCM) power circuit check :
1) Turn OFF ignition switch, disconnect con-
nectors from ECM (PCM) and install main
relay.
2) Check for proper connection to ECM (PCM)
at terminals C51-3-20, E61-9, C51-3-15 and
C51-3-4.
3) If OK, then measure voltage between termi-
nal C51-3-20 and ground, E61-9 and
ground with ignition switch ON.
Is each voltage 10 – 14 V?Go to Step 5. “BLK/WHT”, “BLU” or
“BLK/RED” circuit open.
5 ECM power circuit check :
1) Using service wire, ground terminal E61-9
and measure voltage between terminal
C51-3-15 and ground at ignition switch ON.
Is it 10 – 14 V?Check ground circuits
“BLK/GRN” and “BLK/
ORN” for open.
If OK, then substitute a
known-good ECM (PCM)
and recheck.Go to Step 6.
6 Is operating sound of main relay heard in Step
1?Go to Step 7. “BLK/RED” or “BLU/BLK”
wire open.
7 Main relay check :
1) Check main relay according to procedure in
Step 3.
Is main relay in good condition?“BLK/RED” or “BLU/BLK”
wire open.Replace main relay.
Page 594 of 656

AIR BAG SYSTEM 10B-17
TABLE TEST DESCRIPTION
Table A :
STEP 1 : Check “AIR BAG” fuse.
STEP 2 : Check power source circuit.
STEP 3 : Check “AIR BAG” warning lamp circuit.
Table B :
STEP 1 : Check combination meter power feed circuit.
STEP 2 : Check electrical connection check mechanism in SDM connector.
STEP 3 : Check “AIR BAG” warning lamp circuit.
STEP 4 : Check open in “AIR BAG” warning lamp circuit.
STEP 5 : Check short from “AIR BAG” warning lamp circuit to power circuit.
STEP 6 : Check “AIR BAG” bulb.
Table C and D :
STEP 1 : Check “AIR BAG” monitor coupler.
STEP 2 : Check diagnosis switch circuit for air bag system.
DIAGNOSTIC FLOW TABLE
Table A :
[A] Fig. for STEP 2/[B] Fig. for STEP 3
Special tool
(A) : 09932-75020 Step Action Yes No
1 1) Ignition switch OFF.
2) Remove and inspect “AIR BAG” fuse.
Is fuse good?Go to step 2.“BLU/RED” wire short to
ground.
After repair, replace “AIR
BAG” fuse.
2 1) Disconnect SDM connector
2) Check proper connection to SDM at termi-
nal “Q01-4”.
3) If OK then check voltage between “Q01-4”
terminal of SDM connector and body
ground with ignition switch ON.
Is it 8 V or more?Go to step 3.“BLU/RED” wire (between
“AIR BAG” fuse and SDM
connector) open “BLU/
BLK” wire (between igni-
tion switch and “AIR BAG”
fuse) open or short to
ground
3 1) Disconnect 16-pin connector from combina-
tion meter. Refer to COMBINATION
METER in SECTION 8C.
2) Check resistance between “Q01-2” termi-
nal of SDM connector and body ground.
Is circuit open?Substitute a known-good
SDM and recheck.“BLU” wire (between com-
bination meter and SDM
connector) short to
ground