2001 DODGE RAM Heat

[x] Cancel search: Heat

Page 1259 of 2889

DODGE RAM 2001  Service Repair Manual (8) Install the intake manifold bolts and tighten as
follows (Fig. 69):
²Step 1. Tighten bolts 1 through 4 to 8 N´m (72
in. lbs.) Tighten in alternating steps 1.4 N´m (12 in.
lbs.) at a time
²Step

Page 1260 of 2889

DODGE RAM 2001  Service Repair Manual Inspect mating surfaces of manifold for flatness
with a straight edge. Gasket surfaces must be flat
within 0.2 mm per 300 mm (0.008 inch per foot).
INSTALLATION
CAUTION: If the studs came out with the

Page 1273 of 2889

DODGE RAM 2001  Service Repair Manual (1) Perform the Fuel Pressure Release Procedure
(Refer to 14 - FUEL SYSTEM/FUEL DELIVERY -
STANDARD PROCEDURE).
(2) Disconnect the negative cable(s) from the bat-
tery.
(3) Inspect air cleaner, induct

Page 1274 of 2889

DODGE RAM 2001  Service Repair Manual (5) Remove the transmission oil cooler (Refer to 7 -
COOLING/TRANSMISSION/TRANS COOLER -
REMOVAL).
(6) Remove the washer bottle from the fan shroud.
(7) Remove the viscous fan/drive (Refer to 7 -
COOL

Page 1275 of 2889

DODGE RAM 2001  Service Repair Manual (21) Using a new gasket, install throttle body
(Refer to 14 - FUEL SYSTEM/FUEL INJECTION/
THROTTLE BODY - INSTALLATION).
(22) Connect the throttle linkage (Refer to 14 -
FUEL SYSTEM/FUEL INJECTION/THR

Page 1283 of 2889

DODGE RAM 2001  Service Repair Manual CYLINDER HEAD
DESCRIPTIONÐCYLINDER HEAD
The cast iron cylinder heads (Fig. 4) are mounted
to the cylinder block using ten bolts. The spark plugs
are located in the peak of the wedge between the
valve

Page 1284 of 2889

DODGE RAM 2001  Service Repair Manual Install Cooling System Tester 7700 or equivalent to
pressure cap neck. Start the engine and observe the
testers pressure gauge. If gauge pulsates with every
power stroke of a cylinder a combustion pr

Page 1285 of 2889

DODGE RAM 2001  Service Repair Manual (9) If required, adjust spark plugs to specifications.
Install the plugs and tighten to 41 N´m (30 ft. lbs.)
torque.
(10) Install coil wire.
(11) Connect heat indicator sending unit wire.
(12) Connec