ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-25
1. Main relay
2. Relay box
CRANKSHAFT POSITION SENSOR
INSPECTION
Check crankshaft position sensor referring to step 1 and 2 of DTC
P0335 Flow Chart. If malfunction is found, replace.
REMOVAL
1) Hoist vehicle.
2) Remove fender apron extension on right side.
3) Disconnect connector from crankshaft position sensor.
4) Remove crankshaft position sensor from oil pan.
INSTALLATION
1) Check to make sure that crankshaft position sensor and pulley
tooth is free from any metal particles and damage.
2) Install crankshaft position sensor to oil pan.
3) Connect connector to it securely.
4) Install fender apron extension.
MAIN RELAY
INSPECTION
1) Disconnect negative cable at battery.
2) Remove main relay from relay box.
3) Check resistance between each two terminals as in table below.
If check results are as specified, proceed to next operation
check. If not, replace.
TERMINALS
RESISTANCE
Between A and B∞ (infinity)
Between C and D100 – 120 Ω
4) Check that there is continuity between terminals “A” and “B”
when battery is connected to terminals “C” and “D”.
If found defective, replace.
6E1-26 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
1. Throttle body
FUEL PUMP RELAY
INSPECTION
1) Disconnect negative cable at battery.
2) Remove fuel pump relay (1) from relay box (2).
3) Structure of fuel pump relay is the same as that of main relay.
Check its resistance and operation using the same procedure as
that for main relay.
If found defective, replace.
FUEL INJECTOR RESISTOR
INSPECTION
1) With ignition switch OFF, disconnect resistor coupler.
2) Check resistor (1) for resistance.
Resistance: 1.9 – 2.1 Ω at 20C, 68F
If check result is not satisfied, replace.
FUEL CUT OPERATION
INSPECTION
NOTE:
Before inspection, check to make sure that gear shift lever is in
neutral position (with A/T model, selector lever in “P” range), A/C
is OFF and that parking brake lever is pulled all the way up.
1) Warm up engine to normal operating temperature.
2) While listening to sound of injector by using sound scope (2) or
such, increase engine speed to higher than 3,000 r / min.
3) Check to make sure that sound to indicate operation of injector
stops when throttle valve operation of injector stops when
throttle valve is closed instantly and it is heard again when en-
gine speed is reduced to less than about 2,000 r / min.
IDLE SPEED CONTROL SYSTEM
SYSTEM INSPECTION
NOTE:
Before inspection, check to make sure that:
–Gear shift lever is in neutral position (with A / T vehicle, selec-
tor lever in “P” range) and that parking brake lever is pulled
all the way up.
–Battery voltage is higher than 11 V.
–Throttle valve moves smoothly.
–Ambient temperature is higher than 0C (32F)
ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-27
1) Connect scan tool to DLC with ignition switch OFF, if it is avail-
able.
2) Warm up engine to normal operating temperature.
3) Select “Data List” mode on scan tool to check “IAC duty”.
4) Apply load to engine as described below and check that idle
speed is kept at specified level and “IAC duty” increases as spe-
cified below. At the same time, check that plunger of ISC actua-
tor moves.
Increase of ISC duty
when headlight turns ON : About 3.5%
when A / C is operating : About 10%
5) Stop engine and leave it as it is till it cools off. Then check that
plunger of ISC actuator moves when ignition switch is turned
from OFF to ON once.
If abnormality is found in Steps 4) and 5), check ISC relay, ISC
actuator, ISC electric circuit and closed throttle position switch
signal.
If abnormality is found in Step 4) only, check A/C signal circuit
or power steering pressure switch signal circuit first.
ISC ACTUATOR
NOTE:
As ISC actuator has been preadjusted precisely at factory, it must
not be taken out of throttle body or disassembled.
INSPECTION
1) Disconnect connector from ISC actuator.
2) Check whether ISC actuator coil is open or short.
ISC actuator resistance at 20C (68F): 3 – 50 Ω
NOTE:
Above data should be used as reference value for determin-
ing whether coil is open or short only. ISC actuator resis-
tance may be out of above specified range even when ISC
actuator is normal.
ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-29
1. ISC actuator relay
2. Relay box
1. EFE heater
2. Rubber cover
3.“Red” wire
4.“Black” wire
ISC ACTUATOR RELAY
INSPECTION
1) Disconnect negative cable at battery.
2) Remove ISC actuator relay from relay box.
3) Structure of ISC actuator relay is the same as that of main relay.
Check its resistance and operation using the same procedure as
that for main relay.
EFE HEATER CONTROL SYSTEM
SYSTEM CIRCUIT INSPECTION
NOTE:
Before inspection, check to make sure that gear shift lever is
in neutral position (with A/T model, selector lever in “P” range)
and that parking brake lever is pulled all the way up.
1) Turn up rubber cover of EFE heater to expose terminal-to-wire
connections.
2) Connect voltmeter to EFE terminals and check for voltage under
each condition given below.
CONDITION
VOLTAGE
Fast idle condition
Coolant temp.: below 80C (176F)
Engine speed: over 750 r/min.Battery
voltage
After warming up (other than above)No voltage
If check results are not as specified in above table, check EFE
heater, relay and wire harness.
3) Cover EFE heater connections with rubber cover.
EFE HEATER
CAUTION:
Do not bend wire harness of EFE heater excessively.
ON-VEHICLE INSPECTION
1) Disconnect EFE heater coupler.
2) Check resistance of EFE heater.
If it is not as specified below, replace.
EFE heater resistance: 0.5 – 3.0 Ω at 20C (68F)
3) Connect EFE heater coupler securely.
REMOVAL
1) Remove throttle body according to procedure described pre-
viously.
In this case, however, it is not necessary to disconnect fuel
hoses and engine cooling water hoses from throttle body.
2) Disconnect EFE heater coupler.
3) Remove EFE heater from intake manifold.
6E1-30 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
1. Insulator
2. Lower gasket
3. Heater
1. Intake manifold
2. EFE heater
1. EFE heater relay
2. Relay box
1. Radiator fan motor
INSPECTION
Check lower gasket for damage and deterioration. Replace as
necessary.
Check heater and insulator for crack, corrosion or any other dam-
age. Replace as necessary.
INSTALLATION
1) Clean mating surfaces of throttle body and intake manifold that
mate with EFE heater.
2) Install EFE heater to intake manifold.
Use new upper gasket.
3) Install throttle body according to procedure described previous-
ly.
4) Connect EFE heater coupler.
EFE HEATER RELAY
INSPECTION
1) Disconnect negative cable at battery.
2) Remove EFE heater relay from relay box.
3) Structure of EFE heater relay is the same as that of main relay.
Check its resistance and operation using the same procedure as
that for main relay.
If found defective, replace.
RADIATOR FAN CONTROL SYSTEM
SYSTEM INSPECTION
WARNING:
Keep hands, tools, and clothing away from engine cooling
fan to help prevent personal injury. This fan is electric and
can come on whether or not the engine is running. The fan
can start automatically in response to the ECT sensor with
the ignition switch in the “ON” position.
Connect SUZUKI scan tool (2) to DLC (3).
Start engine and keep it running to warm it up.
Now check to ensure that radiator fan is started when the coolant
temperature displayed on SUZUKI scan tool reaches 96C
(205F).
If check result is not satisfactory, check RFC relay, wire harness,
ECT sensor, ECM, coolant temp. meter and sender gauge unit.
Refer to “DTC P0480 FLOW TABLE” of Section 6 and “COOLANT
TEMP. METER AND GAUGE UNIT” of Section 8.
ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-31
1. RFC relay
2. Relay box
RADIATOR FAN CONTROL RELAY (RFC RELAY)
INSPECTION
1) Disconnect negative cable at battery.
2) Remove RFC relay from relay box.
3) Structure of RFC relay is the same as that of main relay.
Check its resistance and operation using the same procedure as
that for main relay. If found defective, replace.
RADIATOR FAN
INSPECTION
1) Disconnect negative cable at battery.
2) Disconnect radiator fan motor connector.
3) Connect battery to the motor and check for operation.
If fan fails to operate, replace.
6E2
ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13) 6E2-1
GENERAL DESCRIPTION6E2- 2 . . . . . . . . . . . . . .
AIR INTAKE SYSTEM 6E2- 6. . . . . . . . . . . . . . . . . .
FUEL DELIVERY SYSTEM 6E2- 7. . . . . . . . . . . . . .
ELECTRONIC CONTROL SYSTEM 6E2- 8. . . . . .
Engine and Emission Control Input /
Output Table 6E2- 9. . . . . . . . . . . . . . . . . . . . . . . .
DIAGNOSISSee Section 6. . . . . . . . . . . . . . . . . . . . .
ON-VEHICLE SERVICE6E2-13 . . . . . . . . . . . . . . . .
Accelerator Cable Adjustment 6E2-13. . . . . . . . . .
Idle Speed/Idle Air Control (IAC)
Duty Inspection 6E2-14. . . . . . . . . . . . . . . . . . . . .
AIR INTAKE SYSTEM 6E2-15. . . . . . . . . . . . . . . . . .
Throttle Body 6E2-15. . . . . . . . . . . . . . . . . . . . . . . .
Idle Air Control Valve 6E2-17. . . . . . . . . . . . . . . . .
FUEL DELIVERY SYSTEM 6E2-18. . . . . . . . . . . . . .
Fuel Pressure Inspection 6E2-18. . . . . . . . . . . . . .
Fuel Pump 6E2-21. . . . . . . . . . . . . . . . . . . . . . . . . . .
Fuel Pressure Regulator 6E2-22. . . . . . . . . . . . . . .
Fuel Injector 6E2-23. . . . . . . . . . . . . . . . . . . . . . . . .
ELECTRONIC CONTROL SYSTEM 6E2-27. . . . . .
ECM / PCM 6E2-27. . . . . . . . . . . . . . . . . . . . . . . . . .
MAP Sensor 6E2-27. . . . . . . . . . . . . . . . . . . . . . . . .
TP Sensor 6E2-28. . . . . . . . . . . . . . . . . . . . . . . . . . .
IAT Sensor 6E2-29. . . . . . . . . . . . . . . . . . . . . . . . . .
ECT Sensor 6E2-30. . . . . . . . . . . . . . . . . . . . . . . . . Heated Oxygen Sensor -1 and -2 6E2-31. . . . . . .
Camshaft Position Sensor 6E2-32. . . . . . . . . . . . .
Crankshaft Position Sensor 6E2-32. . . . . . . . . . . .
Vehicle Speed Sensor 6E2-33. . . . . . . . . . . . . . . . .
Fuel Level Sensor (gauge) 6E2-33. . . . . . . . . . . . .
Main Relay, Fuel Pump Relay and
Radiator Fan Control Relay 6E2-33. . . . . . . . . . .
Fuel Cut Operation (Inspection) 6E2-34. . . . . . . .
Radiator Fan Control System 6E2-34. . . . . . . . . .
System Inspection 6E2-34. . . . . . . . . . . . . . . . . .
Radiator Fan 6E2-34. . . . . . . . . . . . . . . . . . . . . . .
EMISSION CONTROL SYSTEM 6E2-35. . . . . . . . .
EGR System 6E2-35. . . . . . . . . . . . . . . . . . . . . . . . .
EVAP Control System 6E2-36. . . . . . . . . . . . . . . . .
EVAP Canister Purge Inspection 6E2-36. . . . . .
Vacuum Passage Inspection 6E2-37. . . . . . . . .
Vacuum Hose Inspection 6E2-37. . . . . . . . . . . .
EVAP Canister Purge Valve
Inspection 6E2-37. . . . . . . . . . . . . . . . . . . . . . . .
EVAP Canister Inspection 6E2-38. . . . . . . . . . .
PCV System 6E2-38. . . . . . . . . . . . . . . . . . . . . . . . .
PCV Hose Inspection 6E2-38. . . . . . . . . . . . . . .
PCV Valve Inspection 6E2-38. . . . . . . . . . . . . . .
SPECIAL TOOLS6E2-39 . . . . . . . . . . . . . . . . . . . . . .
TIGHTENING TORQUE
SPECIFICATIONS6E2-39 . . . . . . . . . . . . . . . . . . . . .
SECTION 6E2
ENGINE AND EMISSION CONTROL SYSTEM
(SFI FOR G13)
WARNING:
For vehicles equipped with Supplemental Restraint (Air Bag) System:
Service on and around the air bag system components or wiring must be performed only by an autho-
rized SUZUKI dealer. Refer to “Air Bag System Components and Wiring Location View” under “Gener-
al Description” in air bag system section in order to confirm whether you are performing service on
or near the air bag system components or wiring. Please observe all WARNINGS and “Service Precau-
tions” under “On-Vehicle Service” in air bag system section before performing service on or around
the air bag system components or wiring. Failure to follow WARNINGS could result in unintentional
activation of the system or could render the system inoperative. Either of these two conditions may
result in severe injury.
Technical service work must be started at least 90 seconds after the ignition switch is turned to the
“LOCK” position and the negative cable is disconnected from the battery. Otherwise, the system may
be activated by reserve energy in the Sensing and Diagnostic Module (SDM).
CONTENTS
6E2-8 ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13)
INFORMATION SENSORS
-1. MAP sensor
-2. TP sensor
-3. IAT sensor
-4. ECT sensor
-5. Heated oxygen sensor-1
5-1. Heated oxygen sensor-2
-6. VSS (A / T)
-7. Transmission range switch (A / T)
-8. Battery
-9. CMP sensor
-10. CKP sensor
-11. Fuel level sensor (gauge) (in fuel tank)
-12. PSP switch
-13. A / C control module (if equipped)
-14. VSS (speedometer) (M / T)OTHERS
A: ECM (PCM)
B: Main relay
C: EVAP canister
D: Data link connector CONTROL DEVICES
a: Fuel injector
b: EVAP canister purge valve
c: Fuel pump relay
d: EGR valve (step motor)
e: Malfunction indicator lamp
f: Ignition coil assembly
g: Radiator fan control relay
h: IAC valve
The electronic control system consists of 1) various
sensors which detect the state of engine and driving
conditions, 2) ECM (PCM) which controls various de-
vices according to the signals from the sensors and
3) various controlled devices.
Functionally, it is divided into nine sub systems:
Fuel injection control system
Idle speed control systemFuel pump control system
A / C control system (if equipped)
Radiator fan control system
EGR system
Evaporative emission control system
Oxygen sensor heater control system
Ignition control system
Also, with A / T model, PCM controls A / T.
ELECTRONIC CONTROL SYSTEM