Page 65 of 259
Downloaded from www.Manualslib.com manuals search engine ENGINE
62
AUXILIARY EQUIPMENT DRIVE BELT
Engine : XFX
Tools
[1] Ratchet S.171 FACOM (1/2 square) S 171.
[2] Reduction box S.230 FACOM (1/2-3/8) S 230.
Remove.
Remove the engine cover.
Pivot the tensioner roller bracket (1) clockwise, until it locks, using tools[1]
and [2]at «a».
Remove the auxiliary equipment drive belt.
ESSENTIAL : Check that the guide rollers are turning freely.
(No play and no tightness).
Refit.
Refit the auxiliary equipment drive belt:
Respect the following order of assembly:
- The crankshaft pulley (2).
- The tensioner roller (3).
Release the tensioner roller bracket (1), by turning it anti-clockwise, using
tools [1] and [2].
ESSENTIAL : Make sure that the belt is correctly positioned in the
grooves of the various pulleys.
B1BP27ECB1BP27FC
Page 67 of 259
Downloaded from www.Manualslib.com manuals search engine ENGINE
64
AUXILIARY EQUIPMENT DRIVE BELT
Engines : RHY - RHZ
Without air conditioning (continued)
Refit.
Re-used belt.
- Compress the tensioner roller(2)by action at «a»(anti-clockwise), tool [4].
- Refit the belt.
WARNING : Respect the direction in which the belt is fitted.
- Remove the tool [4].
New belt.
- Refit the belt.
- Turn the eccentric roller (3), tool[1] (clockwise)to free the tool [2]from its pegging at «b».
- Hold the eccentric roller (3), tool [1], and tighten the screw(1) to 4.3 ± 0.4 m.daN.
- Remove the tool [2].
- Rotate the crankshaft 4 times in the direction of rotation.
- Check that it is possible to peg at «b», tool [3].
- If not possible to peg, restart the adjustment.
B1BP1YMD
Page 69 of 259
Downloaded from www.Manualslib.com manuals search engine ENGINE
66
AUXILIARY EQUIPMENT DRIVE BELT
Engines : RHY - RHZ
With air conditioning (continued)
Refit.
Re-used belt.
- Compress the tensioner roller (7)by action at «c»(in anti-clockwise direction), tool [4].
- Refit the belt.
WARNING : Respect the direction in which the belt is fitted.
- Remove the tool [4].
New belt.
- Refit the belt.
- Turn the eccentric roller (5), tool [1](clockwise)to free the tool [2]from its pegging at «d».
- Hold the eccentric roller (5), tool [1], and tighten the screw (6)to 4.3 ± 0.5 m.daN.
- Remove the tool [2].
- Rotate the crankshaft 4 times in the normal direction of rotation.
- Check that it is possible to peg at «d», tool [3].
- If not possible to peg, restart the adjustment..
B1BP1YND
Page 72 of 259
Downloaded from www.Manualslib.com manuals search engine ENGINE
69 Petrol Diesel
EW ES DW
7 10 9 10 12
J4 J4D J4 TD ATED TED4
1.8i 16V 2.0i 16V 3.0i V6 2.0 HDi 2.2 HDi
Engine plate 6FZ RFN RLZ XFX RHY RHZ 4HX
CITROËN C5 X X X X X X X
See pages 70 to 73 74 to 79 80 to 84 85 to 90
CHECKING AND SETTING THE VALVE TIMING
Page 73 of 259
![Citroen C5 2000 (DC/DE) / 1.G Owners Manual Downloaded from www.Manualslib.com manuals search engine ENGINE
70 TOOLS
[1]Camshaft setting pegs : (-).0189.A
[2]Crankshaft setting peg : (-).0189.B Tool kit C.0189.
[3]Belt retaining pin : (-). Citroen C5 2000 (DC/DE) / 1.G Owners Manual Downloaded from www.Manualslib.com manuals search engine ENGINE
70 TOOLS
[1]Camshaft setting pegs : (-).0189.A
[2]Crankshaft setting peg : (-).0189.B Tool kit C.0189.
[3]Belt retaining pin : (-).](/manual-img/9/4134/w960_4134-72.png)
Downloaded from www.Manualslib.com manuals search engine ENGINE
70 TOOLS
[1]Camshaft setting pegs : (-).0189.A
[2]Crankshaft setting peg : (-).0189.B Tool kit C.0189.
[3]Belt retaining pin : (-).0189.K
[4]Adaptor for angular tightening : 4069-T
[5]Hub immobilising tool : 6310-T
Checking the valve timing.
- Turn the engine by the crankshaft pinion screw (1)to bring it to pegging position.
- Peg the crankshaft, using tool [2].
- Peg the camshaft pulleys, using tools [1].
NOTE : The pegs [1] should engage without effort.
WARNING : If the pegs do not engage without effort, restart the fitting and
tensioning of the timing belt (see below).
Setting the valve timing.
Remove.- Remove the screws (2), the pulley (1), upper valve cover (4), lower valve cover (3).
- Turn the engine by the screw (13)of the pinion (12)to bring it to pegging position.
- Peg the pulleys (8) and (9)using tools [1].
- Peg the pinion(12)using tool [2].
- Loosen the screw(7)of the tensioner roller (6).
- Turn the tensioner roller(6)(clockwise).
- Remove the timing belt(10).
CHECKING AND SETTING THE VALVE TIMING
Engines : 6FZ - RFN - RLZ
B1EP14JDB1BP23XCB1BP25PCB1BP22SC
Page 74 of 259
![Citroen C5 2000 (DC/DE) / 1.G Owners Manual Downloaded from www.Manualslib.com manuals search engine ENGINE
71
Refit (continued)
- Refit the belt (10)on the pinion (12).
- Hold the belt(10)with tool [3].
- Position the belt (10)in the following Citroen C5 2000 (DC/DE) / 1.G Owners Manual Downloaded from www.Manualslib.com manuals search engine ENGINE
71
Refit (continued)
- Refit the belt (10)on the pinion (12).
- Hold the belt(10)with tool [3].
- Position the belt (10)in the following](/manual-img/9/4134/w960_4134-73.png)
Downloaded from www.Manualslib.com manuals search engine ENGINE
71
Refit (continued)
- Refit the belt (10)on the pinion (12).
- Hold the belt(10)with tool [3].
- Position the belt (10)in the following order :
- The guide roller (11), the inlet camshaft pinion(9), the exhaust camshaft pinion (8), the water pump(5), the
tensioner roller (6).
NOTE :Make sure that the belt (10)is as flush as possilble with the outer face of the various pinions and rollers.
- Remove the tools [3]and[1].
T
iming belt.Adjusting the tension.- Turn the roller(6)in the direction of the arrow «b» ; using an Allen key at «a».
- Position the index «c»in its maximum setting at «d».
IMPERATIVE : The index «c» must stand proud of the notch «f» by an angular value of 10°. If it does not,
replace the tensioner roller (6) or the timing belt and the tensioner roller (6)
Bring the index «c»to its adjusting position «f»by turning the tensioner roller (6)in the direction of the arrow «e».
WARNING: The index«c»must not stand proud of the notch «f»: if it does, restart the timing belt tensioning
operation.
IMPERATIVE : The tensioner roller (6) must not turn while its fixing is being tightened up. If it does,
recommence the adjusting operation.
CHECKING AND SETTING THE VALVE TIMING
Engines : 6FZ - RFN - RLZ
B1EP14KCB1EP14JD
Page 75 of 259

Downloaded from www.Manualslib.com manuals search engine ENGINE
72
Adjusting the tension (continued).- Tighten the screw (7) of the the tensioner roller(6) to 2.1 ± 0.2 m.daN.
IMPERATIVE : The hexagonal drive of the tensioner roller (6) must be at 15° below the level of the cylinder
head gasket «g». If not, replace the tensioner roller (6) or the timing belt and the tensioner roller (6).
Refit (continued).
- Remove the tools [1]et [2].
- Turn the crankshaft 10 timesin the normal direction of rotation.
IMPERATIVE : No pressure or outside action must be brought to bear on the timing belt.
- Peg the inlet camshaft pulley, using the tool [1].
Checks.
Timing belt tension.
IMPERATIVE : Check the position of the index «c», it should be facing the notch «f». If the position of index «c»
is not correct, restart the adjustment of its position.
Positioning of the crankshaft.
- Fit tool [2].
- As long as it is possible to fit tool[2], continue with the refit operations.
IMPERATIVE : If it is not possible to fit tool [2], reposition the flange (14).
CHECKING AND SETTING THE VALVE TIMING
Engines : 6FZ - RFN - RLZ
B1EP14VCB1EP14MC
Page 76 of 259
Downloaded from www.Manualslib.com manuals search engine ENGINE
73
Checks (continued)
Repositioning the flange.- Immobilise the crankshaft using tool [5].
- Loosen the screw(13).
- Release the pinion (12) of the crankshaft.
- Bring the flange (14) to the pegging position; using tool [5].
- Fit the tool [2].
- Immobilise the crankshaft using tool [5].
- Tighten screw (13) to 4 ± 0.4 m.daN, then angular tighten to :
53°±4°(Assembly with steel washer, gold in colour)
40°±4°(Assembly with sintered washer, metallic in colour)
using the tool [4].
- Remove tools [1]. [2]and [5].
Refit :
- The lower valve cover (3).
- The upper valve cover(4).
- The crankshaft pulley (1).
- The screws(2).
- Pretighten the screws (2)to 1.5 m.daN.
- Tighten the screws (2)to 2.1 ± 0.5 m.daN.
CHECKING AND SETTING THE VALVE TIMING
Engines : 6FZ - RFN - RLZ
B1BP23XCB1EP14PC