ELECTRICAL SPECIFICATIONSSPEC
2 - 15
ELECTRICAL SPECIFICATIONS
Item Standard Limit
System voltage12 V ----
Ignition system
Ignition system type C.D.I. ----
Ignition timing 5˚ BTDC at 1,100 r/min ----
Advanced timing 55˚ BTDC at 5,000 r/min ----
Advancer type Throttle position sensor and electrical ----
Pickup coil resistance/color 421 ~ 569 W / Gy–B ----
C.D.I. unit model (manufacturer) F8T19371 (MITSUBISHI) ----
Ignition coils
Model (manufacturer) F6T549 (MITSUBISHI) ----
Minimum ignition spark gap 6 mm (0.24 in) ----
Primary coil resistance 0.16 ~ 0.21 W ----
Secondary coil resistance 5.0 ~ 6.8 kW ----
Throttle position sensor standard
resistance4 ~ 6 kW----
Charging system
System type AC magneto ----
Model (manufacturer) F4T254 (MITSUBISHI) ----
Nominal output 14 V / 22.5 A at 5,000 r/min ----
Stator coil resistance 0.38 ~ 0.46 W at 20˚C (68˚F) ----
Rectifier/regulator
Regulator type Semiconductor-short circuit ----
Model SH650D-11 (SHINDENGEN) ----
No-load regulated voltage 14.1 ~ 14.9 V ----
Capacity 18 A ----
Withstand voltage 200 V ----
Battery
Battery type GT9B-4 ----
Battery voltage/capacity 12V / 8AH ----
Headlight typeHalogen bulb
Indicator light type ´ quantityLED ´ 5
Bulbs (voltage/wattage ´ quantity)
Headlight R. 12 V 60 W ´ 1 / L. 12 V 51 W ´ 1 ----
Auxiliary light 12 V 5 W ´ 2 ----
Tail/brake light 12 V 5 W / 21 W ´ 1 ----
Front turn signal light 12 V 21 W ´ 2 ----
Rear turn signal light 12 V 21 W ´ 2 ----
Meter light 12 V 1.4 W ´ 2 ----
8 - 6
–+ELECCHECKING THE BULBS AND BULB SOCKETS
CHECKING THE CONDITION OF THE BULB
SOCKETS
The following procedure applies to all of
the bulb sockets.
1.Check:
• bulb socket (for continuity)
(with the pocket tester)
No continuity ® Replace.
NOTE:
Check each bulb socket for continuity in the
same manner as described in the bulb sec-
tion; however, note the following.
t t t t t t t t t t t t t t t t t t t t t t t t t t t t
a. Install a good bulb into the bulb socket.
b. Connect the pocket tester probes to the
respective leads of the bulb socket.
c. Check the bulb socket for continuity. If
any of the readings indicate no continu-
ity, replace the bulb socket.
s s s s s s s s s s s s s s s s s s s s s s s s s s s s
CHECKING THE LEDs
The following procedure applies to all of
the LEDs.
1.Check:
LED (for proper operation)
t t t t t t t t t t t t t t t t t t t t t t t t t t t t
a. Disconnect the meter assembly coupler
(meter assembly side).
b. Connect two jumper leads 1 from the
battery terminals to the respective cou-
pler terminals as shown.
WARNINGWARNING
• A wire that is used as a jumper lead must
have at least the same capacity of the
battery lead, otherwise the jumper lead
may burn.
• This check is likely to produce sparks,
therefore make sure that no flammable
gas or fluid is in the vicinity.
c. When the jumper leads are connected to
the terminals the respective LED should
illuminate.
Does not light ® Replace the meter
assembly.
s s s s s s s s s s s s s s s s s s s s s s s s s s s s
Pocket tester
90890-03112