1998 MITSUBISHI MONTERO engine

[x] Cancel search: engine

Page 570 of 1501

MITSUBISHI MONTERO 1998  Service Manual Fig. 18:  Measuring Connecting Rod Side Clearance - Typical
This Graphic For General Information Only
         Check for improper bearing installation, wrong bearing cap
or insufficient bearing cleara

Page 572 of 1501

MITSUBISHI MONTERO 1998  Service Manual          CRANKSHAFT & MAIN BEARINGS
          * PLEASE READ THIS FIRST *
NOTE:    Always refer to appropriate engine overhaul article in the
         ENGINES section for complete overhaul procedures a

Page 573 of 1501

MITSUBISHI MONTERO 1998  Service Manual with tip resting on the main bearing journal area. See Fig. 21.
Rotate crankshaft and note reading. Journal runout must not exceed
specification. Repeat procedure on all main bearing journals.
Cranksh

Page 575 of 1501

MITSUBISHI MONTERO 1998  Service Manual          CYLINDER BLOCK
          * PLEASE READ THIS FIRST *
NOTE:    Always refer to appropriate engine overhaul article in the
         ENGINES section for complete overhaul procedures and

Page 577 of 1501

MITSUBISHI MONTERO 1998  Service Manual NOTE:    Always refer to appropriate engine overhaul article in the
         ENGINES section for complete overhaul procedures and
         specifications for the vehicle being repaired.
         CLEAN

Page 578 of 1501

MITSUBISHI MONTERO 1998  Service Manual          * PLEASE READ THIS FIRST *
NOTE:    Always refer to appropriate engine overhaul article in the
         ENGINES section for complete overhaul procedures and
         specifications for the ve

Page 579 of 1501

MITSUBISHI MONTERO 1998  Service Manual manufacturer. See Fig. 24.
Fig. 24:  Timing Gear Mark Alignment - Typical
This Graphic For General Information Only
         TIMING BELTS
         Cogged tooth belts are commonly used on overhead cam

Page 582 of 1501

MITSUBISHI MONTERO 1998  Service Manual          * PLEASE READ THIS FIRST *
NOTE:    Always refer to appropriate engine overhaul article in the
         ENGINES section for complete overhaul procedures and
         specifications for the ve