3. Fit the five bolts which secure the adaptor assembly to the cylinder head.
4. Fit new seals to the fuel rail.
2. Fit the fuel rail to the intercooler adaptor.
1. Align the fuel rail to the adaptor; still connected to the fuel crossover pipe and fuel return pipe. Locate
the fuel rail into the adaptor.
2. Fit the three bolts which secure the fuel rail to the adaptor.
3. Connect the fuel injector harness.
1. Reposition the harness.
2. Tighten the nuts which secure the harness to the
camshaft cover.
3. Connect the multi-plugs to the A-Bank injectors.
4. Fit the A-Bank intercooler. Refer to Operation 18.50.18.
5. Fit the supercharger assembly. Refer to operation 18.50.15.
6. Fit the supercharger drive belt . Refer to Operation 18.50.08.
7. Fit the coolant output pipe. Refer to Operation 26.31.08.
8. Fit the throttle induction elbow. Refer to Operation 19.70.28.
9. Fit the throttle housing. Refer to Operation 19.70.04.
10. Fit the supercharger outlet duct and gasket. Refer to
Operation 18.50.17.
11. Fit the intake tube / air flow meter / air cleaner cover
assembly.
1. Fit a new rubber seal; air in take tube to throttle body.
2. Fit the intake tube / air flow meter / air cleaner cover
assembly.
Page 741 of 2490

Installation
19.70.28.
15. Remove the supercharger outlet duct and gasket. Refer to
Operation 18.50.17.
16. Remove the coolant output pipe. Refer to Operation (SC)
26.31.08.
17. Remove the supercharger driv e belt. Refer to Operation
18.50.08.
18. Remove the supercharger as sembly. Refer to operation
18.50.15.
19. Remove the B-Bank intercooler. Refer to Operation 18.50.19.
20. Disconnect the fuel injector harness.
1. Disconnect the multi-plugs from the B-Bank injectors.
2. Loosen, do not remove, the nuts which secure the
harness to the camshaft cover.
3. Reposition the harness for access.
21. Remove the fuel rail.
1. Remove the three bolts whic h secure the fuel rail to
the intercooler adaptor.
2. Remove the fuel rail from the adaptor; still connected
to the fuel crossover pi pe and fuel feed pipe.
22. Remove the intercoole r adaptor assembly.
1. Remove and discard the seals from the fuel rail.
2. Remove the five bolts which secure the adaptor
assembly to the cylinder head.
3. Remove the adaptor assembly from the cylinder head.
Remove the gasket; adaptor assembly to cylinder head.
23. Clean and inspect all relevant mating faces.
1. Fit the intercooler adaptor assembly.
1. Fit a new gasket; adaptor assembly to cylinder head.
2. Align and fit the adaptor assembly to the cylinder head.
Page 742 of 2490

3. Fit the five bolts which secure the adaptor assembly to the cylinder head.
4. Fit new seals to the fuel rail.
2. Fit the fuel rail to the intercooler adaptor.
1. Align the fuel rail to the adaptor; still connected to the fuel crossover pipe and fuel feed pipe. Locate the
fuel rail into the adaptor.
2. Fit the three bolts which secure the fuel rail to the adaptor.
3. Connect the fuel injector harness.
1. Reposition the harness.
2. Tighten the nuts which secure the harness to the
camshaft cover.
3. Connect the multi-plugs to the B-Bank injectors.
4. Fit the B-Bank intercooler. Refer to Operation 18.50.19.
5. Fit the supercharger assembly. Refer to operation 18.50.15.
6. Fit the supercharger drive belt . Refer to Operation 18.50.08.
7. Fit the coolant output pipe. Refer to Operation (SC) 26.31.08.
8. Fit the throttle induction elbow. Refer to Operation 19.70.28.
9. Fit the throttle housing. Refer to Operation 19.70.04.
10. Fit the supercharger outlet duct and gasket. Refer to
Operation 18.50.17.
11. Fit the intake tube / air flow meter / air cleaner cover
assembly.
1. Fit a new rubber seal; air in take tube to throttle body.
2. Fit the intake tube / air flow meter / air cleaner cover
assembly.
Page 746 of 2490

Installation
19.70.28.
15. Remove the supercharger outlet duct and gasket. Refer to
Operation 18.50.17.
16. Remove the coolant output pipe. Refer to Operation (SC)
26.31.08.
17. Remove the supercharger driv e belt. Refer to Operation
18.50.08.
18. Remove the supercharger as sembly. Refer to operation
18.50.15.
19. Remove the A-Bank intercooler. Refer to Operation 18.50.18.
20. Disconnect the fuel injector harness.
1. Disconnect the multi-plugs from the A-Bank injectors.
2. Loosen, do not remove, the nuts which secure the
harness to the camshaft cover.
3. Reposition the harness for access.
21. Remove the fuel rail.
1. Remove the three bolts whic h secure the fuel rail to
the intercooler adaptor.
2. Remove the fuel rail from the adaptor; still connected
to the fuel crossover pipe and fuel return pipe.
22. Remove the intercoole r adaptor assembly.
1. Remove and discard the seals from the fuel rail.
2. Remove the five bolts which secure the adaptor
assembly to the cylinder head.
3. Remove the adaptor assembly from the cylinder head.
Remove the gasket; adaptor assembly to cylinder head.
23. Clean and inspect all relevant mating faces.
1. Fit the intercooler adaptor assembly.
1. Fit a new gasket; adaptor assembly to cylinder head.
2. Align and fit the adaptor assembly to the cylinder head.
Page 747 of 2490

3. Fit the five bolts which secure the adaptor assembly to the cylinder head.
4. Fit new seals to the fuel rail.
2. Fit the fuel rail to the intercooler adaptor.
1. Align the fuel rail to the adaptor; still connected to the fuel crossover pipe and fuel return pipe. Locate
the fuel rail into the adaptor.
2. Fit the three bolts which secure the fuel rail to the adaptor.
3. Connect the fuel injector harness.
1. Reposition the harness.
2. Tighten the nuts which secure the harness to the
camshaft cover.
3. Connect the multi-plugs to the A-Bank injectors.
4. Fit the A-Bank intercooler. Refer to Operation 18.50.18.
5. Fit the supercharger assembly. Refer to operation 18.50.15.
6. Fit the supercharger drive belt . Refer to Operation 18.50.08.
7. Fit the coolant output pipe. Refer to Operation 26.31.08.
8. Fit the throttle induction elbow. Refer to Operation 19.70.28.
9. Fit the throttle housing. Refer to Operation 19.70.04.
10. Fit the supercharger outlet duct and gasket. Refer to
Operation 18.50.17.
11. Fit the intake tube / air flow meter / air cleaner cover
assembly.
1. Fit a new rubber seal; air in take tube to throttle body.
2. Fit the intake tube / air flow meter / air cleaner cover
assembly.
Page 800 of 2490

15. Loosen the bolt which secures the VVT unit.
Do not tamper with the three bolts which secure the VVT
mechanism to the sprockets. It is sealed at the factory to
the correct valve timing specif ication for the engine and is
supplied only as a complete unit.
16. Remove the primary chain tens ioner. Refer to operation
12.65.55, in this Section.
17. Remove the primary ch ain tensioner blade.
1. Remove the pivot bolt which secures the tensioner blade.
2. Remove the tensioner blade.
18. Reposition the VVT unit along the cam journal to allow the
chain to clear the head casting.
Disconnect the primary chain from the VVT unit and
reposition it against the crankshaft sprocket.
19. Remove the VVT unit.
1. Remove the securing bolt from the VVT unit and the exhaust cam sprocket.
2. Remove the VVT unit, exhaust sprocket and secondary chain as an asse mbly (release the chain
from the tensioner which is still secured to the
cylinder head).
Remove the secondary chain from the VVT unit and the
sprocket.
Page 801 of 2490

Installation
20. Clean and inspect all relevant components.
1. Push the tensioner piston (secon dary chain) into the body to
provide clearance for fitting.
1. Insert a thin rigid wire th rough the hole in the end of
the tensioner piston to displace the ball from the non-
return valve seat.
2. With the wire in position, press the piston fully into the tensioner body.
Remove the wire.
2. Fit the VVT unit to the engine.
Assemble the VVT unit, the exhaust camshaft sprocket
and the secondary chain, in pr eparation for fitting to the
engine.
1. Fit the above assembly to the camshafts with the chain correctly positioned over the tensioner; VVT
unit to the inlet and the sprocket to the exhaust.
2. Fit, but do not tighten, each bolt which secures the VVT unit and the exhaust sprocket to the camshafts.
Allow the VVT unit sufficien t space to fit the primary
chain, in a la ter operation.
3. Fit the chain tensioning tool 303 - 532 to the exhaust camshaft
sprocket.
Reposition the sprocket (and the VVT unit) for the most
advantageous position for use of the tool.
Remove the tool.
4. Refit the primary timing chain.
1. Lift the primary chain an d position it over the VVT
unit sprocket (the VVT unit mu st be pulled forward to
clear the cylinder head casting). There must be no
slack on the drive side of the primary chain and the
VVT unit must not be rotated on the camshaft.
2. Slide the VVT unit fully on to the camshaft.
5. Fit the primary chain tensioner blade.
1. Position the tensioner blade to the cylinder block.
Page 806 of 2490

Installation
15. Remove the primary ch ain tensioner blade.
1. Remove the pivot bolt which secures the tensioner blade.
2. Remove the tensioner blade.
16. Disconnect the primary chain from the VVT unit and the
crankshaft sprocket, and remove it completely.
17. Do not tamper with the three bolts which secure the VVT
mechanism to the sprockets. It is sealed at the factory to the
correct valve timing specificatio n for the engine and is supplied
only as a complete unit.
18. Remove the VVT unit.
1. Remove the securing bolt from both the VVT unit and
the exhaust cam sprocket.
2. Remove the VVT unit, exhaust sprocket and secondary chain as an asse mbly (release the chain
from the tensioner which is still secured to the
cylinder head).
Remove the secondary chain from the VVT unit and the
sprocket.
19. Clean and inspect all relevant components.
1. Push the tensioner piston (secon dary chain) into the body to
provide clearance for fitting.
1. Insert a thin rigid wire th rough the hole in the end of
the tensioner piston to displace the ball from the non-
return valve seat.
2. With the wire in position, press the piston fully into the tensioner body.
Remove the wire.
2. Fit the VVT unit to the engine.
Assemble the VVT unit, the exhaust camshaft sprocket
and the secondary chain, in pr eparation for fitting to the
engine.
1. Fit the above assembly to the camshafts with the chain correctly positioned over the tensioner; VVT
unit to the inlet and the sprocket to the exhaust.
2. Fit, but do not tighten, each bolt which secures the VVT unit and the exhaust sprocket to the camshafts.