
(43) Remove the park pawl rod and e-clip (Fig. 31).
(44) Remove the park pawl rod guide snap-ring
(Fig. 31).
(45) Remove the park pawl rod guide (Fig. 31).
(46) Remove the park pawl pivot shaft, park pawl,
and spring (Fig. 31).
(47) Remove the manual selector shaft (Fig. 31).
(48) Remove the manual selector shaft seal.
(49) Remove the dipstick tube seal.
CLEANING
The use of crocus cloth is permissible where neces-
sary, providing it is used carefully. When used on shafts,
or valves, use extreme care to avoid rounding off sharp
edges. Sharp edges are vital as they prevent foreign
matter from getting between the valve and valve bore.
Do not reuse oil seals, gaskets, seal rings, or O-rings
during overhaul. Replace these parts as a matter of
course. Also do not reuse snap rings or E-clips that are
bent or distorted. Replace these parts as well.
Lubricate transmission parts with MopartATF +4,
Automatic Transmission Fluid, during overhaul and
assembly. Use petroleum jelly, MopartDoor Ease, or
Ru-Glyde to prelubricate seals, O-rings, and thrust
washers. Petroleum jelly can also be used to hold
parts in place during reassembly.Clean the case in a solvent tank. Flush the case
bores and fluid passages thoroughly with solvent.
Dry the case and all fluid passages with compressed
air. Be sure all solvent is removed from the case and
that all fluid passages are clear.
NOTE: Do not use shop towels or rags to dry the
case (or any other transmission component) unless
they are made from lint-free materials. Lint will stick
to case surfaces and transmission components and
circulate throughout the transmission after assem-
bly. A sufficient quantity of lint can block fluid pas-
sages and interfere with valve body operation.
INSPECTION
Inspect the case for cracks, porous spots, worn
bores, or damaged threads. Damaged threads can be
repaired with Helicoil thread inserts. However, the
case will have to be replaced if it exhibits any type of
damage or wear.
ASSEMBLY
(1) Clean and inspect all components. Replace any
components which show evidence of excessive wear
or scoring.
(2) Install the cooler filter bypass valve.
(3) Torque the bypass valve to specification. The
valve uses a tapered pipe thread and excessive
torque can damage the transmission case. Tighten
the cooler filter bypass valve to 4.5 N´m (40 in.lbs.).
(4) Install a new selector shaft seal using Seal
Installer 8253 (Fig. 32).
Fig. 31 Manual Shaft/Park Lock Components
1 - GUIDE
2 - SNAP-RING
3 - SHAFT
4 - SPRING
5 - PARK PAWL
6 - MANUAL SHAFT/LEVER
7 - PARK ROD
Fig. 32 Install Selector Shaft
1 - SEAL
2 - TOOL 8253
21 - 326 AUTOMATIC TRANSMISSION - 45RFE/545RFEDR
AUTOMATIC TRANSMISSION - 45RFE/545RFE (Continued)

o-ring is properly installed and is free of any debris.
The hub must be smooth to avoid damaging pump
seal at installation.
(2) If a replacement transmission is being
installed, transfer any components necessary, such as
the manual shift lever and shift cable bracket, from
the original transmission onto the replacement trans-
mission.
(3) Lubricate oil pump seal lip with transmission
fluid.
(4) Align converter and oil pump.(5) Carefully insert converter in oil pump. Then
rotate converter back and forth until fully seated in
pump gears.
(6) Check converter seating with steel scale and
straightedge (Fig. 53). Surface of converter lugs
should be at least 13mm (1/2 in.) to rear of straight-
edge when converter is fully seated.
(7) Temporarily secure converter with C-clamp.
(8) Position transmission on jack and secure it
with chains.
(9) Check condition of converter driveplate.
Replace the plate if cracked, distorted or damaged.
Also be sure transmission dowel pins are seated
in engine block and protrude far enough to
hold transmission in alignment.
(10) Apply a light coating of MopartHigh Temp
Grease to the torque converter hub pocket in the rear
pocket of the engine's crankshaft.
(11) Raise transmission (Fig. 54) and align the
torque converter with the drive plate and transmis-
sion converter housing with the engine block.
(12) Move transmission forward. Then raise, lower
or tilt transmission to align the converter housing
with engine block dowels.
(13) Carefully work transmission forward and over
engine block dowels until converter hub is seated in
crankshaft. Verify that no wires, or the transmission
vent hose, have become trapped between the engine
block and the transmission.
(14) Install two bolts to attach the transmission to
the engine.
(15) Install remaining torque converter housing to
engine bolts. Tighten to 68 N´m (50 ft.lbs.).
Fig. 51 Install Primary Oil and Cooler Filters
1 - PRIMARY OIL FILTER
2 - COOLER RETURN FILTER
3 - COOLER RETURN FILTER BYPASS VALVE
4 - VALVE BODY
Fig. 52 Install Input, Output, and Line Pressure
Sensors
1 - OUTPUT SPEED SENSOR
2 - LINE PRESSURE SENSOR
3 - INPUT SPEED SENSOR
Fig. 53 Checking Torque Converter Seating - Typical
1 - SCALE
2 - STRAIGHTEDGE
21 - 334 AUTOMATIC TRANSMISSION - 45RFE/545RFEDR
AUTOMATIC TRANSMISSION - 45RFE/545RFE (Continued)

SPECIFICATIONS
TRANSMISSION
GENERAL
Component Metric Inch
Output Shaft End Play 0.22-0.55
mm0.009-0.021
in.
Input Shaft End Play 0.46-0.89
mm0.018-0.035
in.
2C Clutch Pack
Clearance0.455-1.335
mm0.018-0.053
in.
4C Clutch Pack
Clearance0.770-1.390
mm0.030-0.055
in.
L/R Clutch Pack
Clearance1.00-1.74
mm0.039-0.069
in.
OD Clutch Pack
Clearance1.103-1.856
mm0.043-0.073
in.
Component Metric Inch
UD Clutch Pack
Clearance0.84-1.54
mm0.033-0.061
in.
Reverse Clutch Pack
Clearance0.81-1.24
mm0.032-0.049
in.
Recommended fluid MoparTAT F + 4
GEAR RATIOS
1ST 3.00:1
2ND 1.67:1
2ND Prime 1.50:1
3RD 1.0:1
4TH 0.75:1
5TH 0.67:1
REVERSE 3.00:1
TORQUE SPECIFICATIONS
DESCRIPTION N´m Ft. Lbs. In. Lbs.
Fitting, cooler line at trans 17.5 - 155
Bolt, torque convertor 31 23 -
Bolt/nut, crossmember 68 50 -
Bolt, driveplate to crankshaft 75 55 -
Bolt, oil pan 11.8 - 105
Screw, primary fluid filter 4.5 - 40
Bolt, oil pump 28.2 - 250
Bolt, oil pump body to cover 4.5 - 40
Screw, plate to oil pump body 4.5 - 40
Bolt, valve body to case 11.8 - 105
Plug, pressure test port 5.1 - 45
Bolt, reaction shaft support 11.8 - 105
Screw, valve body to transfer plate 5.6 - 50
Screw, solenoid module to transfer plate 5.7 - 50
Screw, accumulator cover 8 - 70
Screw, detent spring 4.5 - 40
Bolt, input speed sensor 11.8 - 105
Bolt, output speed sensor 11.8 - 105
Bolt, line pressure sensor 11.8 - 105
Bolt, extension housing 54 40 -
Valve, cooler return filter bypass 4.5 - 40
Screw, manual valve cam retaining 4.5 - 40
Bolt, manual lever 28.2 - 250
21 - 358 AUTOMATIC TRANSMISSION - 45RFE/545RFEDR
AUTOMATIC TRANSMISSION - 45RFE/545RFE (Continued)

(11) Remove and discard the oil filter seal from the
bottom of the oil pump.
(12) If replacing the cooler return filter, use Oil
Filter Wrench 8321 to remove the filter from the
transmission.
(13) Dispose of used trans fluid and filter(s) prop-
erly.
INSPECTION
Inspect bottom of pan and magnet for excessive
amounts of metal. A light coating of clutch material
on the bottom of the pan does not indicate a problem
unless accompanied by a slipping condition or shift
lag. If fluid and pan are contaminated with excessive
amounts of debris, refer to the diagnosis section of
this group.
CLEANING
(1) Using a suitable solvent, clean pan and mag-
net.
(2) Using a suitable gasket scraper, clean original
sealing material from surface of transmission case
and the transmission pan.
INSTALLATION
CAUTION: The primary oil filter seal MUST be fully
installed flush against the oil pump body. DO NOT
install the seal onto the filter neck and attempt to
install the filter and seal as an assembly. Damage to
the transmission will result.
(1) Install a new primary oil filter seal in the oil
pump inlet bore. Seat the seal in the bore with the
butt end of a hammer, or other suitable tool.(2) Place replacement filter in position on valve
body and into the oil pump.
(3) Install screw to hold filter to valve body (Fig.
67). Tighten screw to 4.5 N´m (40 in. lbs.) torque.
(4) Install new cooler return filter onto the trans-
mission, if necessary. Torque the filter to 14.12 N´m
(125 in.lbs.).
(5) Place bead of MopartRTV sealant onto the
transmission case sealing surface.
(6) Place pan in position on transmission.
(7) Install bolts to hold pan to transmission.
Tighten bolts to 11.8 N´m (105 in. lbs.) torque.
(8) Lower vehicle and fill transmission with
MopartATF +4.
STANDARD PROCEDURE - TRANSMISSION
FILL
To avoid overfilling transmission after a fluid
change or overhaul, perform the following procedure:
(1) Remove dipstick and insert clean funnel in
transmission fill tube.
(2) Add following initial quantity of MopartAT F
+4 to transmission:
(a) If only fluid and filter were changed, add10
pints (5 quarts)of ATF +4 to transmission.
(b) If transmission was completely overhauled
and the torque converter was replaced or drained,
add24 pints (12 quarts)of ATF +4 to transmis-
sion.
(3) Check the transmission fluid (Refer to 21 -
TRANSMISSION/AUTOMATIC - RFE/FLUID -
STANDARD PROCEDURE) and adjust as required.
GEARSHIFT CABLE
DIAGNOSIS AND TESTING - GEARSHIFT
CABLE
(1) Engine starts must be possible with shift lever
in PARK or NEUTRAL positions only. Engine starts
must not be possible in any other gear position.
(2) With the shift lever in the:
(a) PARK position - Apply upward force on the
shift arm and remove pressure. Engine starts must
be possible.
(b) PARK position - Apply downward force on
the shift arm and remove pressure. Engine starts
must be possible.
(c) NEUTRAL position - Normal position. Engine
starts must be possible.
(d) NEUTRAL position - Engine running and
brakes applied, apply upward force on the shift
arm. Transmission shall not be able to shift from
neutral to reverse.
Fig. 67 Transmission Filters - 4X4 Shown
1 - PRIMARY OIL FILTER
2 - COOLER RETURN FILTER
3 - COOLER RETURN FILTER BYPASS VALVE
4 - VALVE BODY
21 - 368 AUTOMATIC TRANSMISSION - 45RFE/545RFEDR
FLUID AND FILTER (Continued)

LOW/REVERSE SWITCH VALVE
The low/reverse switch valve allows the low/reverse
clutch to be operated by either the LR/CC solenoid or
the MS solenoid.
REMOVAL
The valve body can be removed for service without
having to remove the transmission assembly.
The valve body can be disassembled for cleaning
and inspection of the individual components. (Refer
to 21 - TRANSMISSION/AUTOMATIC - 45RFE/
VALVE BODY - DISASSEMBLY)
(1) Shift transmission into PARK.
(2) Raise vehicle.
(3) Disconnect wires at the solenoid and pressure
switch assembly connector.
(4) Position drain pan under transmission oil pan.
(5) Remove transmission oil pan.
(6) Remove the primary oil filter from valve body.
(Fig. 132)
(7) Remove bolts attaching valve body to transmis-
sion case (Fig. 133).
(8) Lower the valve body and work the electrical
connector out of transmission case.
(9) Separate the valve body from the transmission.
DISASSEMBLY
(1) Remove the screws holding the solenoid and
pressure switch assembly to the valve body (Fig.
134). Do not remove the screws on the top of the sole-
noid and pressure switch assembly.
(2) Separate the solenoid and pressure switch
assembly from the valve body.
Fig. 132 Remove Primary Oil Filter
1 - PRIMARY OIL FILTER
2 - COOLER RETURN FILTER
3 - COOLER RETURN FILTER BYPASS VALVE
4 - VALVE BODY
Fig. 133 Valve Body Bolts
1 - VALVE BODY TO CASE BOLT (6)
Fig. 134 Solenoid and Pressure Switch Assembly
Screws
1 - SOLENOID PACK BOLTS (15)
21 - 410 AUTOMATIC TRANSMISSION - 45RFE/545RFEDR
VALVE BODY (Continued)

NOTE: The single zone heating and air conditioning
system is equipped with a single blend door actua-
tor. The dual zone system has two blend door
actuators, one for the driver side blend air door and
one for the passenger side blend air door. The
same service procedures can be used for each of
these actuators.
(1) Disconnect and isolate the battery negative
cable.
(2) Remove the instrument panel from the vehicle
(Refer to 23 - BODY/INSTRUMENT PANEL/IN-
STRUMENT PANEL ASSEMBLY - REMOVAL).
(3) Disconnect the wire harness connector from the
blend door actuator(s) (Fig. 16).
(4) Remove the screws that secure the blend door
actuator(s) to the HVAC housing.
(5) Remove the blend door actuator(s) from the
HVAC housing.INSTALLATION
(1) Position the blend door actuator(s) into the
HVAC housing. If necessary, rotate the actuator(s)
slightly to align the splines on the actuator output
sleeve(s) with those on the blend door linkage.
(2) Install and tighten the screws that secure the
blend door actuator(s) to the HVAC housing. Tighten
the screws to 2 N´m (17 in. lbs.).
(3) Connect the HVAC wire harness connector to
the blend door actuator(s).
(4) Install the instrument panel (Refer to 23 -
BODY/INSTRUMENT PANEL/INSTRUMENT
PANEL ASSEMBLY - INSTALLATION).
(5) Reconnect the battery negative cable.
BLOWER MOTOR RESISTOR
BLOCK
DESCRIPTION
The blower motor resistor is mounted to the bot-
tom side of the HVAC housing near the blower motor.
It can be accessed for service from underneath the
instrument panel.
OPERATION
The resistor has multiple resistor wires, each of
which will reduce the current flow to the blower
motor to change the blower motor speed by changing
the resistance in the blower motor ground path. The
blower motor switch directs the ground path through
the correct resistor wire to obtain the selected speed.
With the blower motor switch in the lowest speed
position, the ground path for the motor is applied
through all of the resistor wires. Each higher speed
selected with the blower motor switch applies the
blower motor ground path through fewer of the resis-
tor wires, increasing the blower motor speed. When
the blower motor switch is in the highest speed posi-
tion, the blower motor resistor is bypassed and the
blower motor receives a direct path to ground.
The blower motor resistor cannot be repaired and,
if faulty or damaged, it must be replaced.
Fig. 16 HVAC Housing - Dual Zone Shown, Single
Zone Typical
1 - NUT
2 - PASSENGER BLEND DOOR ACTUATOR
3 - NUT
4 - INLET BAFFLE
5 - RECIRCULATION DOOR ACTUATOR
6 - RECIRCULATION DOOR
7 - DRIVER SIDE BLEND DOOR ACTUATOR
8 - HVAC HOUSING
9 - BOLT
10 - DEFROSTER DOOR ACTUATOR
11 - MODE DOOR ACTUATOR
24 - 18 CONTROLSDR
BLEND DOOR ACTUATOR (Continued)

BURNT FLUID - DIAGNOSIS AND
TESTING, CAUSES OF..........21-201,21-366
BUSHING - INSTALLATION.............19-19
BUSHING - INSTALLATION, TORSION
BAR CROSS MEMBER..................2-15
BUSHING - REMOVAL.................19-19
BUSHING - REMOVAL, TORSION BAR
CROSSMEMBER......................2-13
BUSHING AND SEAL - INSTALLATION,
EXTENSION HOUSING................21-440
BUSHING AND SEAL - REMOVAL,
EXTENSION HOUSING................21-440
BUSHINGS - 2WD (LD) - INSTALLATION,
LOWER CONTROL ARM................2-15
BUSHINGS - 2WD (LD) - REMOVAL,
LOWER CONTROL ARM................2-13
BUSHINGS - 4WD (LD) - INSTALLATION,
LOWER CONTROL ARM................2-14
BUSHINGS - 4WD (LD) - REMOVAL,
LOWER CONTROL ARM................2-13
BUSHINGS - INSTALLATION.............2-43
BUSHINGS - REMOVAL.................2-43
BUZZ, SQUEAK & RATTLE - STANDARD
PROCEDURE........................23-11
BYPASS - DESCRIPTION, WATER PUMP . . . 7-59
BYPASS - OPERATION, WATER PUMP.....7-60
C205F - ADJUSTMENTS, FRONT AXLE.....3-32
C205F - DIAGNOSIS AND TESTING,
FRONT AXLE.........................3-27
C205F - INSTALLATION, FRONT AXLE.....3-31
C205F - REMOVAL, FRONT AXLE...........3-31
C205F - SPECIAL TOOLS, FRONT AXLE....3-40
C205F - SPECIFICATIONS, FRONT AXLE....3-39
CAB - INSTALLATION, QUAD......8O-36,8O-61
CAB - INSTALLATION, STANDARD . . 8O-35,8O-61
CAB - REMOVAL, QUAD..........8O-33,8O-60
CAB - REMOVAL, STANDARD......8O-32,8O-59
CAB BACK PANEL TRIM -
INSTALLATION, REAR.................23-69
CAB BACK PANEL TRIM - REMOVAL,
REAR..............................23-68
CAB CLEARANCE LAMP - INSTALLATION . . 8L-12
CAB CLEARANCE LAMP - REMOVAL.....8L-11
CABLE - ADJUSTMENTS, THROTTLE
VALVE ............................21-254
CABLE - DESCRIPTION.................8P-4
CABLE - DESCRIPTION, ANTENNA BODY . . . 8A-4
CABLE - DESCRIPTION, SPARK PLUG.....8I-21
CABLE - DESCRIPTION, THROTTLE
VALVE ............................21-253
CABLE - DIAGNOSIS AND TESTING,
ANTENNA BODY......................8A-4
CABLE - DIAGNOSIS AND TESTING,
GEARSHIFT..................21-210,21-368
CABLE - INSTALLATION................8P-5
CABLE - INSTALLATION, ANTENNA BODY . . 8A-6
CABLE - INSTALLATION, CHECK.........23-15
CABLE - INSTALLATION, FRONT
PARKING BRAKE......................5-38
CABLE - INSTALLATION, GEARSHIFT....21-211,
21-370
CABLE - INSTALLATION, INSTRUMENT
PANEL ANTENNA......................8A-7
CABLE - INSTALLATION, LEFT REAR......5-39
CABLE - INSTALLATION, REAR PARK
BRAKE..............................5-38
CABLE - INSTALLATION, RIGHT REAR.....5-38
CABLE - INSTALLATION, SPARK PLUG....8I-22
CABLE - INSTALLATION, THROTTLE
CONTROL.....................14-40,14-84
CABLE - OPERATION...................8P-4
CABLE - OPERATION, ANTENNA BODY
.....8A-4
CABLE - OPERATION, SPARK PLUG
.......8I-21
CABLE - REMOVAL
....................8P-4
CABLE - REMOVAL, ANTENNA BODY
......8A-6
CABLE - REMOVAL, CHECK
.............23-15
CABLE - REMOVAL, FRONT PARKING
BRAKE
..............................5-36
CABLE - REMOVAL, GEARSHIFT
. . 21-210,21-369
CABLE - REMOVAL, INSTRUMENT PANEL
ANTENNA
...........................8A-7
CABLE - REMOVAL, LEFT REAR
..........5-38
CABLE - REMOVAL, REAR PARK BRAKE
. . . 5-37
CABLE - REMOVAL, RIGHT REAR
.........5-37
CABLE - REMOVAL, SPARK PLUG
........8I-22
CABLE - REMOVAL, THROTTLE
CONTROL
.....................14-38,14-83CABLE, ADJUSTMENTS - GEARSHIFT . . . 21-212,
21-370
CABLE RESISTANCE, SPECIFICATIONS -
SPARK PLUG.........................8I-4
CABLE ROUTING, 5.7L V-8 ENGINE -
FIRING ORDER........................8I-4
CABLE/HANDLE ASSEMBLY -
INSTALLATION, LATCH RELEASE........23-47
CABLE/HANDLE ASSEMBLY - REMOVAL,
LATCH RELEASE.....................23-47
CABLES - DESCRIPTION, BATTERY.......8F-14
CABLES - DIAGNOSIS AND TESTING,
BATTERY...........................8F-15
CABLES - INSTALLATION, BATTERY......8F-17
CABLES - OPERATION, BATTERY........8F-15
CABLES - REMOVAL, BATTERY..........8F-16
CALIBRATION - STANDARD PROCEDURE,
COMPASS...........................8M-3
CALIPER ADAPTER MOUNT -
INSTALLATION, DISC BRAKE............5-22
CALIPERS - DESCRIPTION, DISC BRAKE . . . 5-16
CALIPERS - OPERATION, DISC BRAKE.....5-16
CAM BORE REPAIR - STANDARD
PROCEDURE........................9-267
CAMBER AND CASTER ADJUSTMENT -
STANDARD PROCEDURE.................2-4
CAMBER, CASTER AND TOE
ADJUSTMENT - STANDARD
PROCEDURE..........................2-4
CAM/OVERDRIVE PISTON RETAINER -
ASSEMBLY, OVERRUNNING CLUTCH....21-237
CAM/OVERDRIVE PISTON RETAINER -
CLEANING, OVERRUNNING CLUTCH.....21-236
CAM/OVERDRIVE PISTON RETAINER -
DESCRIPTION, OVERRUNNING CLUTCH . . 21-236
CAM/OVERDRIVE PISTON RETAINER -
DISASSEMBLY, OVERRUNNING
CLUTCH...........................21-236
CAM/OVERDRIVE PISTON RETAINER -
INSPECTION, OVERRUNNING CLUTCH . . . 21-237
CAM/OVERDRIVE PISTON RETAINER -
OPERATION, OVERRUNNING CLUTCH....21-236
CAMSHAFT - INSTALLATION.......9-206,9-271
CAMSHAFT - REMOVAL..........9-205,9-268
CAMSHAFT BEARINGS - INSTALLATION . . . 9-271
CAMSHAFT BEARINGS - REMOVAL......9-268
CAMSHAFT CORE HOLE PLUG -
INSTALLATION.......................9-206
CAMSHAFT CORE HOLE PLUG -
REMOVAL..........................9-205
CAMSHAFT POSITION SENSOR -
DESCRIPTION.......................14-71
CAMSHAFT POSITION SENSOR -
DESCRIPTION.........................8I-7
CAMSHAFT POSITION SENSOR -
INSTALLATION.......................14-72
CAMSHAFT POSITION SENSOR -
INSTALLATION.......................8I-10
CAMSHAFT POSITION SENSOR -
OPERATION.........................14-71
CAMSHAFT POSITION SENSOR -
OPERATION..........................8I-7
CAMSHAFT POSITION SENSOR -
REMOVAL..........................14-72
CAMSHAFT POSITION SENSOR -
REMOVAL............................8I-9
CAMSHAFT(S) - DESCRIPTION.......9-25,9-35
CAMSHAFT(S) - INSTALLATION......9-27,9-36
CAMSHAFT(S) - LEFT - DESCRIPTION....9-114
CAMSHAFT(S) - LEFT - INSTALLATION....9-116
CAMSHAFT(S) - LEFT - REMOVAL.......9-115
CAMSHAFT(S) - REMOVAL..........9-25,9-35
CAMSHAFT(S) - RIGHT - DESCRIPTION . . . 9-119
CAMSHAFT(S) - RIGHT - INSTALLATION . . 9-120
CAMSHAFT(S) - RIGHT - REMOVAL......9-119
CANISTER - DESCRIPTION, VAPOR......25-22
CANISTER - INSTALLATION, VAPOR......25-22
CANISTER - OPERATION, VAPOR........25-22
CANISTER - REMOVAL, VAPOR..........25-22
CAP - DESCRIPTION, FUEL FILLER.......25-13
CAP - DESCRIPTION, RADIATOR
PRESSURE
..........................7-57
CAP - DIAGNOSIS AND TESTING,
RADIATOR
...........................7-58
CAP - OPERATION, FUEL FILLER
........25-13
CAP - OPERATION, RADIATOR
PRESSURE
..........................7-58
CAPACITIES, SPECIFICATIONS - FLUID
......0-5CAPACITOR - DESCRIPTION, IGNITION
COIL...............................8I-21
CAPACITOR - INSTALLATION, IGNITION
COIL...............................8I-21
CAPACITOR - OPERATION, IGNITION
COIL...............................8I-21
CAPACITOR - REMOVAL, IGNITION COIL . . . 8I-21
CAP-TO-FILLER NECK SEAL -
DIAGNOSIS AND TESTING, RADIATOR.....7-58
CARDAN UNIVERSAL JOINTS -
ASSEMBLY, DOUBLE...................3-17
CARDAN UNIVERSAL JOINTS -
DISASSEMBLY, DOUBLE................3-16
CARGO BOX - INSTALLATION...........23-37
CARGO BOX - INSTALLATION, WITH.....8L-22,
8L-23,8L-24,8L-7,8L-9
CARGO BOX - INSTALLATION, WITHOUT . . 8L-22,
8L-23,8L-24,8L-8,8L-9
CARGO BOX - REMOVAL...............23-37
CARGO BOX - REMOVAL, WITH....8L-22,8L-24,
8L-7,8L-9
CARGO BOX - REMOVAL, WITHOUT.....8L-22,
8L-23,8L-24,8L-7,8L-9
CARGO BOX - TIE DOWN -
INSTALLATION.......................23-38
CARGO BOX - TIE DOWN - REMOVAL....23-38
CARGO LAMP INDICATOR -
DESCRIPTION.......................8J-20
CARGO LAMP INDICATOR - OPERATION . . 8J-20
CARPETS AND FLOOR MATS -
INSTALLATION.......................23-65
CARPETS AND FLOOR MATS - REMOVAL . . . 23-65
CASCADE OVERFLOW VALVE -
DESCRIPTION.......................14-66
CASCADE OVERFLOW VALVE -
OPERATION.........................14-66
CASE - DESCRIPTION, TRANSFER.........0-4
CASE - NV241 GENII - ASSEMBLY,
TRANSFER.........................21-428
CASE - NV241 GENII - CLEANING,
TRANSFER.........................21-426
CASE - NV241 GENII - DESCRIPTION,
TRANSFER.........................21-415
CASE - NV241 GENII - DIAGNOSIS AND
TESTING, TRANSFER.................21-416
CASE - NV241 GENII - DISASSEMBLY,
TRANSFER.........................21-417
CASE - NV241 GENII - INSPECTION,
TRANSFER.........................21-426
CASE - NV241 GENII - INSTALLATION,
TRANSFER.........................21-438
CASE - NV241 GENII - OPERATION,
TRANSFER.........................21-415
CASE - NV241 GENII - REMOVAL,
TRANSFER.........................21-417
CASE - NV243 - ASSEMBLY, TRANSFER . . 21-496
CASE - NV243 - CLEANING, TRANSFER . . 21-493
CASE - NV243 - DESCRIPTION,
TRANSFER.........................21-482
CASE - NV243 - DIAGNOSIS AND
TESTING, TRANSFER.................21-483
CASE - NV243 - DISASSEMBLY,
TRANSFER.........................21-484
CASE - NV243 - INSPECTION, TRANSFER . 21-493
CASE - NV243 - INSTALLATION,
TRANSFER.........................21-505
CASE - NV243 - OPERATION, TRANSFER . 21-483
CASE - NV243 - REMOVAL, TRANSFER . . 21-484
CASE - NV244 - DIAGNOSIS AND
TESTING, TRANSFER.................21-513
CASE - NV244 GENII - ASSEMBLY,
TRANSFER.........................21-525
CASE - NV244 GENII - CLEANING,
TRANSFER.........................21-523
CASE - NV244 GENII - DESCRIPTION,
TRANSFER.........................21-512
CASE - NV244 GENII - DISASSEMBLY,
TRANSFER.........................21-514
CASE - NV244 GENII - INSPECTION,
TRANSFER.........................21-523
CASE - NV244 GENII - INSTALLATION,
TRANSFER
.........................21-534
CASE - NV244 GENII - OPERATION,
TRANSFER
.........................21-513
CASE - NV244 GENII - REMOVAL,
TRANSFER
.........................21-514
CASE - NV271 - ASSEMBLY, TRANSFER
. . 21-461
CASE - NV271 - CLEANING, TRANSFER
. . 21-459
DRINDEX 5
Description Group-Page Description Group-Page Description Group-Page

PRESSURE HOSE - REMOVAL.....19-44,19-45
PRESSURE LEAKAGE - DIAGNOSIS AND
TESTING, CYLINDER COMBUSTION . . . 9-186,9-8,
9-93
PRESSURE LIMITING VALVE -
DESCRIPTION, FUEL..................14-61
PRESSURE LIMITING VALVE -
INSTALLATION, FUEL.................14-61
PRESSURE LIMITING VALVE -
OPERATION, FUEL....................14-61
PRESSURE LIMITING VALVE - REMOVAL,
FUEL..............................14-61
PRESSURE (LP) SENSOR -
DESCRIPTION, LINE.................21-382
PRESSURE (LP) SENSOR -
INSTALLATION, LINE.................21-383
PRESSURE (LP) SENSOR - OPERATION,
LINE..............................21-383
PRESSURE (LP) SENSOR - REMOVAL,
LINE..............................21-383
PRESSURE RELEASE - STANDARD
PROCEDURE, FUEL SYSTEM.............14-2
PRESSURE RELIEF VALVE - CLEANING,
OIL................................9-294
PRESSURE RELIEF VALVE -
DESCRIPTION, HIGH..................24-48
PRESSURE RELIEF VALVE - INSPECTION,
OIL................................9-294
PRESSURE RELIEF VALVE -
INSTALLATION, OIL...................9-294
PRESSURE RELIEF VALVE - OPERATION,
HIGH..............................24-48
PRESSURE RELIEF VALVE - REMOVAL,
OIL.................................9-294
PRESSURE SENSOR - DESCRIPTION,
FUEL..............................14-60
PRESSURE SENSOR - INSTALLATION,
FUEL..............................14-61
PRESSURE SENSOR - OPERATION, FUEL . . 14-60
PRESSURE SENSOR - REMOVAL, FUEL . . . 14-60
PRESSURE SENSOR/SWITCH -
DESCRIPTION, OIL....................9-67
PRESSURE SENSOR/SWITCH -
INSTALLATION, OIL....................9-67
PRESSURE SENSOR/SWITCH -
OPERATION, OIL......................9-67
PRESSURE SENSOR/SWITCH -
REMOVAL, OIL.......................9-67
PRESSURE, SPECIFICATIONS - FUEL
SYSTEM............................14-3
PRESSURE SWITCH - DESCRIPTION,
POWER STEERING...................19-46
PRESSURE SWITCH - INSTALLATION,
OIL................................9-294
PRESSURE SWITCH - OPERATION,
POWER STEERING...................19-46
PRESSURE SWITCH - REMOVAL, OIL.....9-294
PRESSURE TEST - DIAGNOSIS AND
TESTING, HYDRAULIC..........21-141,21-316
PRESSURE TRANSDUCER -
DESCRIPTION, A/C
...................24-15
PRESSURE TRANSDUCER - DIAGNOSIS
AND TESTING, A/C
...................24-16
PRESSURE TRANSDUCER -
INSTALLATION, A/C
...................24-16
PRESSURE TRANSDUCER - OPERATION,
A/C
................................24-16
PRESSURE TRANSDUCER - REMOVAL,
A/C
................................24-16
PRESSURES - DESCRIPTION, TIRE
INFLATION
...........................22-7
PRIMING - STANDARD PROCEDURE,
FUEL SYSTEM
.......................14-47
PROCESS - SPECIFICATIONS, WELD
.....13-15
PROGRAMING - STANDARD
PROCEDURE, RKE TRANSMITTER
........8N-9
PROGRAMMING - STANDARD
PROCEDURE, ELECTRONIC VEHICLE
INFORMATION CENTER
................8M-8
PROGRAMMING - STANDARD
PROCEDURE, ENHANCED SEATBELT
REMINDER
..........................8J-35
PROGRAMMING - STANDARD
PROCEDURE, PCM/SKIM
...............8E-14
PROGRAMMING, STANDARD
PROCEDURE - SENTRY KEY
IMMOBILIZER SYSTEM TRANSPONDER
....8Q-4PROPELLER SHAFT - DIAGNOSIS AND
TESTING.............................3-1
PROPELLER SHAFT - HD FRONT -
INSTALLATION.........................3-7
PROPELLER SHAFT - HD FRONT -
REMOVAL............................3-7
PROPELLER SHAFT - INSTALLATION,
REAR................................3-8
PROPELLER SHAFT - REMOVAL, REAR.....3-8
PROPELLER SHAFT - SPECIAL TOOLS......3-6
PROPELLER SHAFT - SPECIFICATIONS......3-6
PROPELLER SHAFT - STANDARD
PROCEDURE..........................3-3
PROPELLER SHAFT- LD FRONT -
INSTALLATION.........................3-7
PROPELLER SHAFT- LD FRONT -
REMOVAL............................3-6
PROPORTIONING - DESCRIPTION,
ELECTRONIC VARIABLE BRAKE..........5-49
PROPORTIONING - OPERATION,
ELECTRONIC VARIABLE BRAKE..........5-49
PTO SWITCH - DESCRIPTION......14-36,14-85
PTO SWITCH - OPERATION........14-36,14-85
PULLEY - INSTALLATION..............19-47
PULLEY - REMOVAL..................19-47
PUMP - 5.7L - INSTALLATION, WATER.....7-63
PUMP - 5.7L - REMOVAL, WATER........7-63
PUMP - 5.9L DIESEL - CLEANING,
WATER .............................7-62
PUMP - 5.9L DIESEL - DESCRIPTION,
WATER...............................7-62
PUMP - 5.9L DIESEL - INSPECTION,
WATER .............................7-62
PUMP - 5.9L DIESEL - INSTALLATION,
WATER .............................7-62
PUMP - 5.9L DIESEL - OPERATION,
WATER .............................7-62
PUMP - 5.9L DIESEL - REMOVAL,
WATER .............................7-62
PUMP - 8.0L - CLEANING, WATER........7-66
PUMP - 8.0L - INSPECTION, WATER......7-66
PUMP - 8.0L - INSTALLATION, WATER.....7-66
PUMP - 8.0L - REMOVAL, WATER........7-64
PUMP - ASSEMBLY, OIL...........9-158,9-69
PUMP - ASSEMBLY, OIL........21-214,21-390
PUMP - CLEANING, OIL.....9-157,9-224,9-295
PUMP - CLEANING, OIL........21-214,21-390
PUMP - DESCRIPTION................19-39
PUMP - DESCRIPTION, FUEL...........14-11
PUMP - DESCRIPTION, FUEL INJECTION . . 14-53
PUMP - DESCRIPTION, FUEL TRANSFER . . 14-64
PUMP - DESCRIPTION, LEAK DETECTION . 25-13
PUMP - DESCRIPTION, OIL......21-213,21-386
PUMP - DESCRIPTION, WATER..........7-59
PUMP - DIAGNOSIS AND TESTING,
WATER .........................7-62,7-63
PUMP - DISASSEMBLY, OIL........9-157,9-68
PUMP - DISASSEMBLY, OIL.....21-214,21-388
PUMP - INITIAL OPERATION -
STANDARD PROCEDURE, POWER
STEERING..........................19-40
PUMP - INSPECTION, OIL . . . 9-157,9-224,9-295,
9-68
PUMP - INSPECTION, OIL.......21-214,21-390
PUMP - INSTALLATION, FUEL INJECTION . 14-55
PUMP - INSTALLATION, FUEL TRANSFER . 14-65
PUMP - INSTALLATION, LEAK
DETECTION.........................25-16
PUMP - INSTALLATION, OIL . 9-159,9-225,9-296,
9-69
PUMP - OPERATION..................19-40
PUMP - OPERATION, FUEL.............14-11
PUMP - OPERATION, FUEL INJECTION....14-53
PUMP - OPERATION, FUEL TRANSFER....14-64
PUMP - OPERATION, LEAK DETECTION . . . 25-14
PUMP - OPERATION, OIL.......21-213,21-386
PUMP - OPERATION, WATER............7-60
PUMP - REMOVAL, FUEL INJECTION.....14-54
PUMP - REMOVAL, FUEL TRANSFER.....14-64
PUMP - REMOVAL, LEAK DETECTION....25-16
PUMP - REMOVAL, OIL . 9-156,9-224,9-294,9-67
PUMP BYPASS - DESCRIPTION, WATER
. . . 7-59
PUMP BYPASS - OPERATION, WATER
.....7-60
PUMP FRONT SEAL - INSTALLATION,
OIL
...............................21-391
PUMP FRONT SEAL - REMOVAL, OIL
....21-391
PUMP LEAKAGE - DIAGNOSIS AND
TESTING
...........................19-40PUMP MODULE - DESCRIPTION, FUEL....14-11
PUMP MODULE - INSTALLATION, FUEL . . . 14-12
PUMP MODULE - OPERATION, FUEL.....14-11
PUMP MODULE - REMOVAL, FUEL.......14-12
PUMP RELAY - DESCRIPTION, FUEL.....14-27
PUMP RELAY - INSTALLATION, FUEL.....14-28
PUMP RELAY - OPERATION, FUEL.......14-27
PUMP RELAY - REMOVAL, FUEL........14-28
PUMP RELAYS - DIAGNOSIS AND
TESTING, ASD AND FUEL...............8I-5
PUMP TIMING - DIAGNOSIS AND
TESTING, FUEL INJECTION.............14-53
PUMP VOLUME CHECK - STANDARD
PROCEDURE, OIL...................21-387
PUMP/MOTOR - DESCRIPTION, WASHER . 8R-13
PUMP/MOTOR - INSTALLATION,
WASHER...........................8R-14
PUMP/MOTOR - OPERATION, WASHER . . . 8R-13
PUMP/MOTOR - REMOVAL, WASHER....8R-14
PUSHRODS - CLEANING...............9-252
PUSHRODS - INSPECTION.............9-253
QUAD CAB - INSTALLATION.......8O-36,8O-61
QUAD CAB - REMOVAL..........8O-33,8O-60
QUICK CONNECT FITTING -
DESCRIPTION........................14-8
QUICK LEARN - STANDARD
PROCEDURE, TCM...................8E-23
QUICK-CONNECT FITTINGS - STANDARD
PROCEDURE...........................14-8
RADIAL - PLY TIRES - DESCRIPTION......22-6
RADIATOR - 5.9L DIESEL - CLEANING.....7-56
RADIATOR - 5.9L DIESEL -
DESCRIPTION........................7-56
RADIATOR - 5.9L DIESEL - INSPECTION . . . 7-56
RADIATOR - 5.9L DIESEL -
INSTALLATION........................7-57
RADIATOR - 5.9L DIESEL - OPERATION....7-56
RADIATOR - 5.9L DIESEL - REMOVAL.....7-56
RADIATOR CAP - DIAGNOSIS AND
TESTING............................7-58
RADIATOR CAP-TO-FILLER NECK SEAL -
DIAGNOSIS AND TESTING..............7-58
RADIATOR COOLANT FLOW -
DIAGNOSIS AND TESTING..........7-54,7-56
RADIATOR CROSSMEMBER -
INSTALLATION, UPPER................23-42
RADIATOR CROSSMEMBER - REMOVAL,
UPPER.............................23-42
RADIATOR FAN - 5.9L DIESEL -
CLEANING...........................7-35
RADIATOR FAN - 5.9L DIESEL -
INSPECTION.........................7-35
RADIATOR FAN - 5.9L DIESEL -
INSTALLATION........................7-36
RADIATOR FAN - 5.9L DIESEL -
REMOVAL...........................7-35
RADIATOR FAN - GAS ENGINES -
CLEANING...........................7-34
RADIATOR FAN - GAS ENGINES -
INSPECTION.........................7-34
RADIATOR FAN - GAS ENGINES -
INSTALLATION........................7-34
RADIATOR FAN - GAS ENGINES -
REMOVAL...........................7-33
RADIATOR PRESSURE CAP -
DESCRIPTION........................7-57
RADIATOR PRESSURE CAP - OPERATION . . 7-58
RADIATOR-3.7L/4.7L/5.7L - CLEANING.....7-55
RADIATOR-3.7L/4.7L/5.7L -
DESCRIPTION........................7-54
RADIATOR-3.7L/4.7L/5.7L - INSPECTION . . . 7-55
RADIATOR-3.7L/4.7L/5.7L -
INSTALLATION........................7-55
RADIATOR-3.7L/4.7L/5.7L - OPERATION....7-54
RADIATOR-3.7L/4.7L/5.7L - REMOVAL.....7-54
RADIO - DESCRIPTION.................8A-8
RADIO - INSTALLATION................8A-8
RADIO - OPERATION...................8A-8
RADIO - REMOVAL....................8A-8
RADIO NOISE SUPPRESSION GROUND
STRAP - DESCRIPTION
.................8A-9
RADIO NOISE SUPPRESSION GROUND
STRAP - INSTALLATION
...............8A-10
RADIO NOISE SUPPRESSION GROUND
STRAP - OPERATION
..................8A-9
RADIO NOISE SUPPRESSION GROUND
STRAP - REMOVAL
....................8A-9
RAIL - DESCRIPTION, FUEL
............14-12
DRINDEX 25
Description Group-Page Description Group-Page Description Group-Page