1995 JEEP CHEROKEE battery location

[x] Cancel search: battery location

Page 1109 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (2) Install the upper inner retainer and bushing on
the top of the damper.
(3) Position the upper damper bracket over the
damper and install the stud nut and bolts.
(4) Tighten the stud nut to 23 Nzm

Page 1114 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (3) Connect the CCV hoses (Fig. 1).
(4) Connect negative cable to battery.
VALVE COMPONENT REPLACEÐCYLINDER HEAD
NOT REMOVED
ROCKER ARMS AND PUSH RODS
This procedure can be done with the engine in or

Page 1116 of 2198

JEEP CHEROKEE 1995  Service Repair Manual LEAK-DOWN TEST
After cleaning and inspection, test each tappet for
specified leak-down rate tolerance to ensure zero-lash
operation (Fig. 14).
Swing the weighted arm of the hydraulic valve tap-
pet te

Page 1147 of 2198

JEEP CHEROKEE 1995  Service Repair Manual The digits of the code identify:
(1) 1st DigitÐThe year (4 = 1994).
(2) 2nd & 3rd DigitsÐThe month (01 - 12).
(3) 4th & 5th DigitsÐThe engine type/fuel system/
compression ratio (MX = A 4.0 Liter (

Page 1150 of 2198

JEEP CHEROKEE 1995  Service Repair Manual INSTALLATIONÐYJ VEHICLES
(1)MANUAL TRANSMISSION:
(a) Position the torque arm bracket to the trans-
mission. Install the bolts and tighten to 54 Nzm (40
ft. lbs.) torque.
(b) Position the support cush

Page 1158 of 2198

JEEP CHEROKEE 1995  Service Repair Manual LEAK-DOWN TEST
After cleaning and inspection, test each tappet for
specified leak-down rate tolerance to ensure zero-lash
operation (Fig. 5).
Swing the weighted arm of the hydraulic valve tap-
pet tes

Page 1180 of 2198

JEEP CHEROKEE 1995  Service Repair Manual If the clearance exceeds specification using a pair
of 0.051 mm (0.002 inch) undersize bearing inserts,
measure crankshaft journal diameter with a mi-
crometer. If the journal diameter is correct, the

Page 1231 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (2) Raise skid plate/fuel tank until gauge sender
wire connector can be connected to harness connec-
tor.
(3) Finish raising skid plate/fuel tank assembly
into position. Tighten mounting nuts to 16 Nz