1995 JEEP CHEROKEE wiring

[x] Cancel search: wiring

Page 1255 of 2198

JEEP CHEROKEE 1995  Service Repair Manual plugged catalytic convertor.
(27) If equipped with automatic transmission, ver-
ify that electrical harness is firmly connected to park/
neutral safety switch. Refer to Automatic
Transmission section

Page 1256 of 2198

JEEP CHEROKEE 1995  Service Repair Manual PCM SYSTEM SCHEMATICS
Powertrain control system schematics for the 2.5L
4-cylinder and 4.0L 6-cylinder engines are shown in
figures 29, 30, 31 and 32.
These schematics are displayed as a quick refer-

Page 1262 of 2198

JEEP CHEROKEE 1995  Service Repair Manual Test the resistance of the wire harness. Do this be-
tween the powertrain control module (PCM) wire
harness connector terminal-2 and the sensor connec-
tor terminal. Also test terminal-4 to the sensor

Page 1263 of 2198

JEEP CHEROKEE 1995  Service Repair Manual EXTENDED IDLE SWITCH TEST
OPTIONAL POLICE PACKAGE ONLY
OPERATION
The extended idle switch is used to raise the en-
gine idle speed to approximately 1000 rpm when the
shifter is in either the Park or N

Page 1266 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (8) Disconnect jumper wires from relay and 12 Volt
power source.
If continuity or resistance tests did not pass, re-
place relay. If tests passed, refer to Group 8W, Wiring
Diagrams for additional cir

Page 1347 of 2198

JEEP CHEROKEE 1995  Service Repair Manual GENERAL INFORMATION
The airbag system is a standard equipment safety
device on XJ (Cherokee) models. It is designed to pro-
tect the driver from serious injury, caused by a fron-
tal impact of the veh

Page 1350 of 2198

JEEP CHEROKEE 1995  Service Repair Manual CLOCKSPRING
WARNING: BEFORE SERVICING AIR BAG SYSTEM,
REMOVE AND ISOLATE BATTERY NEGATIVE (-) CA-
BLE (GROUND) FROM VEHICLE BATTERY. WHEN
AN UNDEPLOYED AIR BAG ASSEMBLY IS TO BE
REMOVED FROM THE STEER

Page 1351 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (4) From the end of travel, rotate the rotor 2 1/2
full turns in the COUNTER CLOCKWISE direction.
The horn wire should end up at the top and the
squib wire at the bottom (Fig. 9).
(5) Install the stee