1992 MAZDA 323 lock

[x] Cancel search: lock

Page 58 of 279

MAZDA 323 1992  Workshop Manual Suplement TROUBLESHOOTING GUIDE F3 
4 CRANKS NORMALLY 8UT WILL NOT START (PARTfAL COMBUSTION) - AFTER WARM-UP 
&RIP- 
l Engine cranks at nurmal speed and shows partial combustion but will not Continue running a

Page 60 of 279

MAZDA 323 1992  Workshop Manual Suplement TROUBLESHOOTING GUlDE F3 
7 CRANKS NORMALLY BUT HARD TO START - AFTER WARM-UP 
* 
l Engrne cranks at normal speed but requkres excessive cranking time before starting after running and being 
DESCRIP-

Page 98 of 279

MAZDA 323 1992  Workshop Manual Suplement M FRONT AXLE 
WHEEL HUB, STEERING KNUCKLE 
RemovaI / Inspection I Installation 
1. Remove in the order shown in the figure, referring to Removal Note. 
2. Inspect all parts and repair or replace as ne

Page 99 of 279

MAZDA 323 1992  Workshop Manual Suplement FRONT AXLE M 
13EOMX308 
13EOMX-310 
1 
13EOMX-311 
Removal note 
Locknut 
Caution 
l Do not damage the drive shaft. 
l Do not reuse the locknut. 
1. 
Raise the staked portion of the locknut using a c

Page 104 of 279

MAZDA 323 1992  Workshop Manual Suplement REAR AXLE 
WHEEL HUB, KNUCKLE 
Removal I Inspection / installation 
1. Remove in the order shown in the figure, referring to 
Removal Note. 2. Inspect all parts and repair or replace as necessary. 
3.

Page 105 of 279

MAZDA 323 1992  Workshop Manual Suplement REAR AXLE M 
Removal note 
Locknut 
Caution 
l Do not damage the drive shaft. 
l Do not reuse the locknut. 
I. Raise the staked portion of the tocknut using a chisel. 
2. Lock the hub by applying the

Page 107 of 279

MAZDA 323 1992  Workshop Manual Suplement REAR AXLE 
13EOMX-330 
13EOMX-331 
I 
t3EOMX.318 
. _. 
-. 
3. Press out the bearing race by using the SST. 
Wheel bearing 
Remove the wheel bearing by using the SST. 
Dust cover 
Caution 
l Do not re

Page 111 of 279

MAZDA 323 1992  Workshop Manual Suplement N OUTLJNE 
UUTLJNE 
OUTLINE Of CONSTRUCTION 
l EncJine speed sensing power steering (ESPS) is standard equipment for all models. The construction and 
operation are basically the same as for previous