2014 BMW 6 SERIES COUPE engine

[x] Cancel search: engine

Page 128 of 247

BMW 6 SERIES COUPE 2014 F13 Owners Manual Commission regulations. Operation is gov‐
erned by the following:
FCC ID:▷NBG009014A.
Compliance statement:
This device complies with part 15 of the FCC
Rules. Operation is subject to the followin

Page 131 of 247

BMW 6 SERIES COUPE 2014 F13 Owners Manual Driving stability control systemsVehicle features and optionsThis chapter describes all standard, country-
specific and optional features offered with the
series. It also describes features that are n

Page 135 of 247

BMW 6 SERIES COUPE 2014 F13 Owners Manual COMFORT/ECO PROBalanced tuning.
COMFORT+ Comfort-oriented tuning of the shock absorb‐
ers for optimal traveling comfort.
Integral Active Steering The concept
Integral Active Steering is a combinatio

Page 137 of 247

BMW 6 SERIES COUPE 2014 F13 Owners Manual Indicator/warning lights
If TRACTION is activated, TRACTION is dis‐
played in the instrument cluster.
The indicator lamp lights up: TRAC‐
TION is activated.
SPORT+ Sporty driving with optimized su

Page 138 of 247

BMW 6 SERIES COUPE 2014 F13 Owners Manual ECO PROECO PRO, refer to page  178, provides consis‐
tent tuning to minimize fuel consumption for
maximum range with maximum driving stabili‐
zation.
Comfort functions and the engine controller
ar

Page 139 of 247

BMW 6 SERIES COUPE 2014 F13 Owners Manual Driving comfortVehicle features and options
This chapter describes all standard, country-
specific and optional features offered with the
series. It also describes features that are not
necessarily av

Page 146 of 247

BMW 6 SERIES COUPE 2014 F13 Owners Manual Cruise controlThe concept The system maintains a preset speed via the
buttons on the steering wheel. The system
brakes on downhill gradients if engine braking
is insufficient.
General information
Depe

Page 148 of 247

BMW 6 SERIES COUPE 2014 F13 Owners Manual Brief status displaySelected desired speed.
If --- appears briefly on the display for Check
Control messages, it is possible that the sys‐
tem requirements are currently not ready for
operations.
Di