2013 SSANGYONG TURISMO Parking

[x] Cancel search: Parking

Page 167 of 796

SSANGYONG TURISMO 2013  Service Manual 02-8
4. CHECK AND INSPECTION
1) Cylinder
(1) Compression pressure test
Specified value ▶
Compression ratio16.5 : 1 
Test conditionat normal operating temperature (80˚C)
Compression 
pressureStandar

Page 227 of 796

SSANGYONG TURISMO 2013  Service Manual 03-20
Water 
separator
(2) Di engine and its expected problems and remedies can be caused by 
     water in fuel
System supplement against paraffin separation ▶
In case of Diesel fuel, paraffin, one

Page 269 of 796

SSANGYONG TURISMO 2013  Service Manual 07-4
2. MAINTENANCE
1) Level Check
Park the vehicle on a level ground and apply the parking brake. Stop the engine and wait more than 5 
minutes.
Pull out the dipstick and wipe it with a clean cloth.

Page 274 of 796

SSANGYONG TURISMO 2013  Service Manual 08-51520-00
1) Coolant Level Check
Park the vehicle on level ground and apply the parking brake. Stop the engine and wait until it is 
cooled down.
The coolant level should be between the MAX and MIN

Page 284 of 796

SSANGYONG TURISMO 2013  Service Manual 09-8
(3) Starting with jumper cable
If the battery is weak or terminated, the battery from another vehicle can be used with jumper
cables to start the engine.
Connecting order ▶
The positive (+) ter

Page 308 of 796

SSANGYONG TURISMO 2013  Service Manual 12-98510-23
5) Normal Cancellation of the Cruise Control
The cruise control system will be canceled when one or more items of the following conditions are 
applied;
Keep the main cruise control switch

Page 414 of 796

SSANGYONG TURISMO 2013  Service Manual 10-98510-23
5) Normal Cancellation of the Cruise Control
The cruise control system will be canceled when one or more items of the following conditions are 
applied;
Keep the main cruise control switch

Page 434 of 796

SSANGYONG TURISMO 2013  Service Manual 02-38710-01
1. SPECIFICATIONS OF RK - STICS
1) Electrical Performance
2) Chattering of Input Signals
Vehicle speed input:
The vehicle speed calculating time is 1.0 seconds. The elapsed time of 1.5 sec
Page:   1-8 9-16 17-24 25-32 32 next >