Fuel Charging System (03.04)
Engine (03.00)
May 2007 Workshop Manual 3-4-5
17. Install fusebox bracket fixings.
18. Refit harness fir tree clips to cylinder head.
19. Refit engine breather hose.
20. Install VVT solenoid multiplug, position coil and CMP
harness (1x edge clip).
21. Install LH injectors (see Workshop Manual procedure
03.04.GH Injector - Fuel - LH Bank - Each - Renew).
22. Install ECM (see Workshop Manual procedure 03.14.BB Engine Control Module - RH Renew).
1. Install coils (see Workshop Manual procedure 03.07.HC
Coil Assembly - Engine Set - RH - Renew).
Fuel Injector - Each - LH Bank - Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure 10.01.EK Fuel System - Depressurise).
2. Remove corner cross brace.
3. Disconnect breather hoses from cam cover (x2) for access.
4. Disconnect purge line from manifold (quickfit) and support clip for access.
5. Disconnect heater hose from pipe (quick fit).
6. Release heater hose (x2) and throttle body hose (x2) from support bracket.
7. Remove booster hose from manifold and support clip.
8. Remove harness support bracket (bolt x1, nut x2) release harness clips (fir tree x3).
9. Release pipe support bracket (nuts x2, bolts x2) move aside.
10. Disconnect IAT multiplug.
11. Disconnect injector multiplugs (x4).
12. Unclip injector harness from cam cover (x2).
13. Disconnect breather hose from manifold (quickfit).
14. Remove Injector to rail clip (for injector to be changed).
15. Remove fuel rail bolts (x2) and lift rail with remaining injectors (tie aside).
16. Remove injector from manifold.
Installation
1. Install new O-rings to remaining injectors (lube O-rings).
2. Install clip to new injector then injector into rail.
3. Install rail (with injectors) to manifold (bolt x2) (torque) (taking care each injector is aligned correctly).
4. Connect breather hose to manifold (quickfit).
5. Connect IAT multiplug.
6. Unclip injector harness from cam cover (x2).
7. Connect injector multiplugs (x4).
8. Install pipe support br acket (nuts x2, bolts x2). 9. Install harness support bracket (bolt x1, nut x2) release
harness clips (fir tree x3).
10. Connect booster hose to manifold and support clip.
11. Connect heater hose from pipe (quick fit).
12. Install heater hose (x2) and throttle body hose (x2) from support bracket.
13. Connect purge line to manifold and into support clip.
14. Connect breather hoses (x2) to cam cover.
15. Install corner cross brace (t orque bolts with vehicle on
level ground).
Fuel Injector - Each - RH Bank - Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure 10.01.EK Fuel System - Depressurise).
2. Disconnect breather hose (quick fit) move aside.
3. Release harness fir tree clips (x3) from cylinder head and move aside.
4. Remove fuse box bracket fi xings (bolt and nut) (allows
movement).
5. Remove ECM (see Workshop Manual procedure 03.14.BB Engine Control Module - RH Renew).
6. Remove battery lead (1x nut and rubber cover) from fuse box (2x leads).
7. Remove multiplugs (x10) from fusebox.
8. Remove earth terminal (1x nut and rubber cover) from fusebox.
9. Remove fuse box from bracket (bolt x2).
10. Release harness fir tree clips (x3) from engine bracket.
11. Feed harness from inner wing and over engine to gain access to cam cover.
12. Remove purge pipe P-clip (bolt x1) and move pipe aside.
13. Remove harness bracket from engine (bolts x2, nut x1).
14. Release fuel feed hose from rail (clip x1) and move aside.
15. Disconnect heater hose from pipe (quick fit).
16. Release heater hose (clips x2) and EGR vacuum line
(clips x2) from bracket.
17. Release harness from coolan t pipe bracket (fir tree x3).
18. Disconnect EGR (x1), fuel rail pressure sensor (x1) and injector multiplugs (x4), move harness aside.
19. Remove coolant pipe bracket (nuts x2 and bolts x2).
20. Disconnect EGR vac pipe from sensor and manifold, move aside.
21. Remove Injector to rail clip (for injector to be changed).
22. Remove fuel rail bolts (x2) and lift rail with remaining injectors (tie aside).
23. Remove injector from manifold.
Repair Operation Time (ROT)
Repair Operation Time (ROT)
Fuel Charging System (03.04)
Engine (03.00)3-4-6 Workshop Manual May 2007
Installation
1. Install new O-rings to remaining injectors (lube O-ringP-
clips).
2. Install clip to new injector then injector into rail.
3. Install rail (with injectors) to manifold (bolt x2) (torque)
(taking care each injector is aligned correctly).
4. Connect EGR vac pipe to sensor and manifold.
5. Install coolant pipe bracket (bolt x2, nut x2).
6. Connect EGR (x1), fuel rail pressure sensor (x1) and injector multiplugs (x4).
7. Refit harness to coolant pipe bracket (fir tree x3).
8. Connect heater hose to pipe (quick fit).
9. Refit heater hose (clipx2) and EGR vacuum lines (clips
x2) to bracket.
10. Install fuel feed pipe.
11. Install purge pipe P-clip.
12. Install harness bracket to engine.
13. Feed harness into inner wing area.
14. Install fusebox to bracket.
15. Install earth lead to fusebox.
16. Install battery lead to fusebox (1x nut and rubber cover).
17. Install multiplugs to fuse box.
18. Install fusebox bracket fixings.
19. Refit harness fir tree clips to cylinder head.
20. Refit engine breather hose.
21. Install VVT solenoid multiplug, position coil and CMP harness (1x edge clip).
22. Install ECM (see Workshop Manual procedure 03.14.BB Engine Control Module - RH Renew).
Engine Set - Fuel Injector - LH Bank -
Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure 10.01.EK Fuel System - Depressurise).
2. Remove corner cross brace.
3. Disconnect breather hoses from cam cover (x2) for access.
4. Disconnect purge line from manifold (quickfit) and
support clip for access.
5. Disconnect heater hose from pipe (quick fit).
6. Release heater hose (x2) and throttle body hose (x2)
from support bracket.
7. Remove booster hose from manifold and support clip.
8. Remove harness support bracket (bolt x1, nut x2) release harness clips (fir tree x3). 9. Release pipe support bracket
(nuts x2, bolts x2) move
aside.
10. Disconnect IAT multiplug.
11. Disconnect injector multiplugs (x4).
12. Unclip injector harness from cam cover (x2).
13. Disconnect breather hose from manifold (quickfit).
14. Remove Injector to rail clips.
15. Remove fuel rail bolts (x2) and lift rail (tie aside).
16. Remove injectors from manifold.
Installation
1. Install clips on to new injectors then fit injectors into manifold.
2. Install rail onto injectors (taking care each injector is aligned correctly and the clip seats properly) and fit bolts
(x2) (torque).
3. Connect breather hose to manifold (quickfit).
4. Connect IAT multiplug.
5. Unclip injector harness from cam cover (x2).
6. Connect injector multiplugs (x4).
7. Install pipe support bracket (nuts x2, bolts x2).
8. Install harness support bracket (bolt x1, nut x2) release harness clips (fir tree x3).
9. Connect booster hose to manifold and support clip.
10. Connect heater hose from pipe (quick fit).
11. Install heater hose (x2) and throttle body hose (x2) from support bracket.
12. Connect purge line to manifold and into support clip.
13. Connect breather hoses (x2) to cam cover.
14. Install corner cross brace (torque bolts with vehicle on level ground).
Engine Set - Fuel Injector - RH Bank -
Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure 10.01.EK Fuel System - Depressurise
2. Disconnect breather hose (quick fit) move aside.
3. Release harness fir tree clips (x3) from cylinder head and move aside.
4. Remove fuse box bracket fixings (bolt and nut) (allows movement).
5. Remove ECM (see Workshop Manual procedure 03.14.BB Engine Contro l Module - RH Renew).
6. Remove battery lead (1x nut and rubber cover) from fuse box (2x leads).
7. Remove multiplugs (x10) from fusebox.
Repair Operation Time (ROT)
Repair Operation Time (ROT)
ItemCode
Engine Set-Fuel Injector-RH Bank-
Renew LHD
03.04.GK
Engine Set-Fuel Injector-RH Bank-
Renew RHD
03.04.GP
Power Conversion (03.11)
Engine (03.00)
May 2007 Workshop Manual 3-11-7
27. Clean flywheel and mating face on crankshaft.
28. Install flywheel, align to dowel on crankshaft flange.
29. Install new bolts (x8), install tool (303-1185) to restrain
flywheel. Torque tighten bolts (x8) in the correct
sequence.
30. Clean clutch cover and drive plate.
31. Install clutch assembly on fl ywheel, align to dowels (x3).
32. Install bolts (x6), install clutch alignment tool, evenly torque tighten bolts (x6) in a diagonal sequence.
Remove clutch alignment tool.
33. Remove bolts (x2), collect tool (303-1185).
34. Install inspection cover, install and torque tighten bolts (x2).
35. Install engine sump (see Workshop Manual procedure 03.02.CN Pan - Oil Sump - Remove and Reseal With
Engine Removed).
Piston-Renew (Engine Set)
Removal
1. Remove cylinder head gaskets - engine set (see Workshop Manual procedure 03.01.HW Gasket -
Cylinder Head - Engine Set - Renew With Engine
Removed).
2. Remove crankshaft timing sprocket from crankshaft.
3. Install guide pin through lower hole on chain tensioner.
4. Remove bolt securing oil pr essure pump chain tensioner
assembly to engine bedplate (see Figure 1).
Figure 1
5. Remove tensioner assembly (see Figure 2). 6. Remove bolts (x3) securing oil pressure pump to sump
(see Figure 3).
Figure 3
7. Release chain from oil pressure pump sprocket, remove oil pump.
8. Remove and discard oil pressure pump gasket.
9. Remove bolts (x3) securing oil scavenge pump to sump
(see Figure 4).
Figure 4
10. Release chain from oil scavenge pump sprocket, remove scavenge pump.
Repair Operation Time (ROT)
WA R N I N G
DO NOT GET USED ENGINE OIL ON YOUR SKIN.
USED ENGINE OIL CAN BE HARMFUL.
A0302274
A0302274A
A0302274B
Power Conversion (03.11)
Engine (03.00)3-11-12 Workshop Manual May 2007
12. Install piston ring clamp to each piston in turn and install
in its respective cylinder bore. Remove piston ring
clamp (see Figure 19).
Figure 19
13. Lubricate crankshaft journa ls with clean engine oil.
14. Carefully pull each connecting rod into place on each crankshaft journal.
15. Install bearing caps to their relevant connecting rods. Install and torque tighten retaining bolts (x16).
16. Clean windage tray.
17. Install windage tray, install and torque tighten bolts (x8).
18. Clean old sealant from sump flange and engine bedplate.
19. Ensure that sump flange and mating face on engine bedplate are clean and dry.
20. Apply a continuous 3mm diameter bead of RTV sealant to sump flange as recommended.
21. Ensure that there are no gaps in sealant track.
22. Install sump, install and torque tighten bolts (x16) in the correct sequence.
23. Install A/C compressor mounting bracket, install and torque tighten Torx bolts (x4).
24. Lubricate and install new O-ring seals to oil pipes.
25. Install oil pipes in sump, install and torque tighten bolts (x2)
26. Install compressor, install and torque tighten bolts (x4).
27. Connect multiplug to A/C compressor.
28. Install LH and RH HEGO sensor multiplug brackets to sump. Install and torque tighten bolts (x4).
29. Secure harness clips (x6) in sump.
30. Connect multiplug to crankshaft timing sensor.
31. Connect multiplug to engine electric coolant temperature sensor.
32. Connect multiplug to oil pressure sensor.
33. Clean oil scavenge pump and mating face on sump.
34. Install oil pump(s) drive sprocket. 35. Install new oil scavenge pump gasket, align on dowels
(x2).
36. Install chain onto oil scavenge pump sprocket.
37. Install oil scavenge pump, align to dowels (x2), Install
and torque tighten bolts (x3).
38. Install chain onto oil pump drive sprocket.
39. Clean oil pressure pump and mating face on sump.
40. Install new gasket to sump, align to dowels (x2).
41. Position oil pressure pu mp, install chain on pump
sprocket.
42. Install oil pressure pump, align to dowels (x2), Install and
torque tighten bolts (x3).
43. Install chain tensioner, install and torque tighten bolt, remove guide pin.
44. Install crankshaft timing sprocket.
45. Install cylinder head gaskets - engine set (see Workshop Manual procedure 03.01.HW Gasket - Cylinder Head -
Engine Set - Renew Wi th Engine Removed).
Piston-Renew
Removal
1. Remove cylinder head gaskets - engine set (see
Workshop Manual procedure 03.01.HW Gasket -
Cylinder Head - Engine Set - Renew With Engine
Removed).
2. Remove crankshaft timing sprocket from crankshaft.
3. Install guide pin through lower hole on chain tensioner.
4. Remove bolt securing oil pressure pump chain tensioner assembly to engine bedplate (see Figure 1).
Figure 1
Caution
When assembling connecting rods and connecting rod
bearing caps it is imperative that bearing slots and tangs
be located on the same side of the connecting rods.
A0311337
Repair Operation Time (ROT)
ItemCode
Piston-Renew 03.11.CH
WAR NI NG
DO NOT GET USED ENGINE OIL ON YOUR SKIN.
USED ENGINE OIL CAN BE HARMFUL.
A0302274
Power Conversion (03.11)
Engine (03.00)3-11-18 Workshop Manual May 2007
6. Correctly position ring gaps on piston prior to
installation.
7. Remove connecting rod bearing cap.
8. Install bearings in connecting rod and bearing cap.
9. Lubricate cylinder bore, pi ston and rings with clean
engine oil.
10. Install special tools (303-535) to the connecting rod to prevent damage to crankshaft journal.
11. Install piston ring clamp to piston, install piston assembly in its cylinder bore. Remove piston ring clamp.
12. Lubricate crankshaft journal with clean engine oil.
13. Carefully pull connecting rod into place on crankshaft journal.
14. Install bearing cap to connecting rod. Install and torque tighten retaining bolts (x2).
Piston Ring-Renew (Engine Set)
Removal
1. Remove cylinder head gaskets - engine set (see Workshop Manual procedure 03.01.HW Gasket -
Cylinder Head - Engine Set - Renew With Engine
Removed).
2. Remove crankshaft timing sprocket from crankshaft.
3. Install guide pin through lower hole on chain tensioner.
4. Remove bolt securing oil pressure pump chain tensioner assembly to engine bedplate (see Figure 1).
Figure 1
5. Remove tensioner assembly (see Figure 2).
Figure 2
6. Remove bolts (x3) securing oil pressure pump to sump.
7. Release chain from oil pres sure pump sprocket, remove
oil pump.
8. Remove and discard oil pressure pump gasket.
9. Remove bolts (x3) securing oil scavenge pump to sump (see Figure 3).
Figure 3
10. Release chain from oil scavenge pump sprocket, remove scavenge pump.
Caution
Make sure the piston ring gaps are positioned at
different positions opposite th e thrust side of the piston
before installation.
Caution
Install pistons into cylinder block with the ‘arrow’ on the
piston crown facing to the front of the engine.
Repair Operation Time (ROT)
WAR NI NG
DO NOT GET USED ENGINE OIL ON YOUR SKIN. USED ENGINE OIL CAN BE HARMFUL.
A0302274
A0302274
A0302274B
Power Conversion (03.11)
Engine (03.00)
May 2007 Workshop Manual 3-11-23
32. Clean oil scavenge pump and mating face on sump.
33. Install oil pump(s) drive sprocket.
34. Install new oil scavenge pump gasket, align on dowels
(x2).
35. Install chain onto oil scavenge pump sprocket.
36. Install oil scavenge pump, al ign to dowels (x2), Install
and torque tighten bolts (x3).
37. Install chain onto oi l pump drive sprocket.
38. Clean oil pressure pump and mating face on sump.
39. Install new gasket to sump, align to dowels (x2).
40. Position oil pressure pu mp, install chain on pump
sprocket.
41. Install oil pressure pump, align to dowels (x2), Install and
torque tighten bolts (x3).
42. Install chain tensioner, install and torque tighten bolt, remove guide pin.
43. Install crankshaft timing sprocket.
44. Install cylinder head gaskets - engine set (see Workshop Manual procedure 03.01.HW Gasket - Cylinder Head -
Engine Set - Renew With Engine Removed).
Piston Ring-One Piston Set-Renew
Removal
1. Remove cylinder head gaskets - engine set (see Workshop Manual procedure 03.01.HW Gasket -
Cylinder Head - Engine Set - Renew With Engine
Removed).
2. Remove crankshaft timing sprocket from crankshaft.
3. Install guide pin through lower hole on chain tensioner.
4. Remove bolt securing oil pr essure pump chain tensioner
assembly to engine bedplate (see Figure).
Figure
5. Remove tensioner assembly.
6. Remove bolts (x3) securing oil pressure pump to sump.
7. Release chain from oil pressure pump sprocket, remove oil pump. 8. Remove and discard oil pressure pump gasket.
9. Remove bolts (x3) securing
oil scavenge pump to sump
(see Figure 2).
Figure 2
10. Release chain from oil scavenge pump sprocket, remove scavenge pump.
11. Remove and discard oil scavenge pump gasket (see Figure 3).
Figure 3
12. Remove oil pump(s) drive sprocket.
13. Disconnect multiplug from oil pressure sensor (see
Figure 4).
Figure 4
Repair Operation Time (ROT)
WA R N I N G
DO NOT GET USED ENGINE OIL ON YOUR SKIN. USED ENGINE OIL CAN BE HARMFUL.
A0302274
A0302274B
A0302276
A030216
Power Conversion (03.11)
Engine (03.00)3-11-28 Workshop Manual May 2007
2. Remove bolts (x2) securing bearing cap to connecting
rod, remove bearing cap (see Figure 2).
Figure 2
3. Install special tools (303-535) to the connecting rod to prevent damage to crankshaft journal.
4. Carefully push connecting rod/piston assembly upwards and remove from cylinder bore.
5. Remove special tools from connecting rod.
6. Install bearing cap on connecting rod, install and lightly tighten retaining bolts.
Installation
1. Clean cylinder bore.
2. Install piston rings in cylinder bore to a pre-determined depth and measure ring gaps.
3. Remove piston ring set from cylinder bore and install on piston.
4. Clean connecting rod.
5. Correctly position ring gaps on piston prior to installation.
6. Remove connecting rod bearing cap.
7. Install bearings in connecting rod and bearing cap.
8. Lubricate cylinder bore, pi ston and rings with clean
engine oil.
9. Install special tools (303-535) to the connecting rod to prevent damage to crankshaft journal. 10. Install piston ring clamp to piston, install piston assembly
in its cylinder bore. Remove piston ring clamp (see
Figure 3).
Figure 3
11. Lubricate crankshaft jour nal with clean engine oil.
12. Carefully pull connecting rod into place on crankshaft journal.
13. Install bearing cap to connecting rod. Install and torque tighten retaining bolts (x2).
Connecting Rod-Renew (Engine Set)
Removal
1. Remove cylinder head gaskets - engine set (see Workshop Manual procedure 03.01.HW Gasket -
Cylinder Head - Engine Set - Renew With Engine
Removed).
2. Remove crankshaft timing sprocket from crankshaft.
3. Install guide pin through lower hole on chain tensioner.
4. Remove bolt securing oil pressure pump chain tensioner assembly to engine bedplate (see Figure 1).
Figure 1
5. Remove tensioner assembly.
Caution
When using a 'two post' vehicle ramp, remove the
screws that secure the rear section of the wheel arch
liner to body. Hold back the rear section of the wheel
arch liner to correctly position the foot of the vehicle lift.
Caution
Make sure the piston ring gaps are positioned at
different positions opposite th e thrust side of the piston
before installation.
A0311314
Repair Operation Time (ROT)
ItemCode
Connecting Rod-Renew 03.11.CN
WAR NI NG
DO NOT GET USED ENGINE OIL ON YOUR SKIN.
USED ENGINE OIL CAN BE HARMFUL.
A0311337
A0302274
Power Conversion (03.11)
Engine (03.00)3-11-34 Workshop Manual May 2007
30. Clean oil scavenge pump and mating face on sump.
31. Install oil pump(s) drive sprocket.
32. Install new oil scavenge pump gasket, align on dowels
(x2).
33. Install chain onto oil scavenge pump sprocket.
34. Install oil scavenge pump, align to dowels (x2), Install and torque tighten bolts (x3).
35. Install chain onto oil pump drive sprocket.
36. Clean oil pressure pump and mating face on sump.
37. Install new gasket to sump, align to dowels (x2).
38. Position oil pressure pump, install chain on pump sprocket.
39. Install oil pressure pump, alig n to dowels (x2), Install and
torque tighten bolts (x3).
40. Install chain tensioner, install and torque tighten bolt, remove guide pin.
41. Install crankshaft timing sprocket.
42. Install cylinder head gaskets - engine set (see Workshop Manual procedure 03.01.HW Gasket - Cylinder Head -
Engine Set - Renew With Engine Removed).
Crankshaft Damper Pulley Assembly-
Renew
Removal
1. Remove engine drive belt (see Workshop Manual procedure 03.05.AB Belt - Engine Drive - Renew).
2. Raise vehicle on ramp.
3. Remove bolts (x2), inspection cover to lower crankcase, remove cover.
4. Install tool (303-1185) to restrain flywheel, install and tighten bolts (x2).
5. Install thrust button of tool (303 -1186) in crankshaft,
position tool in pulley, secure with bolts (x2). Tighten
centre bolt, withdraw pu lley from crankshaft.
6. Collect crankshaft pulley, locking ring and special tool thrust button.
7. Remove special tool from pulley. 8. Remove and discard O-ring seal from pulley (see
Figure 1).
Figure 1
Installation
1. Clean crankshaft pulley, locking ring and mating face on
crankshaft.
2. Lubricate and install new O-ring seal in crankshaft pulley.
3. Install crankshaft pulley, locking ring and new pulley bolt.
4. Torque tighten crankshaft pulley bolt. Remove special tool (303-1185) from crankcase.
5. Install inspection cover to lower crankcase, install and tighten bolts (x2).
6. Lower vehicle on ramp.
7. Install engine drive belt (see Workshop Manual procedure 03.05.AB Belt - Engine Drive - Renew).
Crankshaft Front Oil Seal-Renew
Removal
1. Battery isolation switch ‘OFF’.
2. Raise vehicle on ramp.
3. Remove crankshaft pulley (see Workshop Manual procedure 03.11.CP Pulley Assembly - Crankshaft
Damper - Renew).
Repair Operation Time (ROT)
Caution
The bolt thread in the cran kshaft must be cleaned out
before a new crankshaft pulley retaining bolt is installed
Repair Operation Time (ROT)
ItemCode
Crankshaft Front Oi l Seal-Renew 03.11.CQ
A0311321