Subframes (02.03)
Frame and Mounting (02.00)
2-1-8 Workshop Manual May 2007
8. Remove bolts (x2), remove both spring/damper assemblies.
9. Remove nuts (x2), anti-roll bar links to lower suspension
arms.
10. Remove bolts (x4). anti-roll bar to subframe. Remove anti-roll bar.
11. Disconnect ABS sensor mult iplugs (x2), release sensor
harness clips (x4) from both toe control arms.
12. Disconnect brake pad wear sensor multiplugs (x2). Release connectors (x2) from subframe.
13. Loosen and disconnect brake pipe unions (x2) from subframe brackets. Pl ug pipe connections.
14. Disconnect multiplug fr om ride height sensor.
15. Remove nut/bolt securing ride height sensor link to
upper suspension arm.
16. Remove bolts (x2), ride height sensor to subframe. Remove sensor.
17. Remove nuts/bolts (x2) and cam washers (x2), toe control arms to subframe.
18. Remove bolts (x2), nuts/bolts (x2) and cam washers (x2),
securing lower suspension arms to subframe
19. Remove nuts/bolts (x4), upper suspension arms to subframe.
20. With assistance, remove suspension assemblies from subframe.
21. Remove heatshield clips (x2) from rear of subframe.
22. Release clips (x23), ha rness to subframe, remove
harness.
23. Release brake pipes from cl ips (x7), remove pipes (x2).
24. Remove brake pipe clips (x5) from subframe.
Installation
1. Clean suspension components and brake pipes.
2. Instal brake pipe clips (x5) in subframe.
3. Install brake pipes (x2) in clips (x7).
4. Install harness and secure with clips (x23).
5. Install heatshield clips (x2).
6. With assistance, install suspension assemblies in subframe.
7. Install bolts/nuts (x4), upper suspension arm to subframe. Do not torque tighten at this stage.
8. Install bolts (x2), bolts/nuts (x2) and cam washers (x2) securing lower suspension arm to subframe. Do not
torque tighten at this stage.
9. Position toe control arm, install bolts (x2, cam washers (x2 and nuts (x2). Do not torque tighten at this stage.
10. Install ride height sensor, in stall and torque tighten bolts
(x2).
11. Align ride height sensor li nk to upper suspension arm,
install bolt/nut, tighten to correct torque.
12. Connect multiplug to ride height sensor. 13. Remove pipe plugs, install and torque tighten brake
pipe unions.
14. Connect brake pad wear sensor multiplugs, install in subframe brackets.
15. Connect ABS sensor multiplugs (x2), install harness clips (x4), in toe control arms.
16. Install anti-roll bar, install bolts (x4). Do not torque tighten at this stage.
17. Align anti-roll bar links to lower suspension arms. Install nuts (x2), do not torque tighten at this stage.
18. Install spring/damper assemblies (x2). Install bolts (x2), do not torque tighten at this stage
19. With assistance, install transaxle in subframe. Install and torque tighten hydramount nuts (x2).
20. Lower hoist, remove slings.
21. Align driveshafts to transaxle flanges, install plates (x6), new Allen bolts (x12) and tighten to correct torque.
22. Install rear subframe asse mbly (see Workshop Manual
procedure 02.01.CA Subframe Assembly - Rear -
Remove for Access and Refit).
23. Connect vehicle battery.
24. 4 wheel alignment check/adjust (see Workshop Manual procedure 04.00.AD 4 Wheel Alignment - Check and
Adjust).
25. Final torque tighten all suspension nuts/bolts.
RH/LH Transmission Rear Hydromount
Isolator Assembly-Renew
Removal
1. Raise vehicle on ramp.
2. Remove rear exhaust silenc er (see Workshop Manual
procedure 09.00.KA Silencer and Bypass Valve
Assembly - Remove for Access and Refit).
3. Remove bolts (x4) from subframe cross brace.
4. Loosen clamp nut and release rear exhaust pipe from centre pipe.
5. Remove rear exhaust pipe through subframe.
6. Position hydraulic lift er to support transaxle.
Caution
Always plug pipe connections to prevent ingress of dirt.
New Allen bolts should have a thread lock coating.
Caution
Final tightening of suspension components must be
carried out with the suspensi on arms at normal ride
height.
Repair Operation Time (ROT)
ItemCode
Transmission Rear Hydromount
Isolator Assembly-Renew RH
02.03.BC
Transmission Rear Hydromount
Isolator Assembly-Renew LH
02.03.BD
Warning
To avoid personal injury, i.e. severe burns to the skin, allow exhaust system to cool down before removing
exhaust system components.
Engine Assembly (03.00)
Engine (03.00)3-0-14 Workshop Manual Issue 5, January 2010
40. Secure ECM and cover plate with bolts (x3) (refer to Figure 36).
41. Reclip ECM harness.
42. Reclip repeater light and screen wash system harness.
43. Connect repeater light multiplug.
44. Install starter cable to floor st ud (nut x1) (refer to Figure
37). 45. Feed harness to inside of vehicle install grommet to
body (refer to Figure 38).
46. Position harness to body and install clips (x11).
47. Connect multiplugs (x4) from inside of vehicle RH side of I.P. (refer to Figure 39).
48. Install earth wires to terminals (nuts x13).
Figure36
Figure 37
$ 3 #
$ 3 #
Figure 38
Figure 39
$ 3 #
$ 3 #
Engine Structure (03.01)
Issue 4, November 2008Workshop Manual 3-1-3
Knock Sensors
Two knock sensors (1) are installed into the cylinder block on the inboard side of each of the two cylinder banks. The
electrical connector of each sensor is secured to th e left-hand engine cover bracket (Refer to Figure 4).
These piezo-electric sensors send inputs to the ECM to indicate the detection and location of detonation during
combustion.
Bedplate
This is a structural casting that is attached with bolts to the bottom
of the cylinder block t attach the crankshaft and to further
improve overall rigidity.
Main bearing clearance changes due to expansion are minimized
by means of iron inserts cast into the bedplate main bearing
supports.
Two hollow dowels align the bedplate with the cylinder block and
the joint is sealed by a continuous bead of sealant.
Engine Mountings
The engine is mounted at two points. At the front, on ea ch side of the engine, there is a mounting bracket with a
Hydramount mounted to the subframe.
E 43437
Engine Structure (03.01)
Issue 4, November 2008Workshop Manual 3-1-11
23. Install VVT solenoid multiplug, position coil and CMP
harness (1x edge clip).
24. Install corner cross brace (t orque bolts with vehicle on
level ground).
25. Install coil cover.
Installation LH Side
26. Connect breather hose to manifold (quickfit).
27. Connect IAT multiplug.
28. Install injector harness to cam cover (x2).
29. Connect injector multiplugs (x4).
30. Install pipe support bracket (nuts x2, bolts x2).
31. Install harness support bracket (bolt x1, nut x2) release harness clips (fir tree x3).
32. Connect booster hose to manifold and support clip.
33. Connect heater hose from pipe (quick fit).
34. Install heater hose (x2) and throttle body hose (x2) from support bracket.
35. Connect purge line to mani fold and into support clip.
36. Connect breather hoses (x2) to cam cover.
37. Feed harness into inner wing area.
38. Install fusebox to bracket.
39. Install earth lead to fusebox.
40. Install battery lead to fusebox (1x nut and rubber cover).
41. Install multiplugs to fuse box.
42. Install fusebox bracket fixings.
43. Install ECM (see Workshop Manual procedure 03.13.ND Module - Powe r Train Control - RHD -
Renew)
44. Install coil cover.
45. Refill coolant (see Workshop Manual procedure 03.03.AD Coolant - Drain and Refill).
46. Install cross brace. (torque bolts with vehicle on level
ground).
Intake Manifold Assembly - Remove for
Access and Refit (With Engine Removed
)
Removal
1. Remove RH coil cover.
2. Disconnect breather hose (quick fit).
3. Release alternator and injector harness fir tree clips (x3) from cylinder head.
4. Remove nut and bolts (x2) securing harness bracket to
engine, remove bracket.
5. Release heater hose (clips x2) and EGR vacuum line (clips x2) from bracket.
6. Release alternator and injector harness fir tree clips (x3) from coolant pipe bracket. 7. Disconnect multiplugs from EGR valve, fuel rail pressure
sensor and injectors (x4).
8. Remove nuts (x2) and bolts (x2) securing coolant pipe
bracket, remove bracket.
9. Disconnect EGR vacuum pipe from sensor and manifold.
10. Remove LH coil cover.
11. Disconnect breather hoses (x2) from LH engine cover.
12. Disconnect purge line from manifold (quickfit) and
support clip for access.
13. Disconnect heater hose from pipe (quick fit).
14. Release heater hose (x2) and throttle body hose (x2) from support bracket.
15. Remove bolt and nuts (x2) securing harness support bracket, release harness clips (fir tree x3). Remove
bracket.
16. Remove nuts (x2) and bolts (x2) pipe support bracket.
17. Disconnect injector multiplugs (x4).
18. Release injector harness clip s (x2) from LH engine cover.
19. Disconnect IAT multiplug.
20. Disconnect breather hose from manifold (quickfit).
21. Disconnect manifold heating hoses (x2).
22. Disconnect throttle body multiplug and harness clip.
23. Disconnect EGR vacuum hose.
24. Loosen and disconnect EGR pipe union from EGR valve.
25. Remove bolts (x2) securing EGR pipe to RH exhaust
manifold, remove pi pe, discard gasket.
26. Progressively loosen and remove bolts (x 10) securing intake manifold to cylinder heads (see Figure 1).
Figure 1
27. Carefully remove intake ma nifold from cylinder heads.
28. Remove and discard gaskets (x2).
Installation
1. Clean intake manifold and mating faces on cylinder heads.
2. Install new gaskets to cyli nder block (glue in place).
3. Install intake manifold (allowing access to install bolt for purge line P-clip).
4. Install and torque tighten in take manifold bolts (x10) in
the correct sequence.
5. Clean EGR pipe and mating face on exhaust manifold.
Repair Operation Time (ROT)
A030113
Engine Structure (03.01)
3-1-12Workshop ManualIssue 4, November 2008
6. Install new gasket on exhaust manifold.
7. Install EGR pipe to exhaust manifold and EGR valve.,
8. Install EGR pipe to EGR valve, install pipe union. Do not
torque tighten at this stage.
9. Install and torque tighten bolts (x2), EGR pipe to exhaust manifold. Torque tighten pipe union.
10. Connect EGR vacuum hose.
11. Connect throttle body multiplug and harness clip.
12. Connect manifold heating hoses (x2).
13. Connect EGR vacuum pipe to sensor and manifold.
14. Install coolant pipe bracket, install and torque tighten bolts (x2) and nuts (x2).
15. Connect multiplugs to EGR valve, fuel rail pressure
sensor and injectors.
16. Install alternator and injector harness fir tree clips (x3) to coolant pipe bracket.
17. Install heater hose clips (x2) and EGR vacuum lines clips (x2) to bracket.
18. Install harness bracket to engine.
19. Refit harness fir tree clips to cylinder head.
20. Refit engine breather hose.
21. Install VVT solenoid multiplug, position coil and CMP harness (1x edge clip).
22. Install coil cover.
23. Connect breather hose to manifold (quickfit).
24. Connect IAT multiplug.
25. Secure injector harness clips (x2) to LH engine cover.
26. Connect injector multiplugs (x4).
27. Install pipe support bracket, install and tighten nuts (x2
and bolts(x2).
28. Install harness support bracket, install and tighten bolt (x1) and, nut (x1).
29. Install heater hoses (x2) an d throttle body hoses (x2) in
support bracket.
30. Connect breather hoses (x2) to engine cover.
31. Install coil cover.
RH/LH Cylinder Head Gasket - Renew
Removal
1. Re-install front subframe to body, install and tighten bolts (x6), remove support trolley.
2. Install and tighten engine mounting nuts (x2).
3. With assistance, remove engine lifting beam (SPX M553D). 4. Remove SAI pump and bracket assembly (see Workshop
Manual procedure 03.08.DB/03.08.DJ Pump and
Bracket Assembly - Secondary Air Injection - Renew).
5. Disconnect multiplugs (x2) from knock sensors.
6. Disconnect multiplug from camshaft timing sensor.
7. Remove RH/LH exhaust manifold (see Workshop Manual procedure 09.00.CC/09.00.CD Gasket -
Exhaust Manifold - RH/LH - Renew).
8. Remove RH/LH intake camshaft (see Workshop Manual procedure 03.09.AT/03.09.AV Camshaft - Intake - RH/
LH - Renew).
9. Remove RH exhaust camshaft bearing cap retaining bolts (x10) evenly and in stages (see Figure 1).
Figure 1
10. Note their orientation and markings and remove the RH
exhaust camshaft bearing caps.
11. Remove RH exhaust camshaft (see Figure 2).
12. Remove bolts (x2) securing front end of RH cylinder
head to cylinder block.
Repair Operation Time (ROT)
Figure 2
A0309258
A0309260
Engine Structure (03.01)
Issue 4, November 2008Workshop Manual 3-1-13
13. Remove bolts (x10), evenly and in stages securing RH
cylinder head to cylinder block (see Figure 3).
Figure 3
14. With assistance, remove RH cylinder head assembly.
15. Remove and discard cylinder head gasket.
Installation
1. Thoroughly clean RH cylind er head face and retaining
bolt pockets.
2. Thoroughly clean RH cylinder block face.
3. Thoroughly clean and dry RH cylinder head retaining
bolts.
4. Install new RH cylinder gasket, locate on dowels.
5. With assistance, install RH cylinder head, locate on dowels.
6. Install and torque tighten cylinder head bolts (x12) in the correct sequence.
7. Lubricate RH exhaust camsha ft journals, camshaft lobes,
bearing surfaces on cylinder head and bearing caps with
clean engine oil.
8. Install RH exhaust camshaft, install bearing caps (x5) in their original positions.
9. Install bolts (x10) and torque tighten in the sequence specified.
10. Install sprocket retaining Torx bolt in camshaft.
11. Rotate camshaft accordingly and check each valve clearance using feeler gauges.
12. Remove sprocket retaining Torx bolt.
13. Install RH/LH intake cams haft (see Workshop Manual
procedure 03.09.AT/03.09.AV Camshaft - Intake - RH/
LH - Renew).
14. Install timing chain tensioni ng tool (303-532) into RH
exhaust camshaft sprocket.
15. Apply a force to the tool (303-532) in an anti-clockwise direction and torque tighten RH sprocket Torx bolts.
Remove special tool.
16. Connect multiplug to cam a haft timing sensor.
17. Connect multiplugs (x2) to knock sensors.
18. Install SAI pump and bracket assembly (see Workshop Manual procedure 03.08.DB/03.08.DJ Pump and
Bracket Assembly - Secondary Air Injection - Renew). 19. Install RH/LH exhaust manifold (see Workshop Manual
procedure 09.00.CC/09.00.CD Gasket - Exhaust
Manifold - RH/LH - Renew).
20. With assistance, position engine support beam (SPX M553D) and secure to engine.
21. Position trolley, support front subframe, remove bolts (x6), raise vehicle, remove trolley.
22. Install and torque tighten engine mounting nuts (x2).
RH/LH Cylinder Head - Overhaul
1. Remove cylinder head gasket - RH (see Workshop Manual procedure 03.01.GU Gasket - Cylinder Head -
RH - Renew).
2. Remove Torx screws (x2) se curing EGR tube to cylinder
head, remove tube.
3. Remove and discard gasket.
4. Remove bolt securing camshaf t timing sensor to cylinder
head, remove sensor.
5. Remove bolts (x2) securing knock sensors (x2) to cylinder head, remove sensors.
6. Remove spark plugs from cylinder head.
7. Remove selective tappet buckets, keep in their fitted order.
8. Position valve spring compressor, compress valve spring (see Figure 1).
Figure 1
9. Remove collets (x2), releas e/remove spring compressor,
collect collar and valve spring.
10. Remove valve from cylinder.
11. Remove valve stem oil seal.
12. Repeat procedure for remaining valve assemblies.
13. Keep valves and springs in their fitted order.
A0310319
Repair Operation Time (ROT)
A0301310
Engine Structure (03.01)
3-1-14Workshop ManualIssue 4, November 2008
14. Inspect cylinder head face for warpage, across centre
and from corner to corner.
15. Check condition and measure free length of valve springs.
16. Decarbonise combustion chambers and exhaust ports.
17. Measure valve stem diameters.
18. Use new valves and check valve guide clearance.
Installation
1. Clean cylinder head face and inlet/exhaust manifold faces. Use and air line to completely dry cylinder head
surfaces.
2. Lubricate and install intake and exhaust valves (x16).
3. Install valve stem oil seals.
4. Install valve springs and collars.
5. Using valve spring compressor, compress valve spring, install collets.
6. Release/remove spring compressor.
7. Repeat procedure for remaining valve assemblies.
8. Install selective tappet buckets in their original fitted positions.
9. Lubricate intake camshaft bearings and journals with clean engine oil.
10. Install intake camshaft, install bearing caps (x5), install bolts (x10).
11. Torque tighten bearing cap bolts in the correct sequence.
12. Lubricate exhaust camshaft be arings and journals with
clean engine oil.
13. Install exhaust camshaft, install bearing caps (x5), install bolts (x10).
14. Torque tighten bearing cap bolts in the correct sequence.
15. Install camshaft sprocket Torx bolts in intake and exhaust camshafts.
16. Rotate intake camshaft clockwise, check and log each valve clearance using feeler gauges.
17. Calculate the correct tappet bucket grade.
18. Repeat procedure for exhaust valve clearances.
19. Remove bearing cap bolts (x10), remove bearing caps (x5), remove intake camshaft.
20. Remove tappet buckets, install selected tappet buckets.
21. Repeat procedure for exhaust valve clearances.
22. Install intake camshaft, install bearing caps (x5), install bolts (x10).
23. Torque tighten bearing cap bolts in the correct sequence.
24. Rotate intake camshaft clockwise, re-check each valve clearance using feeler gauges.
25. Repeat procedure and re-check exhaust valve clearances.
26. Remove camshaft sprocket Torx bolts (x2).
27. Remove bearing cap bolts (x10), remove bearing caps (x5), remove intake camshaft. 28. Remove bearing cap bolts (x10), remove bearing caps
(x5), remove exhaust camshaft.
29. Clean EGR tube.
30. Install new gasket, install EGR tube to cylinder head, install and torque tighten Torx screws (x2).
31. Clean Knock sensors (x2).
32. Install knock sensors (x2) to cylinder head, install and torque tighten bolts (x2).
33. Clean camshaft timing sensor.
34. Install camshaft timing sensor, install and torque tighten bolt.
35. Install spark plugs.
36. Install cylinder head gasket RH (see Workshop Manual procedure 03.01.GU Gasket - Cylinder Head - RH -
Renew).
Cylinder Head (Engine Set) - Overhaul
Removal
1. Remove cylinder head gaskets - engine set (see Workshop Manual procedure 03.10.AL Gasket -
Cylinder Head - Engine Set - Renew).
2. Remove Torx screws (x4) securing EGR tubes to cylinder heads, remove tubes.
3. Remove and discard gaskets.
4. Remove bolts (x2) securing camshaft timing sensors to cylinder heads, remove sensors.
5. Remove bolts (x4) securing knock sensors (x4) to cylinder heads, remove sensors.
6. Remove spark plugs from cylinder heads (x8).
7. Remove selective tappet buckets, keep in their fitted order.
8. Position valve spring compressor, compress valve springs.
9. Remove collets, release/remove spring compressor, collect collars and valve springs.
10. Remove valves from cylinder heads.
11. Remove valve stem oil seals.
12. Keep valves and springs in their fitted order.
13. Inspect cylinder head face for warpage, across centre and from corner to corner.
14. Check condition and measure free length of valve springs.
15. Decarbonise combustion chambers and exhaust ports.
16. Use new valves and check valve guide clearances.
Installation
1. Clean cylinder head face and inlet/exhaust manifold faces. Use and air line to completely dry cylinder head
surfaces.
Repair Operation Time (ROT)
ItemCode
Cylinder Head (Engine Set)-Overhaul LHD03.01.GZ
Cylinder Head (Engine Set)-Overhaul RHD03.01.FZ
Engine Structure (03.01)
3-1-20Workshop ManualIssue 4, November 2008
4. Position valve spring compressor, compress valve springs
(see Figure).
Figure 1
5. Remove collets, release/re move spring compressor,
collect collars and valve springs.
6. Inspect cylinder head face for warpage, across centre and from corner to corner.
Installation
1. Clean cylinder head face and inlet/exhaust manifold faces. Use and air line to completely dry cylinder head
surfaces.
2. Install exhaust valve springs and collars.
3. Using valve spring compressor, compress valve spring, install collets.
4. Release/remove spring compressor.
5. Install exhaust selective tappet buckets in their original fitted positions.
6. Lubricate both exhaust camshaft bearings and journals with clean engine oil.
7. Install both exhaust camshafts , install bearing caps (x10),
install bolts (x20).
8. Torque tighten bearing cap bolts in the correct sequence.
9. Install camshaft sprocket Torx bolts in both exhaust camshafts.
10. Rotate exhaust camshafts clockwise, check and log each valve clearance using feeler gauges.
11. Calculate the correct tappet bucket grade.
12. Remove bearing cap bolts (x20), remove bearing caps (x10), remove both exhaust camshafts.
13. Remove tappet buckets, install selected tappet buckets.
14. Install exhaust camshafts, install bearing caps (x10), install bolts (x20).
15. Torque tighten bearing cap bolts in the correct sequence.
16. Rotate both exhaust camshafts clockwise, re-check each valve clearance using feeler gauges.
17. Remove camshaft sprocket Torx bolts (x4). 18. Remove bearing cap bolts (x20), remove bearing caps
(x10), remove both exhaust camshafts.
19. Install spark plugs.
20. Install cylinder head gaskets - engine set (see Workshop Manual procedure 03.10.AL Gasket - Cylinder Head -
Engine Set - Renew).
RH/LH Cylinder Head Gasket - Renew
(with Engine Removed
)
Removal
1. Remove SAI pump and bracket assembly (see Workshop Manual procedure 03.08. EB Pump and Bracket
Assembly - Secondary Ai r Injection - Renew).
2. Disconnect multiplugs (x2) from knock sensors.
3. Disconnect multiplug from camshaft timing sensor.
4. Remove nuts (x8) securing RH/LH exhaust manifold to
cylinder head.
5. Remove exhaust manifold, remove and discard gasket.
6. Remove RH/LH intake camshaft (see Workshop Manual procedure 03.09.BT/03.09.BV Camshaft - Intake - RH/
LH - Renew With Engine Removed).
7. Remove RH exhaust camshaft bearing cap retaining bolts (x10) evenly and in stages (see Figure)
Figure 1
8. Note their orientation and markings and remove the RH/LH exhaust camshaft bearing caps.
A0301310
Repair Operation Time (ROT)
ItemCode
Cylinder Head Gasket-Renew RH03.01.HU
Cylinder Head Gasket-Renew LH03.01.HV
A0309258