8-42
8 4. Install the gasket, and then insert the tailpipe
into the muffler and align the bolt holes.
5. Install the bolts and tighten them to the speci-
fied torque.
6. Remove the purging bolt.7. Start the engine and rev it up approximately
twenty times while momentarily creating ex-
haust system back pressure by blocking the
end of the muffler with a shop towel.
8. Stop the engine and allow the exhaust pipe to
cool.
9. Install the purging bolt and tighten it to the
specified torque.
1. Tailpipe
2. Spark arrester
3. GasketTightening torque:
Tailpipe bolt:
10 Nm (1.0 m·kgf, 7.2 ft·lbf)
1. Purging boltTightening torque:
Purging bolt:
27 Nm (2.7 m·kgf, 19 ft·lbf)
U43P60E0.book Page 42 Tuesday, May 20, 2008 5:33 PM
8-64
8
EBU25701Installing a wheel 1. Place the ATV on a level surface.
2. Install the wheel and the nuts.TIPThe arrow mark on the tire must point toward
the rotating direction of the wheel.Tapered nuts are used for both the front and rear
wheels. Install the nuts with their tapered side to-wards the wheel.
3. Lower the ATV to the ground.
4. Tighten the wheel nuts to the specified
torques.1. Arrow mark
1. Tapered nutTightening torques:
Front wheel nut:
55 Nm (5.5 m·kgf, 40 ft·lbf)
Rear wheel nut:
55 Nm (5.5 m·kgf, 40 ft·lbf)
U43P60E0.book Page 64 Tuesday, May 20, 2008 5:33 PM