21A-27
MANUAL GEARBOX
Manual gearbox: Removal - Refitting
D4F, and JB1 – D7F, and JB1
21A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 411, 02A, Lifting equip-
ment).
aRemove:
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery),
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery).
aRemove the air filter unit (see Air filter unit: Re-
moval - Refitting) (MR 411, 12A, Fuel mixture).
aRemove:
-the scuttle panel grille (see Scuttle panel grille:
Removal - Refitting) (MR 412, 56A, Exterior
equipment),
-the scoop under the scuttle panel grille (see Scoop
under the scuttle panel grille: Removal - Refit-
ting) (MR 412, 56A, Exterior equipment).aDisconnect the engine management computer con-
nectors.
aRemove:
-the engine management computer mounting bolts,
-the engine management computer mounting nuts.
aRemove the engine management computer mount-
ing.
aRemove the engine management computer wiring
harness nut from the engine management computer
mounting.
aRemove the engine management computer wiring
harness.
aRemove the engine management computer mount-
ing fitted with the engine management computer.
aUnclip:
-the clutch cable,
-the gearbox breather.
aRemove:
-the left-hand front wheel (see Wheel: Removal -
Refitting) (MR 411, 35A, Wheels and tyres),
-the front left-hand wheel arch liner (see Front
wheel arch liner: Removal - Refitting) (MR 412,
55A, Exterior protection).
aDrain the gearbox oil (see 21A, Manual gearbox,
Manual gearbox oils: Draining - Filling, page
21A-2) .
aRemove:
-the hub carrier - front left-hand and front right-hand
driveshaft assemblies (see ) (MR 411, 31A, Front
axle components),
-the rear suspended engine mounting (see Lower
engine tie-bar: Removal - Refitting) (MR 411,
19D, Engine mounting),
-the starter (see Starter: Removal - Refitting) (MR
411, 16A, Starting - Charging). Special tooling required
Mot. 1453Engine anchorage support
with m ultiple adjustments and
retaining str aps.
Equipment required
component jack
Tightening torquesm
gearbox mountings44 Nm
D4F
21A-29
MANUAL GEARBOX
Manual gearbox: Removal - Refitting
D4F, and JB1 – D7F, and JB1
21A
aRefit the engine management computer mounting
fitted with the engine management computer.
aFit the engine management computer wiring har-
ness.
aRefit the engine management computer wiring har-
ness nut on the engine management computer
mounting.
aFit the engine management computer mounting.
aRefit:
-the engine management computer mounting bolts,
-the engine management computer mounting nuts.
aConnect the engine management computer connec-
tors.
aRefit:
-the scoop under the scuttle panel grille (see Scoop
under the scuttle panel grille: Removal - Refit-
ting) (MR 412, 56A, Exterior equipment),
-the scuttle panel grille (see Scuttle panel grille:
Removal - Refitting) (MR 412, 56A, Exterior
equipment).
aRefit the air filter box (see Air filter unit: Removal -
Refitting) (MR 411, 12A, Fuel mixture).
aFill up the gearbox oil (see 21A, Manual gearbox,
Manual gearbox oils: Draining - Filling, page
21A-2) .
aRefit:
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery). D4F
21A-30
MANUAL GEARBOX
Manual gearbox: Removal - Refitting
K4M, and JR5
21A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
aRemove:
-the engine undertray,
-the battery (see Battery: Removal - Refitting)
(80A, Battery),
-the air filter unit (see Air filter unit: Removal - Re-
fitting) (12A, Fuel mixture),
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (17B, Petrol in-
jection),
-the battery tray (see Battery tray: Removal - Re-
fitting) (80A, Battery),
-the front wheels (see Wheel: Removal - Refitting)
(35A, Wheels and tyres),
-the front wheel arch liners (see Front wheel arch
liner: Removal - Refitting) (55A, Exterior protec-
tion),
-the front bumper (see Front bumper: Removal -
Refitting) (55A, Exterior protection).
aDrain:
-the gearbox (see 21A, Manual gearbox, Manual
gearbox oils: Draining - Filling, page 21A-2) ,
-the engine cooling system (see Cooling system:
Draining - Refilling) (19A, Cooling),
-the refrigerant circuit (see Refrigerant circuit:
Draining - Filling) (62A, Air conditioning).aRemove:
-the rear suspended engine mounting (see Lower
engine tie-bar: Removal - Refitting) (19D, En-
gine mounting),
-the front axle subframe (see Front axle subframe:
Removal - Refitting) (31A, Front axle compo-
nents),
-the front left-hand driveshaft (see 29A, Drive-
shafts, Front left-hand driveshaft: Removal -
Refitting, page 29A-2) ,
-the front right-hand driveshaft (see 29A, Drive-
shafts, Front right-hand driveshaft: Removal -
Refitting, page 29A-8) ,
-the differential output seals (see 21A, Manual
gearbox, Differential output seal: Removal - Re-
fitting, page 21A-38) (21A, Manual gearbox),
-the engine - gearbox assembly (see Engine -
gearbox assembly: Removal - Refitting) (10A,
Engine and peripherals).
II - OPERATION FOR REMOVAL OF PART
CONCERNED
aRemove the “engine - gearbox” assembly from
theusing a workshop hoist.
aDisconnect the TDC sensor connector (1) . Equipment required
workshop hoist
Tightening torquesm
manual gearbox nuts
and bolts44 N.m
earth strap bolt on the
gearbox44 N.m
support bolts for the
suspended engine
mounting on the gear-
box62 N.m
132319
21A-33
MANUAL GEARBOX
Manual gearbox: Removal - Refitting
K4M, and JR5
21A
aFit the engine wiring.
aRefit:
-the starter (see Starter: Removal - Refitting)
(16A, Starting - Charging),
-the bolts of the engine wiring channel,
-the earth strap bolt on the gearbox.
aTorque tighten the earth strap bolt on the gearbox
(44 N.m).
aConnect the reverse gear switch connector.
aClip on the reverse gear switch.
aRefit the suspended engine mounting support on the
gearbox.
aTorque tighten the support bolts for the suspend-
ed engine mounting on the gearbox (62 N.m).
aConnect the TDC sensor connector.
aRefit the engine - gearbox assembly on the.
III - FINAL OPERATION
aRefit:
-the engine - gearbox assembly (see Engine -
gearbox assembly: Removal - Refitting) (10A,
Engine and peripherals),
-the differential output seals (see 21A, Manual
gearbox, Differential output seal: Removal - Re-
fitting, page 21A-38) (21A, Manual gearbox),
-the front right-hand driveshaft (see 29A, Drive-
shafts, Front right-hand driveshaft: Removal -
Refitting, page 29A-8) .
-the front left-hand driveshaft (see 29A, Drive-
shafts, Front left-hand driveshaft: Removal -
Refitting, page 29A-2) ,
-the front axle subframe (see Front axle subframe:
Removal - Refitting) (31A, Front axle compo-
nents),
-the rear suspended engine mounting (see Lower
engine tie-bar: Removal - Refitting) (19D, En-
gine mounting),
-the front bumper (see Front bumper: Removal -
Refitting) (55A, Exterior protection).
-the front wheel arch liners (see Front wheel arch
liner: Removal - Refitting) (55A, Exterior protec-
tion),
-the front wheels (see Wheel: Removal - Refitting)
(35A, Wheels and tyres),
-the battery tray (see Battery tray: Removal - Re-
fitting) (80A, Battery),-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (17B, Petrol in-
jection),
-the air filter unit (see Air filter unit: Removal - Re-
fitting) (12A, Fuel mixture),
-the battery (see Battery: Removal - Refitting)
(80A, Battery).
aRefill:
-the engine cooling system (see Cooling system:
Draining - Refilling) (19A, Cooling),
-the gearbox (see 21A, Manual gearbox, Manual
gearbox oils: Draining - Filling, page 21A-2) ,
-the refrigerant circuit (see Refrigerant circuit:
Draining - Filling) (62A, Air conditioning).
aRefit the engine undertray.
21A-41
MANUAL GEARBOX
Input shaft lip seal: Removal - Refitting
JB1
21A
Detailed view of the Bvi tool components. 1445
aThe gearbox must be removed.
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 411, 02A, Lifting equip-
ment).
aDisconnect the battery (see Battery: Removal - Re-
fitting) (MR 411, 80A, Battery).aRemove the gearbox (see 21A, Manual gearbox,
Manual gearbox: Removal - Refitting, page 21A-
24) .
II - OPERATION FOR REMOVAL OF PART
CONCERNED
aPosition the gearbox on the mounting (1) adjusting
the adjustable support (2) .
aGently remove the guide tube with a press using the
(Bvi. 1828).
aDegrease the guide tube. Special tooling required
Bvi. 1828Snap r ivet and pressure plate
for removal and refitting of the
guide tube (JH1 gearbo x)
Note:
The lip seal and the primary shaft bearing are built
into the thr ust pad guide tube.
It is lubricated via an aperture into the housing
bore.
99057
(1) tightening clamp
(2) sleeve
(3) Sender
(4) key
(5) split ring
98934
98936
21A-42
MANUAL GEARBOX
Input shaft lip seal: Removal - Refitting
JB1
21A
aPlace the tightening clamp (3) onto the tube.
aLock the tightening clamp using the spanner (4) .
aTighten the nut firmly (5) .
aPosition the sleeve (6) and the split ring (7) .
aTurn the upper nut (8) .
aGently extract the guide tube.
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
aPosition the new guide tube on the clutch housing.
aGently remove the guide tube with a press and the
(Bvi. 1828).
II - FINAL OPERATION.
aRefit the gearbox (see 21A, Manual gearbox, Man-
ual gearbox: Removal - Refitting, page 21A-24)
(MR 411, 21A, Manual gearbox).
aConnect the battery (see Battery: Removal - Refit-
ting) (MR 411, 80A, Battery).
98937
98938
98939
98935-1
21B-5
SEQUENTIAL GEARBOX
Pressure accumulator: Removal - Refitting
D4F, and JH1
21B
REMOVAL
I - REMOVAL PREPARATION OPERATION
aRemove:
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection).
aDetach from the petrol injection computer mounting:
-the cooling hose,
-the sequential gearbox computer wiring harness,
-the petrol injection computer wiring harness,
-the battery wiring harness.aRemove:
-the petrol injection computer mounting nut (1) ,
-the engine wiring harness nut (2) from the petrol in-
jection computer mounting,
-the petrol injection computer mounting bolts (3) .
aRemove the engine wiring harness from the petrol
injection computer mounting.
aRemove the petrol injection computer mounting. Special tooling required
Mot. 445Oil filter strap wrench.
Equipment required
Diagnostic tool
IMPORTANT
Before carrying out any operation on the sequential
system, discharge the accumulator using the diag-
nostic tool.
IMPORTANT
Consult the safety and cleanliness advice and oper-
ation recommendations before carrying out any
repair (see 21B, Sequential gearbox, Sequential
gearbox: Precautions for the repair, page 21B-1)
.
Note:
To discharge the accumulator and deactivate the
pump assembly pump, (see Fault finding -
Replacement of components) (MR 413, 21B,
Sequential gearbox).
122323
122322
21B-7
SEQUENTIAL GEARBOX
Pressure accumulator: Removal - Refitting
D4F, and JH1
21B
II - OPERATION FOR REMOVAL OF PART
CONCERNED
a
aRemove the pressure accumulator (8) from the actu-
ator module using the (Mot. 445) (9) .
REFITTING
I - REFITTING PREPARATION OPERATION
aIf replacing the pressure accumulator, affix a safety
label to the accumulator.
aIt is essential to replace the pressure accumulator
seal.
II - REFITTING OPERATION FOR PART
CONCERNED
aRefit the pressure accumulator onto the actuator
module using the (Mot. 445).
III - FINAL OPERATION
aClip the pump assembly supply connector onto the
electro-hydraulic unit connector mounting.
aConnect the pump assembly supply connector.aRefit:
-the sequential gearbox lifting eye on the sequential
gearbox,
-the sequential gearbox lifting eye nut,
-the breather pipe on the sequential gearbox.
aAttach the breather pipe:
-to the cooling hose,
-to the sequential gearbox lifting eye.
aFit:
-the petrol injection computer support,
-the engine wiring harness on the petrol injection
computer mounting.
aRefit:
-the petrol injection computer mounting bolts,
-the engine wiring harness nut on the petrol injec-
tion computer mounting,
-the petrol injection computer mounting nut.
aClip onto the petrol injection computer mounting:
-the battery wiring harness,
-the petrol injection computer wiring harness,
-the sequential gearbox computer wiring harness,
-the cooling hose.
aRefit:
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection),
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery).
aFill the electric pump assembly reservoir with oil
(see Sequential gearbox oil: Specifications)
(Technical Note 6012, 04A, Lubricants) to between
32 and 38 mm above the MIN mark.
122315
Note:
Prepare for oil to flow out of the electro-hydraulic
unit.
WARNING
After the accumulator has been fully filled (15
seconds after the ignition has been switched on):
the oil level is at the MINIMUM mark.