2009 RENAULT TWINGO RS torque

[x] Cancel search: torque

Page 537 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 19A-27
COOLING
Coolant pump: Removal - Refitting
K9K
19A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).

Page 539 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 19A-29
COOLING
Coolant pump: Removal - Refitting
K9K
19A
aTighten to torque and in order the coolant pump
bolts (10 N.m).
III - FINAL OPERATION
aRefit:
-the inner timing cover,
-the inner timing cover

Page 540 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 19A-30
COOLING
Coolant pump: Removal - Refitting
K4M
19A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).

Page 542 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 19A-32
COOLING
Coolant pump: Removal - Refitting
K4M
19A
a
aApply a bead (2) of SEALING RESIN  (see Vehicle:
Parts and consumables for the repair) (04B, Con-
sumables - Products) with a width of 0.6 t

Page 550 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 19A-40
COOLING
Water chamber: Removal - Refitting
D4F, and 772 – D7F
19A
PARTS AND CONSUMABLES FOR THE 
REPAIR WORK
aPart always to be replaced:
-water chamber seal.
REMOVAL
I - REMOVAL PREPARATION

Page 552 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 19A-42
COOLING
Water chamber: Removal - Refitting
K9K
19A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).

Page 555 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 19A-45
COOLING
Water chamber: Removal - Refitting
K9K
19A
II -  REFITTING OPERATION FOR PART 
CONCERNED
aRefit the thermostat to the water chamber.
aRefit:
-a new water chamber seal,
-the water chambe

Page 556 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 19A-46
COOLING
Water chamber: Removal - Refitting
D4F, and 780 or 782
19A
REMOVAL - REFITTING
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and liftin