17B-137V7 MR-413-X44-17B000$133.mif
PETROL INJECTION
Fault finding – Interpretation of faults17B
SIM 32 Injection
Program no.: D3
Vdiag No.: 44, 4C, 50
and 54
DF361
CONTINUED 1
For NEW TWINGO or E33:
–Check the condition of the fuel pump relay connector (component code 236).
If the connectors are faulty and if there is a repair procedure (see Technical Note 6015A, Repairing electrical
wiring, Wiring: Precautions for repair), repair the connector, otherwise replace the wiring.
Use the "universal bornier" to check the insulation and continuity of the following connection:
●3N between components 236 and 108,
If the connection or connections are faulty and there is a repair procedure (see Technical Note 6015A, Electrical
wiring repair, Wiring: Precautions for repair), repair the wiring, otherwise replace it.
Carry out a fault finding procedure on the engine fuse and relay box to check the continuity of the following
connection:
●BP17 between components 120 and 597,
●BP17 between components 238 and 597.
If the connection is faulty and if there is a repair procedure (see Technical Note 6015A, Electrical wiring repair,
Wiring: Precautions for repair), repair the wiring, otherwise replace it.
If the fault is still present, check the battery and run fault finding on the charging circuit (see Technical Note 6014A,
Checking the charging circuit).
–Clean the battery terminals and all connections to + and to Earth.
–Check the battery voltage.
–Check the charging circuit.
AFTER REPAIRFollow the instructions to confirm repair:
–If the fault is present, continue to deal with the fault.
–If the fault is stored, ignore it.
Deal with any other faults.
Clear the stored faults.
17B-138V7 MR-413-X44-17B000$133.mif
PETROL INJECTION
Fault finding – Interpretation of faults17B
SIM 32 Injection
Program no.: D3
Vdiag No.: 44, 4C, 50
and 54
DF361
CONTINUED 2
For CLIO III or MODUS:
–In the Protection and Switching Unit, disconnect the connector marked MN.
–Check the condition of the Protection and Switching Unit connector (component code 1337).
If the connectors are faulty and if there is a repair procedure (see Technical Note 6015A, Repairing electrical
wiring, Wiring: Precautions for repair), repair the connector, otherwise replace the wiring.
Use the "Universal bornier" to check the insulation and continuity of the following connection:
●3N between components 1337 and 108.
If the connection or connections are faulty and there is a repair procedure (see Technical Note 6015A, Electrical
wiring repair, Wiring: Precautions for repair), repair the wiring, otherwise replace it.
Reconnect the Protection and Switching Unit connector and reconnect the battery.
With the ignition on, if there is no + 12 V on the connector of the quadruple ignition coil module, there is a fault in
the Protection and Switching Unit (see 87G, Engine Compartment Connection Unit).
If the fault is still present, replace the ignition quadruple coil module.
If not, contact the Techline.
AFTER REPAIRFollow the instructions to confirm repair:
–If the fault is present, continue to deal with the fault.
–If the fault is stored, ignore it.
Deal with any other faults.
Clear the stored faults.