SPEC
2 - 13 Swingarm:
Swingarm free play limit
End ---- 1.0 mm (0.04 in)
Wheel:
Front wheel type Spoke wheel ----
Rear wheel type Spoke wheel ----
Front rim size/material 21 × 1.60/Aluminum ----
Rear rim size/material 19 × 1.85/Aluminum ----
Rim runout limit:
Radial ---- 2.0 mm (0.08 in)
Lateral ---- 2.0 mm (0.08 in)
Drive chain:
Type/manufacturer DID520DMA2 SDH/DAIDO ----
Number of links 111 links + joint ----
Chain slack 48 ~ 58 mm (1.9 ~ 2.3 in) ----
Chain length (15 links) ---- 242.9 mm
(9.563 in)
Front disc brake:
Disc outside dia. × Thickness 250 × 3.0 mm (9.84 × 0.12 in) 250 × 2.5 mm
(9.84 × 0.10 in)
Pad thickness 4.4 mm (0.17 in) 1.0 mm (0.04 in)
Master cylinder inside dia. 9.5 mm (0.374 in) ----
Caliper cylinder inside dia. 27.0 mm (1.063 in) × 2 ----
Brake fluid type DOT #4 ----
Rear disc brake:
Disc outside dia. × Thickness 245 × 4.0 mm (9.65 × 0.16 in) 245 × 3.5 mm
(9.65 × 0.14 in)
Deflection limit ---- 0.15 mm (0.006 in)
Pad thickness 6.4 mm (0.25 in) 1.0 mm (0.04 in)
Master cylinder inside dia. 11.0 mm (0.433 in) ----
Caliper cylinder inside dia. 25.4 mm (1.000 in) × 1 ----
Brake fluid type DOT #4 ----
Brake lever and brake pedal:
Brake lever position 95 mm (3.74 in) ----
Brake pedal height
(vertical height above footrest top)5 mm (0.20 in) ----
Clutch lever free play (lever end) 8 ~ 13 mm (0.31 ~ 0.51 in) ----
Throttle grip free play 3 ~ 5 mm (0.12 ~ 0.20 in) ----Item Standard Limit
MAINTENANCE SPECIFICATIONS
SPEC
2 - 14
NOTE:
1. First, tighten the steering ring nut approximately 38 Nm (3.8 m kg, 27 ft lb) by using the steer-
ing nut wrench, then loosen the steering ring nut one turn.
2. Retighten the steering ring nut 7 Nm (0.7 m kg, 5.1 ft lb). Part to be tightened Thread size Q’tyTightening torque
Nm m·kg ft·lb
Upper bracket and outer tube M8 × 1.25 4 21 2.1 15
Lower bracket and outer tube M8 × 1.25 4 21 2.1 15
Upper bracket and steering stem M24 × 1.0 1 145 14.5 105
Handlebar upper holder and handlebar lower
holderM8 × 1.25 4 28 2.8 20
Handlebar lower holder and upper bracket M10 × 1.25 2 34 3.4 25
Steering stem and steering ring nut M28 × 1.0 1 Refer to NOTE.
Front fork and damper assembly M51 × 1.5 2 30 3.0 22
Front fork and adjuster M22 × 1.25 2 55 5.5 40
Damper assembly and base valve M42 × 1.5 2 29 2.9 21
Adjuster and damper assembly M12 × 1.25 2 29 2.9 21
Front fork bleed screw and base valve M5 × 0.8 2 1 0.1 0.7
Front fork and front fork protector M6 × 1.0 6 7 0.7 5.1
Lower bracket and brake hose guide M6 × 1.0 1 4 0.4 2.9
Front fork protector and brake hose holder M6 × 1.0 2 7 0.7 5.1
Throttle grip cap M5 × 0.8 2 4 0.4 2.9
Front brake master cylinder M6 × 1.0 2 9 0.9 6.5
Brake lever mounting bolt M6 × 1.0 1 6 0.6 4.3
Brake lever mounting nut M6 × 1.0 1 6 0.6 4.3
Brake lever position locknut M6 × 1.0 1 5 0.5 3.6
Clutch lever holder M5 × 0.8 2 4 0.4 2.9
Clutch lever mounting nut M6 × 1.0 1 4 0.4 2.9
Hot starter lever holder M5 × 0.8 2 4 0.4 2.9
Front brake master cylinder cap M4 × 0.7 2 2 0.2 1.4
Front brake hose union bolt M10 × 1.25 2 30 3.0 22
Front brake caliper M8 × 1.25 2 23 2.3 17
Pad pin plug M10 × 1.0 2 3 0.3 2.2
Front brake caliper and pad pin M10 × 1.0 1 18 1.8 13
Rear brake caliper and pad pin M10 × 1.0 1 18 1.8 13
Brake caliper and bleed screw M8 × 1.25 2 6 0.6 4.3
Front wheel axle and axle nut M16 × 1.5 1 105 10.5 75
Front wheel axle holder M8 × 1.25 4 21 2.1 15
Front brake disc M6 × 1.0 6 12 1.2 8.7
Rear brake disc M6 × 1.0 6 14 1.4 10
Footrest bracket and frame M10 × 1.25 4 55 5.5 40
Brake pedal M8 × 1.25 1 26 2.6 19
Rear brake master cylinder M6 × 1.0 2 10 1.0 7.2
Rear brake master cylinder cap M4 × 0.7 2 2 0.2 1.4
Rear brake hose union bolt M10 × 1.25 2 30 3.0 22
Rear wheel axle and axle nut M20 × 1.5 1 125 12.5 90
MAINTENANCE SPECIFICATIONS
SPEC
2 - 15
NOTE:
- marked portion shall be checked for torque tightening after break-in or before each race.Part to be tightened Thread size Q’tyTightening torque
Nm m·kg ft·lb
Nipple (spoke)—72 3 0.3 2.2
Rear wheel sprocket M8 × 1.25 6 42 4.2 30
Rear brake disc cover M6 × 1.0 2 10 1.0 7.2
Rear brake caliper protector M6 × 1.0 2 7 0.7 5.1
Drive chain puller adjust bolt and locknut M8 × 1.25 2 19 1.9 12
Engine mounting:
Engine and engine bracket (front) M10 × 1.25 1 53 5.3 38
Engine and frame (lower) M10 × 1.25 1 53 5.3 38
Upper engine bracket and frame M8 × 1.25 4 34 3.4 25
Lower engine bracket and frame M8 × 1.25 4 38 3.8 27
Engine and engine bracket (upper) M10 × 1.25 1 55 5.5 40
Lower engine guard M6 × 1.0 3 10 1.0 7.2
Right engine guard M6 × 1.0 1 10 1.0 7.2
CDI unit bracket M6 × 1.0 2 7 0.7 5.1
Cable guide and CDI unit bracket M5 × 0.8 2 4 0.4 2.9
Cable guide and frame M5 × 0.8 1 5 0.5 3.6
Pivot shaft and nut M16 × 1.5 1 85 8.5 61
Relay arm and swingarm M14 × 1.5 1 70 7.0 50
Relay arm and connecting rod M14 × 1.5 1 80 8.0 58
Connecting rod and frame M14 × 1.5 1 80 8.0 58
Rear shock absorber and frame M10 × 1.25 1 56 5.6 40
Rear shock absorber and relay arm M10 × 1.25 1 53 5.3 38
Rear frame (upper) M8 × 1.25 1 32 3.2 23
Rear frame (lower) M8 × 1.25 2 32 3.2 23
Swingarm and brake hose holder M5 × 0.8 4 2 0.2 1.4
Swingarm and patch M4 × 0.7 4 2 0.2 1.4
Upper drive chain tensioner M8 × 1.25 1 16 1.6 11
Lower drive chain tensioner M8 × 1.25 1 16 1.6 11
Drive chain support M6 × 1.0 3 7 0.7 5.1
Seal guard and swingarm M5 × 0.8 4 6 0.6 4.3
Fuel tank mounting boss and frame M10 × 1.25 1 20 2.0 14
Fuel tank M6 × 1.0 2 9 0.9 6.5
Fuel cock M6 × 1.0 2 4 0.4 2.9
Seat set bracket and fuel tank M6 × 1.0 1 7 0.7 5.1
Fuel tank bracket and fuel tank M6 × 1.0 4 7 0.7 5.1
Air scoop and fuel tank M6 × 1.0 6 7 0.7 5.1
Air scoop and radiator guard (lower) M6 × 1.0 2 7 0.7 5.1
Front fender M6 × 1.0 4 7 0.7 5.1
Rear fender (front) M6 × 1.0 2 7 0.7 5.1
Rear fender (rear) M6 × 1.0 2 16 1.6 11
Side cover M6 × 1.0 2 7 0.7 5.1
Seat M8 × 1.25 2 23 2.3 17
Number plate M6 × 1.0 1 7 0.7 5.1
MAINTENANCE SPECIFICATIONS
3 - 3
INSP
ADJ
MAINTENANCE INTERVALS
FRONT FORK OIL SEAL AND DUST
SEAL
Clean and lube Lithium base grease
PROTECTOR GUIDE
Replace
REAR SHOCK ABSORBER
(After
rain ride)
Inspect and adjust
Lube
Molybdenum disulfide
grease
Replace spring seat Every one year
Retighten
DRIVE CHAIN GUIDE AND ROLLERS
Inspect
SWINGARM
Molybdenum disulfide
grease
Inspect, lube and retighten
RELAY ARM, CONNECTING ROD
Molybdenum disulfide
grease
Inspect, lube and retighten
STEERING HEAD
Inspect free play and retighten
Clean and lube Lithium base grease
Replace bearing
TIRE, WHEELS
Inspect air pressure, wheel run-out,
tire wear and spoke looseness
Retighten sprocket bolt
Inspect bearings
Replace bearings
Lubricate Lithium base grease
THROTTLE, CONTROL CABLE Yamaha cable lube or
SAE 10W-30 motor oil
Inspect dirt and wear on
the throttle cable on the
carburetor side. Check routing and connection
Lubricate
Inspect and clean (throttle cable)
HOT STARTER, CLUTCH LEVER
Inspect free playItemAfter
break-inEvery
race
Every
third
(or
500 km)Every
fifth
(or
1,000 km)As re-
quiredRemarks
3 - 4
INSP
ADJ
PRE-OPERATION INSPECTION AND MAINTENANCE
EC320000
PRE-OPERATION INSPECTION AND MAINTENANCE
Before riding for break-in operation, practice or a race, make sure the machine is in good operating
condition.
Before using this machine, check the following points.
GENERAL INSPECTION AND MAINTENANCE
Item Routine Page
CoolantCheck that coolant is filled up to the radiator cap.
Check the cooling system for leakage.P.3-5 ~ 9
FuelCheck that a fresh gasoline is filled in the fuel tank. Check the
fuel line for leakage.P.1-13
Engine oilCheck that the oil level is correct. Check the crankcase and oil
line for leakage.P.3-13 ~ 17
Gear shifter and clutchCheck that gears can be shifted correctly in order and that the
clutch operates smoothly.P.3-9 ~ 10
Throttle grip/HousingCheck that the throttle grip operation and free play are correctly
adjusted. Lubricate the throttle grip and housing, if necessary.P.3-10 ~ 11
Brakes Check the play of front brake and effect of front and rear brake. P.3-23 ~ 29
Drive chainCheck drive chain slack and alignment. Check that the drive
chain is lubricated properly.P.3-30 ~ 32
WheelsCheck for excessive wear and tire pressure. Check for loose
spokes and have no excessive play.P.3-40 ~ 41
SteeringCheck that the handlebar can be turned smoothly and have no
excessive play.P.3-41 ~ 43
Front forks and rear shock
absorberCheck that they operate smoothly and there is no oil leakage. P.3-32 ~ 39
Cables (wires)Check that the clutch and throttle cables move smoothly. Check
that they are not caught when the handlebars are turned or
when the front forks travel up and down.—
Exhaust pipeCheck that the exhaust pipe is tightly mounted and has no
cracks.P.4-3 ~ 5
Rear wheel sprocket Check that the rear wheel sprocket tightening bolt is not loose. P.3-30
Lubrication Check for smooth operation. Lubricate if necessary. P.3-44
Bolts and nuts Check the chassis and engine for loose bolts and nuts. P.1-18
Lead connectorsCheck that the CDI magneto, CDI unit, and ignition coil are con-
nected tightly.P.1-6
SettingsIs the machine set suitably for the condition of the racing course
and weather or by taking into account the results of test runs
before racing? Are inspection and maintenance completely
done?P.7-1 ~ 21
3 - 27
INSP
ADJ
REAR BRAKE PAD INSPECTION AND REPLACEMENT
3. Inspect:
Brake fluid level
Refer to “BRAKE FLUID LEVEL INSPEC-
TION” section. Install the pad pin plug 0.
T R..
Pad pin plug:
3 Nm (0.3 m kg, 2.2 ft lb)
4. Check:
Brake lever operation
A softy or spongy feeling → Bleed brake
system.
Refer to “BRAKE SYSTEM AIR BLEED-
ING” section.
REAR BRAKE PAD INSPECTION AND
REPLACEMENT
1. Inspect:
Brake pad thickness a
Out of specification → Replace as a set.
Brake pad thickness:
6.4 mm (0.25 in)
2. Replace:
Brake pad
Brake pad replacement steps:
Remove the protector 1 and pad pin plug
2.
Loosen the pad pin 3.
Remove the rear wheel 4 and brake cali-
per 5.
Refer to “FRONT WHEEL AND REAR
WHEEL” section in the CHAPTER 5.
3 - 28
INSP
ADJ
REAR BRAKE PAD INSPECTION AND REPLACEMENT
Remove the pad pin 6 and brake pads 7.
Connect the transparent hose 8 to the
bleed screw 9 and place the suitable con-
tainer under its end.
Loosen the bleed screw and push the
brake caliper piston in.
CAUTION:
Do not reuse the drained brake fluid.
Tighten the bleed screw.
T R..
Bleed screw:
6 Nm (0.6 m kg, 4.3 ft lb)
Install the brake pad 0 and pad pin A.
NOTE:
Install the brake pads with their projections
a into the brake caliper recesses b.
Temporarily tighten the pad pin at this
point.
Install the brake caliper B and rear wheel
C.
Refer to “FRONT WHEEL AND REAR
WHEEL” section in the CHAPTER 5.
Tighten the pad pin D.
T R..
Pad pin:
18 Nm (1.8 m kg, 13 ft lb)
Install the pad pin plug E and protector
F.
T R..
Pad pin plug:
3 Nm (0.3 m kg, 2.2 ft lb)
Bolt (protector):
7 Nm (0.7 m kg, 5.1 ft lb)
3 - 30
INSP
ADJ
SPROCKETS INSPECTION/DRIVE CHAIN INSPECTION
SPROCKETS INSPECTION
1. Inspect:
Sprocket teeth a
Excessive wear → Replace.
NOTE:
Replace the drive sprocket, rear wheel
sprocket and drive chain as a set.
DRIVE CHAIN INSPECTION
1. Measure:
Drive chain length (15 links) a
Out of specification → Replace.
NOTE:
While measuring the drive chain length, push
down on the drive chain to increase its ten-
sion.
Measure the length between drive chain
roller 1 and F as shown.
Perform this measurement at two or three
different places.
Drive chain length (15 links):
2. Remove:
Master link clip
Joint 1
Drive chain 2
3. Clean:
Drive chain
Place it in kerosene, and brush off as
much dirt as possible. Then remove the
drive chain from the kerosene and dry the
drive chain.