PRE-DELIVERY INSPECTION REPORT
10-34
C. ELECTRICAL
a. Ignition Switch Operation
b. Left Hand Switch Operation & Pass Beam
• Horn
• Indicator• Head Light
c. All Bulbs - Functioningd. Battery
• Electrolyte Level
• Specific Gravity• Routing of Breather Pipe• Fuse• Routing of Positive Wire (Red) Below Breather Pipe
D. ROAD TEST
a. Starting
b. Gear Shifting Operationc. Clutch Operationd. Application of Brakes (Front and Rear)e. Speedo/ Odo Meter OperationEXPLAINED BY:SIGNATURE :NAME :
MAIN SELLING DLR'S STAMP, SIGN & CODE
CUSTOMER’S SIGNATURE:
SERVICE2.pmd10/15/2006, 8:54 AM 4