PRE-DELIVERY INSPECTION REPORT10-4
C. ELECTRICAL
a. Ignition Switch Operation
b. Left Hand Switch Operation & Pass Beam
• Horn
• Indicator• Head Light
c. All Bulbs - Functioningd. Battery
• Electrolyte Level
• Specific Gravity• Routing of Breather Pipe• Fuse• Routing of Positive Wire (Red) Below Breather Pipe
D. ROAD TEST
a. Starting
b. Gear Shifting Operationc. Clutch Operationd. Application of Brakes (Front and Rear)e. Speedo/ Odo Meter Operationf. Fuel gauge OperationEXPLAINED BYSIGNATURE: _____________ NAME:
CUSTOMER’S SIGN
MAIN SELLING DLR’S STAMP, SIGNATURE
service2.pmd11/3/2006, 8:50 PM 4
10-5
1. Operation of all the locks (Ignition, Steering, Fuel Tank Cap, Side Cover L.H.).
2. Fuel Cock Lever Operation and its reserve position; Fuel Tank Capacity including reserve & Fuel
Gauge.
3. Operation and function of Starter Lever.
4. Operation of Kick Lever.
5. Operation of Throttle.
6. Operation of Handle Bar Switches, their Functions and Pass Beam.
7. Disadvantages of riding on half Clutch (Never ride with clutch pressed).
8. Gear shifting pattern.
9. Tyre inflation pressure :Front - 25 Psi Rear - 33 Psi (Solo), 36 Psi (Double)
10. Never give sudden acceleration; always accelerate gradually
11. Simultaneous use of Front and Rear Brakes.
12. Never ride with your foot on Rear brake Pedal.
13. Whenever parking the Motorcycle on the Side Stand, ensure that the Fuel Cock Lever is in closed
position.
14. Always adjust both the right and left Shock Absorbers to the same position.INSTALLATIONProcedures to be explained to the customer on delivery of the Motorcycle by the Dealer's
Representative.
service2.pmd11/3/2006, 8:50 PM 5