PRE-DELIVERY INSPECTION REPORT
f. Wheels
Tyre :Tyre pressure Solo Double
(PSI)
Front 25 25
Rear 33 36
R i m : Runout - Radial - 1.5 mm (Max)
- Lateral - 1.5 mm (Max)
Spokes : No loosenes
g. Locks Operation : • Ignition
• Steering• Fuel Tank Cap• Side Cover (L.H.)
h. FastenersSpecified Torque
(Ft-Lb)
1. Front Wheel Axle Nuts 25-40
2. Front Fork (Crown Handle & Inner Tube)13-202. Front Fork under Bracket Stem Nut18-223. Handle Bar Mounting Bolts 13-204. Rear Shock Absorber Mounting Bolts22-355. Rear Swing Arm Pivot Shaft Nut32-526. Rear Wheel Axle/Sprocket. Shaft Nuts60-70
B. ENGINE
a. Engine Oil : • Oil Level (For checking - Refer Pg. 6-9)
• Check for any Leakages
10-2
service2.pmd11/3/2006, 8:50 PM 2
10-5
1. Operation of all the locks (Ignition, Steering, Fuel Tank Cap, Side Cover L.H.).
2. Fuel Cock Lever Operation and its reserve position; Fuel Tank Capacity including reserve & Fuel
Gauge.
3. Operation and function of Starter Lever.
4. Operation of Kick Lever.
5. Operation of Throttle.
6. Operation of Handle Bar Switches, their Functions and Pass Beam.
7. Disadvantages of riding on half Clutch (Never ride with clutch pressed).
8. Gear shifting pattern.
9. Tyre inflation pressure :Front - 25 Psi Rear - 33 Psi (Solo), 36 Psi (Double)
10. Never give sudden acceleration; always accelerate gradually
11. Simultaneous use of Front and Rear Brakes.
12. Never ride with your foot on Rear brake Pedal.
13. Whenever parking the Motorcycle on the Side Stand, ensure that the Fuel Cock Lever is in closed
position.
14. Always adjust both the right and left Shock Absorbers to the same position.INSTALLATIONProcedures to be explained to the customer on delivery of the Motorcycle by the Dealer's
Representative.
service2.pmd11/3/2006, 8:50 PM 5