TERMINOLOGY
GI-51
C
D
E
F
G
H
I
J
K
L
MB
GI
Revision: June 20062007 Versa
TERMINOLOGYPFP:00011
SAE J1930 Terminology List EAS00207
All emission related terms used in this publication in accordance with SAE J1930 are listed. Accordingly, new
terms, new acronyms/abbreviations and old terms are listed in the following chart.
NEW TERMNEW ACRONYM /
ABBREVIATIONOLD TERM
Air cleaner ACL Air cleaner
Barometric pressure BARO ***
Barometric pressure sensor-BCDD BAROS-BCDD BCDD
Camshaft position CMP ***
Camshaft position sensor CMPS Crank angle sensor
Canister *** Canister
Carburetor CARB Carburetor
Charge air cooler CAC Intercooler
Closed loop CL Closed loop
Closed throttle position switch CTP switch Idle switch
Clutch pedal position switch CPP switch Clutch switch
Continuous fuel injection system CFI system ***
Continuous trap oxidizer system CTOX system ***
Crankshaft position CKP ***
Crankshaft position sensor CKPS ***
Data link connector DLC ***
Data link connector for CONSULT-II DLC for CONSULT-II Diagnostic connector for CONSULT-II
Diagnostic test mode DTM Diagnostic mode
Diagnostic test mode selector DTM selector Diagnostic mode selector
Diagnostic test mode I DTM I Mode I
Diagnostic test mode II DTM II Mode II
Diagnostic trouble code DTC Malfunction code
Direct fuel injection system DFI system ***
Distributor ignition system DI system Ignition timing control
Early fuel evaporation-mixture heater EFE-mixture heater Mixture heater
Early fuel evaporation system EFE system Mixture heater control
Electrically erasable programmable read
only memoryEEPROM ***
Electronic ignition system EI system Ignition timing control
Engine control EC ***
Engine control module ECM ECCS control unit
Engine coolant temperature ECT Engine temperature
Engine coolant temperature sensor ECTS Engine temperature sensor
Engine modification EM ***
Engine speed RPM Engine speed
Erasable programmable read only memory EPROM ***
Evaporative emission canister EVAP canister Canister
Evaporative emission system EVAP system Canister control solenoid valve
Exhaust gas recirculation valve EGR valve EGR valve
IDX-2
ALPHABETICAL INDEX
A
A/C air flow ..................................................... MTC-22
A/C component layout .................................... MTC-17
A/C compressor mounting .............................. MTC-84
A/C compressor precaution .............................. MTC-8
A/C compressor special service tool ............... MTC-12
A/C control operation (manual A/C) ................ MTC-21
A/C controller .................................................. MTC-61
A/C evaporator ................................................ MTC-90
A/C HFC134a (R134a) system precaution ....... MTC-4
A/C HFC134a (R134a) system service procedure .......
MTC-80
A/C HFC134a (R134a) system service tools .. MTC-12
A/C HFC134a system service equipment precaution ...
MTC-9
A/C lubricant (R134a) ........................ MTC-5, MTC-18
A/C lubrication oil ............................................ MTC-96
A/C operational check ..................................... MTC-33
A/C service data specification ......................... MTC-96
A/C trouble diagnoses (manual A/C) .............. MTC-24
A/C unit assembly ........................................... MTC-64
A/C, M - Wiring diagram ................................. MTC-29
A/F - Wiring diagram ... EC-223, EC-229, EC-235, EC-
242, EC-542
A/FH - Wiring diagram ..................................... EC-162
A/T fluid checking .................................. AT-16, MA-22
A/T fluid replacement ............................. AT-17, MA-23
A/T fluid temperature sensor ........................... AT-106
A/T IND - Wiring diagram .................................... DI-38
A/T indicator ........................................................ DI-37
A/T shift control system ................................... AT-229
A/T shift lock system ........................................ AT-235
A/T shift lock system - Wiring diagram ............ AT-236
A/T trouble diagnoses ........................................ AT-43
ABS - Wiring diagram ..................................... BRC-13
ABS (anti-lock brake system) ........................... BRC-5
ABS sensor rotor .............................................. RAX-4
Accelerator pedal position (APP) sensor . EC-513, EC-
519, EC-532
Accelerator pedal released position learning ..... EC-77
Air bag .............................................................. SRS-3
Air bleeding (hydraulic clutch) .............................. CL-8
Air cleaner filter replacement ............................ MA-16
Air conditioner cut control .................................. EC-27
Air fuel ratio sensor 1 .. EC-220, EC-227, EC-233, EC-
239, EC-540
Air fuel ratio sensor 1 heater ............................ EC-161
Air mix door control linkage adjustment .......... MTC-70
Angular tightening application ............................. EM-4
Anti-lock brake system - See ABS .................... BRC-5
Anti-lock brake system - Wiring diagram ........ BRC-13
APPS1 - Wiring diagram .................................. EC-515
APPS2 - Wiring diagram .................................. EC-521
APPS3 - Wiring diagram .................................. EC-534
ASC/BS - Wiring diagram ................................ EC-475
ASC/SW - Wiring diagram ............................... EC-468
ASCBOF - Wiring diagram ............................... EC-550
ASCD ................................................................. EC-28
ASCD brake switch ........................... EC-473, EC-549
ASCD clutch switch ........................... EC-473, EC-549
ASCD steering switch ..................................... EC-466
ASCIND - Wiring diagram ............................... EC-560
AUDIO - Wiring diagram ...................................... AV-9
Auto anti-dazzling inside mirror ........................ GW-67
Axle ................................................................... MA-26
B
BA/FTS - Wiring diagram ................................. AT-171
BACK/L - Wiring diagram ................................... LT-73
Back-up lamp .......................................... LT-73, LT-87
Back-up lamp switch (M/T) ............................... MT-11
Basic inspection ................................................ EC-70
Battery ................................................................. SC-4
Battery/Starting/Charging System Tester SC-6, SC-18,
SC-26
Baulk ring (M/T) ................................................ MT-18
BCM (Body control module) .............................. BCS-3
Blower motor .................................... MTC-37, MTC-68
Blower resistor ................................................ MTC-72
Body alignment ................................................ BL-244
Body component parts ..................................... BL-232
Body construction ............................................ BL-243
Body exterior paint color .................................. BL-231
Body repair ....................................................... BL-231
Body sealing .................................................... BL-240
Brake booster .................................................... BR-19
Brake fluid level ................................................. MA-24
Brake inspection ............................................... MA-25
Brake lines and cables inspection ..................... MA-24
Brake pedal ......................................................... BR-6
Brake switch .................................................... EC-488
BRK/SW - Wiring diagram .............................. EC-489
Bulb specifications ........................................... LT-116
Bumper, front ...................................................... EI-14
C
Cabin air filter .................................................... MA-20
Camshaft ........................................................... EM-47
Camshaft inspection ......................................... EM-49
Camshaft position sensor (PHASE) ................ EC-327
CAN - Wiring diagram ........... EC-152, AT-95, CVT-69
CAN communication EC-30, EC-151, EC-154, AT-31,
AT-94
, CVT-25, CVT-68
CAN communication (EPS) ............................... STC-6
CHARGE - Wiring diagram ............................... SC-25
Charging system ............................................... SC-24
Chassis and body maintenance .............. MA-8, MA-20
CHIME - Wiring diagram ..................................... DI-50
Circuit breaker ................................................... PG-16
Closed loop control ............................. EC-24, EC-442
Clutch cover ....................................................... CL-13
Clutch disc ......................................................... CL-13
Clutch master cylinder ......................................... CL-9
Clutch pedal ......................................................... CL-5
Coil spring (rear) ............................................. RSU-11
IDX-4
ALPHABETICAL INDEX
EC-398, EC-406
EVAP control system pressure sensor .... EC-382, EC-
385, EC-391
EVAP control system purge flow monitoring diagnosis
EC-340
EVAP vapor lines inspection ............................. MA-19
Evaporative emission (EVAP) system ............... EC-31
Evaporator ...................................................... MTC-90
Exhaust manifold .............................................. EM-21
Exhaust system inspection ................... MA-20, MA-22
Expansion valve .............................................. MTC-91
F
F/FOG - Wiring diagram ..................................... LT-43
F/PUMP - Wiring diagram ................................ EC-571
Final drive (FF M/T) ........................................... MT-22
Floor trim ............................................................. EI-37
Flow charts ......................................................... GI-27
Fluid temparature sensor (CVT) ...................... CVT-85
Fluid temperature sensor (A/T) ........................ AT-106
Fluids ................................................................ MA-11
Fluorescent leak detector ............................... MTC-92
Flywheel (clutch) ................................................ CL-13
Flywheel runout .............................................. EM-103
Fork rod (M/T) .................................................... MT-21
Freeze frame data ............................... EC-52, EC-116
Front bumper ...................................................... EI-14
Front door ......................................................... GW-43
Front passenger air bag .................................. SRS-46
Front seat belt ...................................................... SB-3
Front seat belt pre-tensioner ..... SB-2, SRS-3, SRS-51
Front washer ...................................................... WW-4
Front wiper ......................................................... WW-4
FTS - Wiring diagram ......................... AT-103, CVT-86
FTTS - Wiring diagram ...................... EC-293, EC-298
FUEL - Wiring diagram ...................... EC-278, EC-286
Fuel cut control (at no load high engine speed) . EC-26
Fuel gauge ............................................................ DI-5
Fuel injection system ......................... EC-276, EC-284
Fuel injector ..................................................... EC-564
Fuel injector and fuel tube ................................ EM-33
Fuel level sensor ................. EC-415, EC-417, EC-419
Fuel line inspection .................................. FL-4, MA-15
Fuel precautions ................................................... GI-6
Fuel pressure check .......................................... EC-81
Fuel pressure release ........................................ EC-81
Fuel pump ........................................................ EC-570
Fuel systemCommercial Service Tools ................ FL-3
Fuel systemPREPARATION ................................. FL-3
Fuel tank temperature sensor ............ EC-291, EC-297
Fuel tank vacuum relief valve ............................ EC-34
Fuse ................................................................... PG-16
Fuse and fusible link box ................................... PG-77
Fusible link ......................................................... PG-16
G
Gauges ................................................................. DI-5
Gear components (M/T) .................................... MT-18
Generic scan tool (GST) ................................. EC-126
Glass ...................................... GW-11, GW-43, GW-47
Grille - See Exterior ............................................. EI-19
Ground distribution ............................................ PG-30
H
H/LAMP - Wiring diagram .................................... LT-8
H/PHON - Wiring diagram .................................. AV-52
Handling precautions for plastics ..................... BL-255
Harness connector ............................................ PG-68
Harness layout .................................................. PG-39
Hazard warning lamp ......................................... LT-51
Headlining - See Roof trim .................................. EI-39
Heated oxygen sensor 2 ..... EC-248, EC-257, EC-267
Heated oxygen sensor 2 heater ...................... EC-166
HEATER - Wiring diagram .............................. MTC-28
Heater system - Wiring diagram ..................... MTC-28
HFC134a (R134a) system precaution .............. MTC-4
HFC134a (R134a) system service procedure . MTC-80
HFC134a (R134a) system service tools ......... MTC-12
HFC134a system service equipment precaution MTC-9
HO2S2 - Wiring diagram ..... EC-251, EC-260, EC-270
HO2S2H - Wiring diagram .............................. EC-168
Horn ................................................................. WW-46
HORN - Wiring diagram ................................... WW-46
How to erase DTC for OBD system .................. EC-60
I
IATS - Wiring diagram ..................................... EC-197
Idle air volume learning ..................................... EC-78
Idle speed ......................................................... EC-75
Idle speed control (ISC) .................... EC-423, EC-425
Ignition coil ...................................................... EC-576
Ignition control system .................................... EC-576
Ignition timing .................................................... EC-75
IGNSYS - Wiring diagram ............................... EC-577
ILL - Wiring diagram ......................................... LT-111
Illumination control ........................................... LT-108
In-cabin Microfilter ............................................. MA-20
INJECT - Wiring diagram ................................ EC-565
Input shaft (FF M/T) .......................................... MT-18
Input/Output signal of TCM ............................. CVT-25
Instrument panel ................................................. IP-10
INT/L - Wiring diagram ....................................... LT-96
Intake air temperature sensor ........... EC-195, EC-215
Intake door control linkage adjustment ........... MTC-69
Intake manifold .................................................. EM-18
Intake valve timing control .............................. EC-156
Intake valve timing control solenoid valve ....... EC-173
Interior ................................................................. EI-32
Interior lamp ....................................................... LT-91
IPDM (Intelligent power distribution module engine
room) ................................................................. PG-17
IVC - Wiring diagram ....................................... EC-174
GENERAL MAINTENANCE
MA-5
C
D
E
F
G
H
I
J
K
MA
B
MA
Revision: June 20062007 Versa
GENERAL MAINTENANCEPFP:00000
Explanation of General MaintenanceELS001YB
General MaintenanceELS001YC
General maintenance includes those items which should be checked during the normal day-to-day operation
of the vehicle. They are essential if the vehicle is to continue operating properly. The owners can perform
checks and inspections themselves or they can have their NISSAN dealers do them.
OUTSIDE THE VEHICLE
The maintenance items listed here should be performed from time to time, unless otherwise specified.
INSIDE THE VEHICLE
The maintenance items listed here should be checked on a regular basis, such as when performing periodic maintenance, cleaning the
vehicle, etc.ItemReference page
TiresCheck the pressure including the spare, at least once a month and always prior
to a long distance trip. Adjust to the specified pressure if necessary. Check care-
fully for damage, cuts or excessive wear.WT-29, "
Tire"
Wheel nutsWhen checking the tires, make sure no nuts are missing, and check for any
loose nuts. Tighten if necessary.WT-6, "Rotation"
WindshieldClean the windshield on a regular basis. Check the windshield at least every six
months for cracks or other damage. Repair as necessary.—
Tire rotationTires should be rotated every 12,000 km (7,500 miles).WT-6, "
Rotation"
Wheel alignment and
balanceIf the vehicle pulls to either side while driving on a straight and level road, or if
you detect uneven or abnormal tire wear, there may be a need for wheel align-
ment. If the steering wheel or seat vibrates at normal highway speeds, wheel
balancing may be needed.FSU-6, "Wheel Align-
ment Inspection" and
WT-6, "
Balancing
Wheels"
Windshield wiper
bladesCheck for cracks or wear if they do not wipe properly. —
Doors and engine
hoodCheck that all doors and the engine hood operate smoothly as well as the trunk
lid and back hatch. Also make sure that all latches lock securely. Lubricate if
necessary. Make sure that the secondary latch keeps the hood from opening
when the primary latch is released.
When driving in areas using road salt or other corrosive materials, check lubri-
cation frequently.MA-27, "
Lubricating
Locks, Hinges and Hood
Latch"
LampsMake sure that the headlamps, stop lamps, tail lamps, turn signal lamps, and
other lamps are all operating properly and installed securely. Also check head-
lamp aim. Clean the headlamps on a regular basis.—
ItemReference page
Warning lamps and
buzzers/chimesMake sure that all warning lamps and buzzers/chimes are operating properly. —
Windshield wiper and
washerCheck that the wipers and washer operate properly and that the wipers do not
streak.—
Windshield defrosterCheck that the air comes out of the defroster outlets properly and in sufficient
quantity when operating the heater or air conditioning.—
Steering wheelCheck that it has the specified play. Be sure to check for changes in the steering
condition, such as excessive play, hard steering or strange noises.
Free play: Less than 35 mm (1.38 in)—
SeatsCheck seat position controls such as seat adjusters, seat back recliner, etc. to
make sure they operate smoothly and that all latches lock securely in every
position. Check that the head restraints move up and down smoothly and that
the locks (if equipped) hold securely in all latched positions. Check that the
latches lock securely for folding-down rear seat backs.—
Seat belts
Check that all parts of the seat belt system (e.g. buckles, anchors, adjusters and
retractors) operate properly and smoothly and are installed securely. Check the
belt webbing for cuts, fraying, wear or damage.MA-27, "
Checking Seat
Belts, Buckles, Retrac-
tors, Anchors and
Adjusters"
MA-14
ENGINE MAINTENANCE
Revision: June 20062007 Versa
If contaminated, flush the engine cooling system. Refer to MA-15, "FLUSHING COOLING SYSTEM" .
REFILLING ENGINE COOLANT
1. Install reservoir tank if removed. Refer to CO-11, "RADIATOR" .
2. Install radiator drain plug.
If water drain plug on cylinder block is removed, close and tighten it. Refer to EM-77, "CYLIN-
DER BLOCK" .
CAUTION:
Be sure to clean radiator drain plug and install with new O-ring. Refer to CO-11, "
Components" .
3. Make sure that each hose clamp has been firmly tightened.
4. Remove air duct assembly. Refer to EM-16, "
AIR CLEANER AND AIR DUCT" .
5. Disconnect heater hose (1) at position ( ) as shown.
Front
Enhance heater hose as high as possible.
6. Fill radiator and reservoir tank to specified level.
Pour engine coolant through engine coolant filler neck
slowly of less than 2 (2 1/8 US qt, 1-3/4 lmp qt) a minute
to allow air in system to escape.
Use NISSAN Genuine Engine Coolant or equivalent
mixed with water (distilled or demineralized). Fill cooling
system to specification. Refer to MA-11, "
RECOM-
MENDED FLUIDS AND LUBRICANTS".
When engine coolant overflows disconnected heater hose,
connect heater hose, and continue filling the engine coolant, if
heater hose is disconnected.
7. Install radiator cap.
8. Install air duct assembly. Refer to EM-16, "
AIR CLEANER AND AIR DUCT" .
9. Warm up until opening thermostat. Standard for warming-up time is approximately 10 minutes at 3,000
rpm.
Make sure thermostat opening condition by touching radiator hose (lower) to see a flow of warm water.
CAUTION:
Watch water temperature gauge so as not to overheat the engine.
10. Stop engine and cool down to less than approximately 50°C (122°F).
Cool down using fan to reduce the time.
If necessary, refill radiator up to filler neck with engine coolant.
11. Refill reservoir tank to “MAX” level line with engine coolant.
12. Repeat steps 6 through 10 two or more times with radiator cap installed until engine coolant level no
longer drops.
13. Check cooling system for leaks with engine running.
14. Warm up engine, and check for sound of engine coolant flow while running engine from idle up to 3,000
rpm with heater temperature controller set at several position between “COOL” and “WARM”.
Sound may be noticeable at heater unit.
15. Repeat step 14 three times.
16. If sound is heard, bleed air from cooling system by repeating steps 6 through 10 until engine coolant level
no longer drops.
PBIC3802E
SM A18 2B
MTC-1
MANUAL AIR CONDITIONER
J AIR CONDITIONER
CONTENTS
C
D
E
F
G
H
I
K
L
M
SECTION MTC
A
B
MTC
Revision: June 20062007 Versa PRECAUTIONS .......................................................... 4
Precautions for Supplemental Restraint System
(SRS) “AIR BAG” and “SEAT BELT PRE-TEN-
SIONER” .................................................................. 4
Precautions for Procedures without Cowl Top Cover ..... 4
Precautions for Working with HFC-134a (R-134a) ..... 4
General Refrigerant Precautions .............................. 5
Oil Precautions ......................................................... 5
Precautions for Refrigerant Connection ................... 5
FEATURES OF NEW TYPE REFRIGERANT
CONNECTION ...................................................... 5
O-RING AND REFRIGERANT CONNECTION ..... 6
Precautions for Servicing Compressor ..................... 8
Precautions for Service Equipment .......................... 9
RECOVERY/RECYCLING EQUIPMENT .............. 9
ELECTRONIC LEAK DETECTOR ........................ 9
VACUUM PUMP ................................................... 9
MANIFOLD GAUGE SET ...................................... 9
SERVICE HOSES ................................................. 9
SERVICE COUPLERS ........................................ 10
REFRIGERANT WEIGHT SCALE ...................... 10
CHARGING CYLINDER ...................................... 10
Precautions for Leak Detection Dye ....................... 10
IDENTIFICATION LABEL FOR VEHICLE ........... 10
PREPARATION ......................................................... 12
Special Service Tools ............................................. 12
HFC-134a (R-134a) Service Tools and Equipment ... 12
Commercial Service Tools ...................................... 15
REFRIGERATION SYSTEM ..................................... 16
Refrigerant Cycle ................................................... 16
REFRIGERANT FLOW ....................................... 16
FREEZE PROTECTION ..................................... 16
Refrigerant System Protection ............................... 16
REFRIGERANT PRESSURE SENSOR ............. 16
PRESSURE RELIEF VALVE ............................... 16
Component Layout ................................................. 17OIL ............................................................................. 18
Maintenance of Oil Quantity in Compressor ........... 18
OIL ....................................................................... 18
OIL RETURN OPERATION ................................. 18
OIL ADJUSTING PROCEDURE FOR COMPO-
NENTS REPLACEMENT EXCEPT COMPRES-
SOR ..................................................................... 19
OIL ADJUSTING PROCEDURE FOR COM-
PRESSOR REPLACEMENT ............................... 19
AIR CONDITIONER CONTROL ............................... 21
Control Operation ................................................... 21
BLOWER CONTROL DIAL ................................. 21
TEMPERATURE CONTROL DIAL ...................... 21
MODE DOOR CONTROL DIAL .......................... 21
INTAKE DOOR LEVER ....................................... 21
REAR WINDOW DEFOGGER SWITCH ............. 21
A/C SWITCH (IF EQUIPPED) ............................. 21
Discharge Air Flow ................................................. 22
System Description ................................................. 23
SWITCHES AND THEIR CONTROL FUNCTION ... 23
CAN Communication System Description .............. 23
TROUBLE DIAGNOSIS ............................................ 24
CONSULT-II Function (BCM) ................................. 24
CONSULT-II START PROCEDURE .................... 24
DATA MONITOR ................................................. 24
How to Perform Trouble Diagnosis for Quick and
Accurate Repair ...................................................... 24
WORK FLOW ...................................................... 24
SYMPTOM TABLE .............................................. 24
Component Parts and Harness Connector Location ... 25
ENGINE COMPARTMENT .................................. 25
PASSENGER COMPARTMENT ......................... 26
Schematic ............................................................... 27
Wiring Diagram — Heater — .................................. 28
WITHOUT A/C ..................................................... 28
Wiring Diagram — A/C,M — ................................... 29
Operational Check .................................................. 33
CHECKING BLOWER ......................................... 33
CHECKING DISCHARGE AIR ............................ 33
CHECKING RECIRCULATION ........................... 33
MTC-2Revision: June 20062007 Versa CHECKING TEMPERATURE DECREASE ......... 33
CHECKING TEMPERATURE INCREASE .......... 33
CHECKING A/C SWITCH (IF EQUIPPED) ......... 33
CHECKING DEFROST A/C SWITCH (IF
EQUIPPED) ......................................................... 33
Mode Door .............................................................. 34
INSPECTION FLOW ........................................... 34
Air Mix Door ............................................................ 35
INSPECTION FLOW ........................................... 35
Intake Door ............................................................. 36
INSPECTION FLOW ........................................... 36
Blower Motor Circuit ............................................... 37
INSPECTION FLOW ........................................... 37
DIAGNOSTIC PROCEDURE FOR BLOWER
MOTOR ............................................................... 38
Magnet Clutch Circuit (If Equipped) ........................ 41
INSPECTION FLOW ........................................... 41
SYSTEM DESCRIPTION .................................... 42
DIAGNOSTIC PROCEDURE FOR MAGNET
CLUTCH .............................................................. 42
Insufficient Cooling ................................................. 50
INSPECTION FLOW ........................................... 50
PERFORMANCE TEST DIAGNOSIS ................. 52
PERFORMANCE CHART ................................... 54
TROUBLE DIAGNOSIS FOR UNUSUAL PRES-
SURE ................................................................... 55
Insufficient Heating ................................................. 58
INSPECTION FLOW ........................................... 58
Noise ...................................................................... 60
INSPECTION FLOW ........................................... 60
CONTROLLER .......................................................... 61
Removal and Installation ........................................ 61
REMOVAL ........................................................... 61
INSTALLATION .................................................... 61
Disassembly and Assembly .................................... 62
THERMO CONTROL AMPLIFIER ............................ 63
Removal and Installation ........................................ 63
REMOVAL ........................................................... 63
INSTALLATION .................................................... 63
A/C UNIT ASSEMBLY .............................................. 64
Removal and Installation ........................................ 64
REMOVAL ........................................................... 64
INSTALLATION .................................................... 65
Disassembly and Assembly .................................... 66
BLOWER MOTOR .................................................... 68
Removal and Installation ........................................ 68
REMOVAL ........................................................... 68
INSTALLATION .................................................... 68
INTAKE DOOR .......................................................... 69
Intake Door Cable Adjustment ................................ 69
AIR MIX DOOR ......................................................... 70
Air Mix Door Cable Adjustment .............................. 70
MODE DOOR ............................................................ 71
Mode Door Cable Adjustment ................................ 71
BLOWER FAN RESISTOR ....................................... 72
Removal and Installation ........................................ 72
REMOVAL ........................................................... 72
INSTALLATION .................................................... 72HEATER CORE .........................................................73
Removal and Installation .........................................73
REMOVAL ............................................................73
INSTALLATION ....................................................73
AIR CONDITIONER FILTER .....................................74
Removal and Installation .........................................74
FUNCTION ..........................................................74
REPLACEMENT TIMING ....................................74
REPLACEMENT PROCEDURES ........................74
DUCTS AND GRILLES .............................................75
Removal and Installation .........................................75
CENTER VENTILATOR GRILLES .......................76
SIDE VENTILATOR GRILLES (LH/RH) ...............76
DEFROSTER NOZZLE AND SIDE
DEFROSTER DUCTS (LH/RH) ...........................77
SIDE VENTILATOR DUCTS ................................77
CENTER VENTILATOR DUCTS .........................78
SIDE FOOT DUCTS ............................................78
FLOOR DUCTS ...................................................78
REFRIGERANT LINES .............................................80
HFC-134a (R-134a) Service Procedure ..................80
SETTING OF SERVICE TOOLS AND EQUIP-
MENT ...................................................................80
Components ............................................................82
Removal and Installation of Compressor ................84
REMOVAL ............................................................84
INSPECTION FOR CLUTCH DISC TO PULLEY
CLEARANCE .......................................................85
INSTALLATION ....................................................85
Removal and Installation of Low-pressure Flexible
Hose ........................................................................85
REMOVAL ............................................................85
INSTALLATION ....................................................86
Removal and Installation of High-pressure Flexible
Hose ........................................................................86
REMOVAL ............................................................86
INSTALLATION ....................................................87
Removal and Installation of High-pressure Pipe .....87
REMOVAL ............................................................87
INSTALLATION ....................................................87
Removal and Installation of Refrigerant Pressure
Sensor .....................................................................88
REMOVAL ............................................................88
INSTALLATION ....................................................88
Removal and Installation of Condenser ..................88
REMOVAL ............................................................88
INSTALLATION ....................................................88
Removal and Installation of Liquid Tank .................89
REMOVAL ............................................................89
INSTALLATION ....................................................89
Removal and Installation of Evaporator ..................90
REMOVAL ............................................................90
INSTALLATION ....................................................90
Removal and Installation of Expansion Valve .........91
REMOVAL ............................................................91
INSTALLATION ....................................................91
Checking for Refrigerant Leaks ..............................92
Checking System for Leaks Using the Fluorescent
Leak Detector ..........................................................92
MTC-28
TROUBLE DIAGNOSIS
Revision: June 20062007 Versa
Wiring Diagram — Heater —EJS0057I
WITHOUT A/C
LJWA0017E