PRE-DELIVERY INSPECTION REPORT
10-34
C.  ELECTRICAL
a. Ignition Switch Operation
b. Left Hand Switch Operation & Pass Beam
  Horn
  Indicator  Head Light
c. All Bulbs - Functioningd. Battery
  Electrolyte Level
  Specific Gravity  Routing of Breather Pipe  Fuse Routing of Positive Wire (Red) Below Breather Pipe
D.  ROAD TEST
a. Starting
b. Gear Shifting Operationc. Clutch Operationd. Application of Brakes (Front and Rear)e. Speedo/ Odo Meter OperationEXPLAINED BY:SIGNATURE :NAME :
MAIN SELLING DLR'S STAMP, SIGN & CODE
CUSTOMER’S SIGNATURE:
SERVICE2.pmd9/24/2005, 8:01 AM 4