2006 SUZUKI SWIFT Timing cover

[x] Cancel search: Timing cover

Page 47 of 1496

SUZUKI SWIFT 2006 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine Table of Contents 1-iii
EVAP Canister Purge Valve and Its Circuit 
Inspection.......................................................... 1B-2
Va

Page 103 of 1496

SUZUKI SWIFT 2006 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine Engine General Information and Diagnosis:  1A-53
DTC Troubleshooting
NOTE
• When measuring circuit voltage, resistance and/or pulse signal at

Page 289 of 1496

SUZUKI SWIFT 2006 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine Engine Mechanical:  1D-4
Targeted Timing Varying Operation
Diagnostic Information and Procedures
Compression CheckS7RS0B1404001
Check compressi

Page 296 of 1496

SUZUKI SWIFT 2006 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine 1D-11 Engine Mechanical: 
2) Remove oil, old sealant, and dust from sealing surfaces on cylinder head and cover. After cleaning, 
apply sealant

Page 305 of 1496

SUZUKI SWIFT 2006 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine Engine Mechanical:  1D-20
15) Install A/C compressor to its bracket (if equipped) referring to “Compressor Assembly Removal and 
Installation

Page 306 of 1496

SUZUKI SWIFT 2006 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine 1D-21 Engine Mechanical: 
Timing Chain Cover Removal and InstallationS7RS0B1406013
CAUTION! 
• Keep working table, tools and hands clean whil

Page 307 of 1496

SUZUKI SWIFT 2006 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine Engine Mechanical:  1D-22
Installation1) Clean sealing surface on timing chain cover, cylinder  block and cylinder head.
Remove oil, old sealan

Page 308 of 1496

SUZUKI SWIFT 2006 2.G Service Workshop Manual Downloaded from www.Manualslib.com manuals search engine 1D-23 Engine Mechanical: 
8) Install new O-ring (1) to oil gallery pipes No.2 (2) and 
No.3 (3).
9) Install oil gallery pipes  No.2 and No.3 to
Page:   1-8 9-16 17-24 next >