FSU-2
PRECAUTIONS
Revision: November 20092006 QX56
PRECAUTIONSPFP:00001
PrecautionsEES00253
When installing the rubber bushings, the final tightening must be done under unladen condition and with
the tires on level ground. Oil will shorten the life of the rubber bushings, so wipe off any spilled oil immedi-
ately.
Unladen condition means the fuel tank, engine coolant and lubricants are at the full specification. The
spare tire, jack, hand tools, and mats are in their designated positions.
After installing suspension components, check the wheel alignment.
Lock nuts are not reusable. Always use new lock nuts for installation. New lock nuts are pre-oiled, do not
apply any additional lubrication.
FSU-6
ON-VEHICLE SERVICE
Revision: November 20092006 QX56
ON-VEHICLE SERVICEPFP:00000
Front Suspension PartsEES00258
Check front suspension parts for excessive play, cracks, wear and
other damage.
Shake each front wheel to check for excessive play.
If looseness is noted, inspect wheel bearing end play, then
check ball joint end play. Refer to FA X - 5 , "
WHEEL BEARING
INSPECTION" and FSU-15, "Inspection" .
Make sure that the cotter pin is inserted (4WD only).
Retighten all nuts and bolts to the specified torque.
Check shock absorber for oil leakage and other damage.
Check suspension ball joint for grease leakage and ball joint
dust cover for cracks and other damage.
Front Wheel AlignmentEES00259
PRELIMINARY INSPECTION
WARNING:
Always adjust the alignment with the vehicle on a flat surface.
NOTE:
If alignment is out of specification, inspect and replace any damaged or worn suspension parts before making
any adjustments.
1. Check and adjust the wheel alignment with the vehicle under unladen conditions. “Unladen conditions”
means that the fuel, coolant, and lubricant are full; and that the spare tire, jack, hand tools and mats are in
their designated positions.
2. Check the tires for incorrect air pressure and excessive wear.
3. Check the wheels for run out and damage. Refer to WT-5, "
Inspection" .
4. Check the wheel bearing axial end play. Refer to FA X - 5 , "
WHEEL BEARING INSPECTION" .
5. Check the shock absorbers for leaks or damage.
6. Check each mounting point of the suspension components for any excessive looseness or damage.
7. Check each link, arm, and the rear suspension member for any damage.
8. Check the vehicle height. Refer to FSU-20, "
Wheelarch Height (Unladen*1 )" .
Verify the level using Consult-II memory register 1103 and set to 0 ± 10 mm (0 ± 0.39 in) as necessary.
GENERAL INFORMATION AND RECOMMENDATIONS
1. A Four-Wheel Thrust Alignment should be performed.
This type of alignment is recommended for any NISSAN vehicle.
The four-wheel “thrust” process helps ensure that the vehicle is properly aligned and the steering wheel
is centered.
The alignment machine itself should be capable of accepting any NISSAN vehicle.
The alignment machine should be checked to ensure that it is level.
2. Make sure the alignment machine is properly calibrated.
Your alignment machine should be regularly calibrated in order to give correct information. Suspension component torques : Refer to
FSU-5,
"Components" . SMA525A
SFA392B
FSU-20
SERVICE DATA AND SPECIFICATIONS (SDS)
Revision: November 20092006 QX56
Ball JointEES0025M
*1 Measure at cotter pin hole
*2 Measure at groove
Wheelarch Height (Unladen*1 )EES0025N
Unit: mm (in)
*1: Fuel, radiator coolant and engine oil full. Spare tire, jack, hand tools and mats in designated positions.
*2: Verify the vehicle height. If vehicle height is not within ± 10 mm (0.39 in) of the specification, perform the control unit initialization pro-
cedure. Refer to RSU-47, "
Initialization Procedure" .
Swinging force “A”
Upper ball joint 8.1 – 103.2 N (0.8 – 10.5 kg-f, 1.8 – 23.2 lb-f) *1
Lower ball joint 11.4 – 145.5 N (1.1 – 14.8 kg-f, 2.5 – 32.7 lb-f) *2
Turning torque “B” 0.5 - 6.4 N·m (0.05 - 0.65 kg-m, 4 - 57 in-lb)
Vertical end play “C” 0 mm (0 in)
SFA858AWEIA0076E
Suspension type
Air leveling*2
Applied model2WD4WD
Front wheelarch height (Hf) 913
(35.94) 931
(36.65)
Rear wheelarch height (Hr) 912
(35.91) 932
(36.69)
LEIA0085E
IDX-4
ALPHABETICAL INDEX
E
ECM input/output signal ..................... EC-105
, EC-129
ECM power supply ............................. EC-145, EC-453
ECM relay ........................................................ EC-145
ECM/PW - Wiring diagram ............................... EC-454
ECTS - Wiring diagram .................................... EC-194
Electric sunroof .................................................. RF-10
Electric throttle control actuator ......... EC-534, EC-545
Electrical load signal circuit .............................. EC-596
Electrical units location ...................................... PG-65
Electronic ignition (EI) system ........................... EC-26
Engine control circuit diagram ......................... EC-103
Engine control component parts location ........... EC-96
Engine control module (ECM) .......................... EC-457
Engine control system diagram ......................... EC-23
Engine coolant .................................................. CO-10
Engine coolant temperature sensor (ECTS) ... EC-192,
EC-205
Engine fail-safe system ...................................... EC-91
Engine oil ............................................................. LU-7
Engine oil filter replacement ............................. MA-17
Engine oil precautions .......................................... GI-7
Engine oil replacement ..................................... MA-17
Engine removal ................................................. EM-74
Engine room cover ............................................ EM-12
Engine serial number .......................................... GI-49
ETC1 - Wiring diagram .................................... EC-535
ETC2 - Wiring diagram .................................... EC-530
ETC3 - Wiring diagram .................................... EC-541
EVAP canister .................................................... EC-35
EVAP canister purge volume control solenoid valve ....
EC-373
, EC-381
EVAP canister vent control valve ....... EC-388, EC-395
EVAP control system (small leak) diagnosis .. EC-365,
EC-419
, EC-427
EVAP control system pressure sensor .... EC-402, EC-
405, EC-411
EVAP control system purge flow monitoring diagnosis
EC-360
EVAP vapor lines inspection ............................. MA-20
Evaporative emission (EVAP) system ............... EC-32
Evaporator ..................................................... ATC-184
Exhaust manifold .............................................. EM-21
Exhaust system ................................................... EX-3
Exhaust system inspection .................................. EX-3
Expansion valve ............................................. ATC-186
F
F/FOG - Wiring diagram ..................................... LT-71
F/PUMP - Wiring diagram ................................ EC-605
Final drive pre-inspection ................................. FFD-15
Final drive removal and installation .. FFD-12, RFD-13
Flow charts ......................................................... GI-28
Fluid temperature sensor (A/T) ........................ AT-127
Fluids ................................................................ MA-11
Fluorescent leak detector .............................. ATC-187
Fog lamp, front .................................................... LT-69
Fog lamp, front, removal and installation ........... LT-79
Foot lamp ......................................................... LT-135
Freeze frame data ............................... EC-53, EC-118
Front brake solenoid valve ................. AT-143, AT-145
Front bumper ...................................................... EI-13
Front case (Transfer) .......................... TF-149, TF-176
Front combination lamp removal and installation LT-31
Front door ............................. BL-128, BL-131, GW-65
Front Door Trim ................................................... EI-32
Front drive shaft (Transfer) ................. TF-149, TF-176
Front fog lamp .................................................... LT-69
Front fog lamp removal and installation ............. LT-79
Front passenger air bag .................................. SRS-50
Front seat ........................................................... SE-91
Front seat belt ...................................................... SB-3
Front seat belt pre-tensioner ............... SRS-3, SRS-57
Front washer ...................................................... WW-4
Front wiper ......................................................... WW-4
FTS - Wiring diagram ....................................... AT-128
FTTS - Wiring diagram ...................... EC-311, EC-316
Fuel cut control (at no load high engine speed) EC-27
Fuel filter replacement ......................................... FL-6
Fuel gauge ............................................................ DI-5
Fuel injection system (Bank 1) .......... EC-288, EC-299
Fuel injection system (Bank 2) .......... EC-288, EC-299
Fuel injector .................................................... EC-598
Fuel injector and fuel tube ................................. EM-31
Fuel level sensor ................. EC-436, EC-438, EC-440
Fuel line inspection .............................................. FL-4
Fuel precautions ................................................... GI-5
Fuel pressure check .......................................... EC-80
Fuel pressure release ....................................... EC-80
Fuel pump ....................................................... EC-604
Fuel pump and gauge .......................................... FL-6
Fuel system .......................................................... FL-4
Fuel tank ............................................................ FL-10
Fuel tank temperature sensor ........... EC-309, EC-315
Fuel tank vacuum relief valve ........................... EC-35
FUELB1 - Wiring diagram ................. EC-290, EC-301
FUELB2 - Wiring diagram ................. EC-292, EC-303
Fuse ...................................................... PG-17, PG-77
Fuse and fusible link box .................................. PG-77
Fuse block ......................................................... PG-76
Fusible link ............................................ PG-17, PG-77
G
Garage jack and safety stand ............................. GI-41
Gauges ................................................................. DI-5
Generator .......................................................... SC-17
Generic scan tool (GST) ................................. EC-127
Glass ...................................... GW-11, GW-65, GW-68
Glove box lamp ................................................ LT-158
GPS antenna ..................................................... AV-85
Grease .............................................................. MA-11
Ground distribution ............................................ PG-31
HEADLAMP (FOR USA)LT-29
C
DE
F
G H
I
J
L
M A
B
LT
Revision: November 2009 2006 QX56
Aiming AdjustmentEKS00B89
For details, refer to the regulations in your area.
NOTE:
If vehicle front body has been repaired and /or the headlamp assembly has been replaced, check headlamp
aiming.
HEADLAMP AIMING
NOTE:
Before performing aiming adjustment, check the following:
–Confirm headlamp aiming switch is set to "0" (zero) position.
–Ensure all tires are inflated to correct pressure.
–Place vehicle and screen on level surface.
–Ensure there is no load in vehicle other than the driver (or equivalent weight placed in driver's position).
Coolant and engine oil filled to correct level, and fuel tank full.
–Confirm spare tire, jack and tools are properly stowed.
–Aim each headlamp individually and ensure other headlamp beam pattern is blocked from screen.
–Use adjusting screw to perform aiming adjustment
WKIA1859E
LT-78
FRONT FOG LAMP
Revision: November 20092006 QX56
Aiming AdjustmentEKS00B9M
The fog lamp is a semi-sealed beam type which uses a replaceable halogen bulb. Before performing aiming
adjustment, make sure of the following.
Keep all tires inflated to correct pressure.
Place vehicle on level ground.
See that vehicle is unloaded (except for full levels of coolant,
engine oil and fuel, and spare tire, jack, and tools). Have the
driver or equivalent weight placed in driver seat.
Adjust aiming in the vertical direction by turning the adjustment
screw.
NOTE:
Access adjustment screw from underneath front bumper. Turn screw
clockwise to raise pattern and counterclockwise to lower pattern.
1. Set the distance between the screen and the center of the fog lamp lens as shown.
2. Turn front fog lamps ON.
3. Adjust front fog lamps using adjusting screw so that the top edge of the high intensity zone is 200 mm (7.9 in) below the height of
the fog lamp centers as shown.
When performing adjustment, if necessary, cover the headlamps
and opposite fog lamp.
SEL350X
MEL327G
MEL328GA
ENGINE OILLU-7
C
DE
F
G H
I
J
K L
M A
LU
Revision: November 2009 2006 QX56
ENGINE OILPFP:KLA92
InspectionEBS00LMS
OIL LEVEL
Before starting the engine make sure the vehicle is parked on a
flat and level surface, then check the oil level. If the engine is
already running, turn it off and allow 10 minutes before check-
ing.
Check that the oil level is within the low (L) and high (H) range
as indicated on the dipstick.
If the engine oil level is out of range, add oil as necessary. Refer
to GI-46, "
Recommended Chemical Products and Sealants" .
OIL APPEARANCE
Check the engine oil for a white milky appearance or excessive contamination.
If the engine oil is milky, it is highly probable that it is contaminated with engine coolant. Repair the broken
parts.
OIL LEAKAGE
Check for oil leakage around the following areas:
Oil pan
Oil pan drain plug
Oil pressure sensor
Oil filter
Oil cooler
Intake valve timing control cover
Intake valve timing control solenoid valve
Front cover
Mating surface between cylinder block and cylinder head
Mating surface between cylinder head and rocker cover
Crankshaft oil seal (front and rear)
OIL PRESSURE CHECK
CAUTION:
Be careful not to burn yourself, as engine oil may be hot.
Put the selector lever in the Park “P” position.
1. Check the engine oil level. Refer to LU-7, "
OIL LEVEL" .
2. Remove engine front undercover using power tool.
3. Disconnect the oil pressure sensor harness connector.
4. Remove the oil pressure sensor.
SMA954C
WBIA0538E
LU-12Revision: November 2009
OIL COOLER
2006 QX56
INSTALLATION
Installation is in the reverse order of removal, paying attention to the following:
Confirm that no foreign objects are adhering to the sealing sur-
faces of the oil cooler or oil pan.
Tighten the connecting bolt after aligning the stopper on the oil
pan side with protrusion of the oil cooler.
INSPECTION AFTER INSTALLATION
1. Check levels and add engine oil and engine coolant. Refer to LU-7, "OIL LEVEL" .
2. Start the engine, and check for leaks of engine oil and engine coolant.
3. Stop engine and wait for 10 minutes.
4. Check engine oil level and engine coolant level again.
KBIA2500E