2 - 18
SPECCABLE ROUTING DIAGRAM
EC240000
CABLE ROUTING DIAGRAM
1Fuel tank breather hose
2Clutch cable
3Oil tank breather hose
4Hot starter cable
5Cylinder head breather hose
6Cable guide
7Hose guide
8Brake hose
9Engine stop switch lead
0Clamp
ASub-wire harness
BThrottle position sensor lead
CNeutral switch lead
DOil hose
ECDI magneto lead
FRadiator breather hose
GCarburetor breather hose
HCarburetor overflow hoseÈInsert the end of the fuel tank
breather hose into the hole in
the steering stem cap.
ÉPass the hot starter cable
between the cylinder head
breather hose, oil tank breather
hose and ignition coil, then on
the outside of the left engine
bracket.
ÊPass the clutch cable through
the cable guides.
ËPass the clutch cable in front of
the radiator mounting boss.
ÌFasten the neutral switch lead
and CDI magneto lead to the
cable guide with a plastic locking
tie and cut off the tie end.ÍFasten the engine stop switch
lead, neutral switch lead and
CDI magneto lead.
ÎFasten the engine stop switch
lead and sub-wire harness at the
protecting tube for the engine
stop switch lead.
ÏFasten the sub-wire harness
and hot starter cable at the white
tape for the sub-wire harness.
ÐFasten the sub-wire harness.
ÑPass the sub-wire harness
between the engine brackets.
B
E
C
9
B
C
C
9
0
0
A
0
0
0
0
B 0 Ì
Í
Î
Ï
Ð
Ð
Ñ
Ò
Ó
C
D
0 0 0E F
Ô Õ Ö ×
1
2
3
4
5 6 6 8
7
Ê
Ê ËÈ
É
AGG
H
Ø
D
F
C