Page 111 of 4555
![NISSAN X-TRAIL 2005 Service Repair Manual CAMSHAFT
EM-57
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
CAUTION:
To avoid power steering fluid leakage, temporarily fix power steering reservoir tank vertically.
4. Remove intake valve timing control cover wi NISSAN X-TRAIL 2005 Service Repair Manual CAMSHAFT
EM-57
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
CAUTION:
To avoid power steering fluid leakage, temporarily fix power steering reservoir tank vertically.
4. Remove intake valve timing control cover wi](/manual-img/5/57403/w960_57403-110.png)
CAMSHAFT
EM-57
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
CAUTION:
To avoid power steering fluid leakage, temporarily fix power steering reservoir tank vertically.
4. Remove intake valve timing control cover with the following procedure:
a. Disconnect intake valve timing control solenoid valve harness connector.
b. Remove intake valve timing control solenoid valve, if necessary.
c. Disconnect ground cables.
d. Loosen bolts in reverse order as shown in the figure.
e . U s e a s e a l c u t t e r ( s p e c i a l s e r v i c e t o o l : K V 1 0 1111 0 0 ) o r e q u i v a -
lent tool to cut liquid gasket for removal.
5. Pull chain guide between camshaft sprockets out through front cover.
6. Set No. 1 cylinder at TDC on its compression stroke with the following procedure:
a. Open splash guard on RH undercover.
b. Rotate crankshaft pulley clockwise and align TDC mark to timing
indicator on front cover.
c. At the same time, make sure that the mating marks on camshaft
sprockets are located as shown in the figure.
If not, rotate crankshaft pulley one more turn to align mating
marks to the positions in the figure.
7. Remove camshaft sprockets with the following procedure:
a. Line up the mating marks on camshaft sprockets, and paint indelible mating marks on timing chain link
plate.
KBIA0085E
KBIA0190E
PBIC2351E
Page 118 of 4555
![NISSAN X-TRAIL 2005 Service Repair Manual EM-64
[QR]
CAMSHAFT
e. Tighten mounting bolts in numerical order as shown in the fig-
ure.
10. Inspect and adjust valve clearance. Refer to EM-64, "
Valve Clearance" .
11. Install in the reverse ord NISSAN X-TRAIL 2005 Service Repair Manual EM-64
[QR]
CAMSHAFT
e. Tighten mounting bolts in numerical order as shown in the fig-
ure.
10. Inspect and adjust valve clearance. Refer to EM-64, "
Valve Clearance" .
11. Install in the reverse ord](/manual-img/5/57403/w960_57403-117.png)
EM-64
[QR]
CAMSHAFT
e. Tighten mounting bolts in numerical order as shown in the fig-
ure.
10. Inspect and adjust valve clearance. Refer to EM-64, "
Valve Clearance" .
11. Install in the reverse order of removal after this step.
Valve ClearanceEBS00LS3
INSPECTION
Perform inspection as follows after removal, installation or replacement of camshaft or valve-related parts, or if
there is unusual engine conditions regarding valve clearance.
1. Remove rocker cover. Refer to EM-44, "
ROCKER COVER" .
2. Open splash guard on RH undercover.
3. Measure the valve clearance with the following procedure:
a. Set No. 1 cylinder at TDC of its compression stroke.
Rotate crankshaft pulley clockwise and align TDC mark to
timing indicator on front cover.
At the same time, make sure that both intake and exhaust
cam noses of No. 1 cylinder face outside as shown in the fig-
ure.
If they do not face outside, rotate crankshaft pulley once more
(360 degrees) and align as shown in the figure.
b. Use a feeler gauge, measure the clearance between valve lifter
and camshaft.
KBIA0085E
KBIA0190E
KBIA0400J
SEM139D
Page 119 of 4555
![NISSAN X-TRAIL 2005 Service Repair Manual CAMSHAFT
EM-65
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
Valve clearance:
Unit: mm (in)
*:Approximately 80°C (176°F)
By referring to the figure, measure the valve clearances at
locations marked “×” as NISSAN X-TRAIL 2005 Service Repair Manual CAMSHAFT
EM-65
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
Valve clearance:
Unit: mm (in)
*:Approximately 80°C (176°F)
By referring to the figure, measure the valve clearances at
locations marked “×” as](/manual-img/5/57403/w960_57403-118.png)
CAMSHAFT
EM-65
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
Valve clearance:
Unit: mm (in)
*:Approximately 80°C (176°F)
By referring to the figure, measure the valve clearances at
locations marked “×” as shown in the table below (locations
indicated with black arrow in the figure) with a feeler gauge.
No. 1 cylinder compression TDC
c. Rotate crankshaft pulley one revolution (360 degrees) and align
TDC mark to timing indicator on front cover.
By referring to the figure, measure the valve clearance at
locations marked “×” as shown in the table below (locations
indicated with black arrow in the figure) with a feeler gauge.
No. 4 cylinder compression TDC
4. If out of standard, perform adjustment. Refer to EM-65, "
ADJUSTMENT" .
ADJUSTMENT
Perform adjustment depending on selected head thickness of valve lifter.
1. Remove camshaft. Refer to EM-56, "
REMOVAL" .
2. Remove valve lifters at the locations that are out of the standard.
Cold Hot * (reference data)
Intake 0.24 - 0.32 (0.009 - 0.013) 0.304 - 0.416 (0.012 - 0.016)
Exhaust 0.26 - 0.34 (0.010 - 0.013) 0.308 - 0.432 (0.012 - 0.017)
Measuring position No. 1 CYL. No. 2 CYL. No. 3 CYL. No. 4 CYL.
No. 1 cylinder at
compression TDCINT × ×
EXH × ×
PBIC2624E
KBIA0190E
Measuring position No. 1 CYL. No. 2 CYL. No. 3 CYL. No. 4 CYL.
No. 4 cylinder at
compression TDCINT × ×
EXH × ×
PBIC2625E
Page 120 of 4555
![NISSAN X-TRAIL 2005 Service Repair Manual EM-66
[QR]
CAMSHAFT
3. Measure the center thickness of the removed valve lifters with a
micrometer.
4. Use the equation below to calculate valve lifter thickness for replacement.
Thickness of new v NISSAN X-TRAIL 2005 Service Repair Manual EM-66
[QR]
CAMSHAFT
3. Measure the center thickness of the removed valve lifters with a
micrometer.
4. Use the equation below to calculate valve lifter thickness for replacement.
Thickness of new v](/manual-img/5/57403/w960_57403-119.png)
EM-66
[QR]
CAMSHAFT
3. Measure the center thickness of the removed valve lifters with a
micrometer.
4. Use the equation below to calculate valve lifter thickness for replacement.
Thickness of new valve lifter can be identified by stamp mark
on the reverse side (inside the cylinder).
Stamp mark “696” indicates 6.96 mm (0.2740 in) in thickness.
NOTE:
Available thickness of valve lifter: 26 sizes range 6.96 to 7.46 mm (0.2740 to 0.2937 in) in steps of 0.02
mm (0.0008 in) (when manufactured at factory). Refer to EM-119, "
Available Valve Lifter" .
5. Install the selected valve lifter.
6. Install camshaft. Refer to EM-61, "
INSTALLATION" .
7. Manually rotate crankshaft pulley a few rotations.
8. Make sure that valve clearances for cold engine are within specifications by referring to the specified val-
ues. Refer to EM-64, "
INSPECTION" .
9. Install all removed parts in the reverse order of removal. Refer to EM-61, "
INSTALLATION" .
10. Warm up the engine, and check for unusual noise and vibration.
KBIA0057E
Valve lifter thickness calculation: t = t1 + (C1 – C2 )
t = Valve lifter thickness to be replaced
t
1 = Removed valve lifter thickness
C
1= Measured valve clearance
C
2= Standard valve clearance:
Intake : 0.28 mm (0.011 in)
Exhaust : 0.30 mm (0.012 in)
KBIA0119E
Page 122 of 4555
![NISSAN X-TRAIL 2005 Service Repair Manual EM-68
[QR]
OIL SEAL
Drive belt; Refer to EM-13, "DRIVE BELTS" .
Crankshaft pulley; Refer to EM-46, "TIMING CHAIN" .
2. Remove front oil seal with a suitable tool.
CAUTION:
Be careful not to damage NISSAN X-TRAIL 2005 Service Repair Manual EM-68
[QR]
OIL SEAL
Drive belt; Refer to EM-13, "DRIVE BELTS" .
Crankshaft pulley; Refer to EM-46, "TIMING CHAIN" .
2. Remove front oil seal with a suitable tool.
CAUTION:
Be careful not to damage](/manual-img/5/57403/w960_57403-121.png)
EM-68
[QR]
OIL SEAL
Drive belt; Refer to EM-13, "DRIVE BELTS" .
Crankshaft pulley; Refer to EM-46, "TIMING CHAIN" .
2. Remove front oil seal with a suitable tool.
CAUTION:
Be careful not to damage front cover and crankshaft.
INSTALLATION
1. Apply new engine oil to new front oil seal joint surface and seal lip.
2. Install front oil seal so that each seal lip is oriented as shown in
the figure.
Press-fit front oil seal until it is flush with front end surface of
front cover with a suitable tool.
CAUTION:
Be careful not to damage front cover and crankshaft.
Press-fit oil seal straight to avoid causing burrs or tilt-
ing.
3. Install in the reverse order of removal after this step.
Removal and Installation of Rear Oil SealEBS00KNO
REMOVAL
1. Remove transaxle assembly. Refer to MT-19, "TRANSAXLE ASSEMBLY" (M/T models) or AT- 4 1 3 ,
"REMOVAL AND INSTALLATION" (A/T models).
2. Remove clutch cover and clutch disc (M/T models). Refer to CL-16, "
CLUTCH DISC, CLUTCH COVER
AND FLYWHEEL" .
3. Remove drive plate (A/T models) or flywheel (M/T models). Refer to EM-89, "
CYLINDER BLOCK" .
4. Remove rear oil seal with a suitable tool.
CAUTION:
Be careful not to damage crankshaft and cylinder block.
INSTALLATION
1. Apply new engine oil to new rear oil seal joint surface and seal lip.
SEM829E
SEM715A
SBIA0266E
Page 182 of 4555
![NISSAN X-TRAIL 2005 Service Repair Manual EM-128
[QR]
SERVICE DATA AND SPECIFICATIONS (SDS)
Oil strainer M6 bolt
8.8 (0.90, 78) *2
M8 bolt 21.6 (2.2, 16)
Ignition coil
6.4 (0.65, 57) *
2
Spark plug24.5 (2.5, 18)
*1 Fuel tube1) 10.1 (1.0, 7) NISSAN X-TRAIL 2005 Service Repair Manual EM-128
[QR]
SERVICE DATA AND SPECIFICATIONS (SDS)
Oil strainer M6 bolt
8.8 (0.90, 78) *2
M8 bolt 21.6 (2.2, 16)
Ignition coil
6.4 (0.65, 57) *
2
Spark plug24.5 (2.5, 18)
*1 Fuel tube1) 10.1 (1.0, 7)](/manual-img/5/57403/w960_57403-181.png)
EM-128
[QR]
SERVICE DATA AND SPECIFICATIONS (SDS)
Oil strainer M6 bolt
8.8 (0.90, 78) *2
M8 bolt 21.6 (2.2, 16)
Ignition coil
6.4 (0.65, 57) *
2
Spark plug24.5 (2.5, 18)
*1 Fuel tube1) 10.1 (1.0, 7)
2) 23.6 (2.4, 17)
*1 Rocker cover 1)
2.0 (0.20, 18) *
2
2)
8.3 (0.85, 73) *2
PCV valve
2.5 (0.26, 22) *2
Intake valve timing control solenoid valve
6.4 (0.65, 57) *2
*1 Intake valve timing control cover 12.8 (1.3, 9)
Camshaft position sensor (PHASE)
6.4 (0.65, 57) *
2
Camshaft sprockets (Intake and Exhaust) 142 (14, 105)
Chain tensioner
7.0 (0.71, 62) *
2
*1 Camshaft bracket 1) 2.0 (0.2, 1)
2) 5.9 (0.6, 4)
3) 10.4 (1.1, 8)
Crankshaft pulley 1) 42.1 (4.3, 31)
2) 60° (Angle tightening)
*1 Front cover 12.8 (1.3, 9)
Timing chain slack guide 16.7 (1.7, 12)
Timing chain tension guide 16.7 (1.7, 12)
Balancer unit timing chain tensioner
7.0 (0.71, 62) *
2
*1 Balancer unit 1) 48.1 (4.9, 35)
2) 90° (Angle tightening)
3) 0 (0, 0)
4) 48.1 (4.9, 35)
5) 90° (Angle tightening)
*1 Cylinder head 1) 50 (5.1, 37)
2) 60° (Angle tightening)
3) 0 (0.0, 0)
3) 39.2 (4.0, 29)
4) 75° (Angle tightening)
5) 75° (Angle tightening)
Flywheel (M/T)108 (11, 80)
Drive plate (A/T)108 (11, 80)
Connecting rod bearing cap 1) 19.6 (2.0, 14)
2) 90° (Angle tightening)
*1 Lower cylinder block M8 bolt 1) 25.1 (2.6, 19)
M10 bolt 2) 39.2 (4.0, 29)
M10 bolt 3) 60° (Angle tightening)
Signal plate18.5 (1.9, 14)
Water drain plug
9.8 (1.0, 87) *
2
Page 184 of 4555
![NISSAN X-TRAIL 2005 Service Repair Manual EM-130
[YD22DDTi]
PRECAUTIONS
[YD22DDTi]PRECAUTIONSPFP:00001
Precautions for Draining Engine CoolantEBS00LQZ
Drain engine coolant when engine is cooled.
Precautions for Disconnecting Fuel PipingEBS0 NISSAN X-TRAIL 2005 Service Repair Manual EM-130
[YD22DDTi]
PRECAUTIONS
[YD22DDTi]PRECAUTIONSPFP:00001
Precautions for Draining Engine CoolantEBS00LQZ
Drain engine coolant when engine is cooled.
Precautions for Disconnecting Fuel PipingEBS0](/manual-img/5/57403/w960_57403-183.png)
EM-130
[YD22DDTi]
PRECAUTIONS
[YD22DDTi]PRECAUTIONSPFP:00001
Precautions for Draining Engine CoolantEBS00LQZ
Drain engine coolant when engine is cooled.
Precautions for Disconnecting Fuel PipingEBS00LR0
Before starting work, make sure no fire or spark producing items are in the work area.
After disconnecting pipes, plug openings to stop fuel leakage.
Precautions for Removal and DisassemblyEBS00LR1
When instructed to use special service tools, use the specified tools. Always be careful to work safely,
avoid forceful or uninstructed operations.
Exercise maximum care to avoid damage to mating or sliding surfaces.
Cover openings of engine system with tape or the equivalent, if necessary, to seal out foreign materials.
Mark and arrange disassembly parts in an organized way for easy troubleshooting and re-assembly.
When loosening nuts and bolts, as a basic rule, start with the one furthest outside, then the one diagonally
opposite, and so on. If the order of loosening is specified, do exactly as specified.
Precautions for Inspection, Repair and ReplacementEBS00LR2
Before repairing or replacing, thoroughly inspect parts. Inspect new replacement parts in the same way, and
replace if necessary.
Precautions for Assembly and InstallationEBS00LR3
Use torque wrench to tighten bolts or nuts to specification.
When tightening nuts and bolts, as a basic rule, equally tighten in several different steps starting with the
ones in center, then ones on inside and outside diagonally in this order. If the order of tightening is speci-
fied, do exactly as specified.
Replace with new liquid gasket, packing, oil seal or O-ring.
Dowel pins are used for several parts alignment. When replacing and reassembling parts with dowel pins,
make sure that dowel pins are installed in the original position.
Thoroughly wash, clean, and air-blow each part. Carefully check engine oil or engine coolant passages for
any restriction and blockage.
Avoid damaging sliding or mating surfaces. Completely remove foreign materials such as cloth lint or dust.
Before assembly, engine oil sliding surfaces well.
Release air within route when refilling after draining coolant.
After repairing, start engine and increase engine speed to check engine coolant, fuel, engine oil, and
exhaust systems for leakage.
Parts Requiring Angle TighteningEBS00LR4
Use an angle wrench (special service tool: KV10112100) for the final tightening of the following engine
parts:
–Cylinder head bolts
–Main bearing cap bolts
–Connecting rod cap nuts
–Crankshaft pulley bolt (No angle wrench is required as the bolt flange is provided with notches for angle
tightening)
Do not use a torque value for final tightening.
The torque value for these parts are for a preliminary step.
Ensure thread and seat surfaces are clean and coated with engine oil.
Page 186 of 4555
EM-132
[YD22DDTi]
PREPARATION
PREPARATIONPFP:00002
Special Service ToolsEBS00LR6
Tool number
Tool nameDescription
ST0501S000
Engine stand assembly
1. ST05011000
Engine stand
2. ST05012000
BaseDisassembling and assembling
KV10106500
Engine stand shaft
KV11105900
Engine sub-attachmentUsed with KV10106500
KV10115600
Valve oil seal driftInstalling valve oil seal
Use side A.
Side A
a: 20 (0.79) dia.
b: 13 (0.51) dia.
c: 10.3 (0.406) dia.
d: 8 (0.31) dia.
e: 10.7 (0.421)
f: 5 (0.20)
Unit: mm (in)
KV10107902
Valve oil seal puller
1. KV10116100
Valve oil seal puller adapterRemoving valve oil seal
KV11103000
Pulley pullerRemoving crankshaft pulley
ED19600610
Compression gauge adapterChecking compression pressure
NT042
NT028
NT799
NT603
S-NT605
NT676
ZZA1188D