Page 53 of 223
Downloaded from www.Manualslib.com manuals search engine 47
ENGINE
B1BP27EC
AUXILIARY EQUIPMENT DRIVE BELT
Engine: ES9A
Tools.
[1] Ratchet spanner S.171 FACOM (1/2 square): S 171
[2]Reduction box S.230 FACOM (1/2 - 3/8): S 230
Removing.
Remove the engine cover.
Pivot the tensioner roller bracket (1)clockwise, until it locks,
using tools [1]and [2]at «a».
Remove the auxiliary equipment drive belt.
ESSENTIAL: Check that the guide rollers are turning freely
(no play and no tightness).
Refitting.
Refit the auxiliary equipment drive belt.
Respect the following order of assembly:
- The crankshaft pulley (2).
- The tensioner roller (3).
Release the tensioner roller bracket (1), by turning it anti-clockwise,
using tools [1]and [2].
ESSENTIAL: Make sure that the belt is correctly positioned in
the grooves of the various pulleys.
B1BP27FC
Angl-C6-page022-82-2005 4/02/05 17:19 Page 47
Page 55 of 223
Downloaded from www.Manualslib.com manuals search engine 49
ENGINE
B1BP3BVC
AUXILIARY EQUIPMENT DRIVE BELT
Engine: DT17BTED4
Refitting.
WARNING: If re-using the auxiliary equipment drive belt, refit it respecting its direction of
fitting.
Fit the auxiliary equipment drive belt.
ESSENTIAL: Make sure that the auxiliaries drive belt is correctly positioned in the
grooves of the various pulleys.
Refit:
- The dynamic tensioner roller (1)by engaging the belt on the roller.
- The screws (2)and (4).
Tighten:
- Screw (2) : 5 ± 0,5.
- Screw (4) : 2,3 ± 0,2.
Compress the dynamic tensioner roller.
Remove tool [1].
ESSENTIAL: Make sure that the auxiliaries drive belt is correctly positioned in the
grooves of the various pulleys.
Refit:
- The air duct(linking the air distributor heat exchanger).
- The RH splash-shield.
- The front RH wheel.
- The under-engine sound-deadening.
Angl-C6-page022-82-2005 4/02/05 17:19 Page 49
Page 57 of 223
Downloaded from www.Manualslib.com manuals search engine 51
ENGINE
51
CHECKING THE VALVE TIMING
Engine: ES9A
Tools.
[1]Camshaft setting pegs: (-).0187.B
[2]Crankshaft setting peg: (-).0187.A
[3]Fuel pressure take-off union: 4192-T
[4]Belt retaining pin: (-).0187.J
[5]Exhaust camshaft hubs immobilising tool: (-).0187.F
[6]Inlet camshaft hubs immobilising tool: FACOM D12
[7]SEEM belt tension measuring equipment: 4122-T
Remove components as necessary for this operation.
Remove the auxiliaries drive belt (see corresponding operation).
Checking the valve timing.
Remove:
- The power steering pulley.
- The roller/dynamic tensioner assembly (11).
- The crankshaft pulley (12).
- The upper timing covers (9)and (10).
- The lower timing cover (13).
B1BP2BKC
Angl-C6-page022-82-2005 4/02/05 17:19 Page 51
Page 60 of 223

Downloaded from www.Manualslib.com manuals search engine 54
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: ES9A
Setting the valve timing (continued).
Refitting.
Check that the camshafts and the crankshaft are correctly pegged.
Check that the rollers and the coolant pump pulley are turning freely (no tightness).
Loosen the camshaft pulley screws by a 1/4 turn.
Make sure that the pulleys are turning freely on the camshaft hub.
Turn the camshaft pulleys in a clockwise direction, to end of slots.
WARNING: Respect the direction of fitting of the belt: Facing the timing, the inscriptions on
the belt should be readable the correct way up.
Fit the timing belt on the crankshaft pinion.
Position the tool [6].
Position the timing belt in the following sequence (belt well tensioned):
- The roller (26), the pulley (18), the pulley (17).
WARNING: Keep the timing belt well tensioned.
- Refit the guide roller (16), tighten to 8 ± 0,8 m.daN.
Position the timing in the following sequence:
- The camshaft pulleys (15)and (14), the tensioner roller (24), the coolant pump pulley and the
guide roller (27).
NOTE: When positioning the belt on the camshaft pulleys, turn these clockwise so as to engage the
next tooth. The angular displacement of the pulleys should not be more than the equivalent of one
tooth.
B1EP15VDB1BP2BLC
Angl-C6-page022-82-2005 4/02/05 17:19 Page 54
Page 63 of 223

Downloaded from www.Manualslib.com manuals search engine 57
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: ES9A
Tensioning the timing belt.
Act on the tensioner roller (24)so as to align the marks «c»and «d», without detensioning the timing belt
(failing this, restart the operation of adjusting the belt tension).
Hold the tensioner roller (24).
Tighten the nut (23), tighten to 1 ± 0,1 m.daN.
Check the position of the tensioner roller (the alignment of the marks «c»and «d»should be correct).
Remove the tools [1], [2]and [4].
Turn the crankshaft 2 rotationsclockwise.
IMPERATIVE: Never turn it back.
Peg the crankshaft, using tool [2].
Check the position of the tensioner roller (the alignment of the marks «c»and «d»should be correct).
Peg the camshaft pulleys, using tool [1].
If the peg [1]goes in: Loosen the exhaust camshaft pulley screws by 45°.
If the peg [1]does not go in: Slacken the exhaust camshaft pulley screws by 45°.
Bring the exhaust camshaft hub to the pegging position (5), using tool [5].
WARNING: Check that the exhaust camshaft pulleys are not at the end of slots. Otherwise, restart
the operation to position the timing belt.
Tighten the exhaust camshaft pulley screws to 1 ± 0,1 m.daN.
Remove tools[1] and [2].
Complete the refitting.
Initialise the injection ECU (see corresponding operation).
B1EP15XC
Angl-C6-page022-82-2005 4/02/05 17:19 Page 57
Page 64 of 223
![CITROEN C6 2005 Owners Manual Downloaded from www.Manualslib.com manuals search engine 58
ENGINE
CHECKING THE VALVE TIMING
Engine: DT17BTED4
Tools.
[1]Set of plugs: (-).0188-T
[2]Flywheel setting peg (double flywheel): (-).0195.K CITROEN C6 2005 Owners Manual Downloaded from www.Manualslib.com manuals search engine 58
ENGINE
CHECKING THE VALVE TIMING
Engine: DT17BTED4
Tools.
[1]Set of plugs: (-).0188-T
[2]Flywheel setting peg (double flywheel): (-).0195.K](/manual-img/9/57744/w960_57744-63.png)
Downloaded from www.Manualslib.com manuals search engine 58
ENGINE
CHECKING THE VALVE TIMING
Engine: DT17BTED4
Tools.
[1]Set of plugs: (-).0188-T
[2]Flywheel setting peg (double flywheel): (-).0195.K Toolkit 0188-T
[3]Camshaft setting pegs: (-).0195.H Toolkit 0188-T
Checks.
IMPERATIVE: Respect the safety and cleanliness requirements specific to High pressure
Diesel injection (HDi) engines.
Remove the engine cover.
Disconnect the battery negative terminal.
Raise and support the front of the vehicle.
Remove:
- The under-engine sound-deadening.
- The front RH wheel.
- The front RH splash-shield (see corresponding operation).
Remove:
- The air duct between the air/air exchanger and the air inlet housing (4).
- The air inlet housing (4).
Uncouple, plug and move aside the pipes (2)and (3), using tools [1].
Unclip and move aside the electrical harness.
Remove the venting chamber fixing (1).
Move aside the venting chamber (1).
B1BP3BXD
Angl-C6-page022-82-2005 4/02/05 17:19 Page 58
Page 65 of 223
Downloaded from www.Manualslib.com manuals search engine 59
ENGINE
CHECKING THE VALVE TIMING
Engine: DT17BTED4
Remove:
- The auxiliary drive belt (5)(see corresponding operation).
- The upper timing covers (6).
Position the camshaft pegging holes "a"and "b"at "c"and "d", 30° ± 5°forward of their pegging
holes "e"and "f".
NOTE:Turn the crankshaft in the normal direction of rotation, by means of the crankshaft pinion
screw.
B1EP1J9DB1EP1JAD
Angl-C6-page022-82-2005 4/02/05 17:19 Page 59
Page 66 of 223

Downloaded from www.Manualslib.com manuals search engine 60
ENGINE
CHECKING THE VALVE TIMING
Engine: DT17BTED4
Remove the plug from the pegging hole on the cylinder block.
NOTE:Removing the particle filter and catalytic converter flexible pipe assembly facilitates removal
of the plug from the pegging hole and the positioning of the tool [2].
NOTE:Turn the crankshaft in the normal direction of rotation, by means of the crankshaft pinion
screw.
Peg the crankshaft, using tool [2].
Peg the camshafts, using tools [3].
IMPERATIVE: If it is not possible to peg the camshafts, restart the setting of the valve timing
(see corresponding operation).
Remove the tools [2]and [3].
Refit the plug on the pegging hole on the cylinder block.
Refit:
- The upper timing covers (6).
- The auxiliary drive belt (5)(see corresponding operation).
Reclip the electrical harness.
Fit the venting chamber (1).
Remove the tools [1].
Reposition and connect the pipes (2)and (3).
Complete the refitting.
B1DP1MOCB1EP1JBD
Angl-C6-page022-82-2005 4/02/05 17:19 Page 60