Page 266 of 462

Downloaded from www.Manualslib.com manuals search engine 260
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: WJY
B1BP2FTC
Setting the timing.
Removing.
Disconnect the battery.
Remove the front RH lower splash-shield, using tool [1].
Remove the accessories drive belt
(see corresponding operation).Uncouple and plug the diesel fuel delivery and return hoses.
Support the engine, using a workshop hoist.
Remove the RH engine support.
Engage 5th gearto permit rotation of the engine.
Remove the upper cover (1).
Remove the intermediate cover (2).
Remove the lower cover (3).
WARNING: Refit the screw (4) equipped with a washer
(5 mm thick).
Rotate the front RH wheel to drive the engine in its normal direction of
rotation.
Bring the camshaft drive and injection pump pinions to their setting
points.
Position the peg [2]
(from underneath the vehicle).
Continue turning the engine until the peg [2]engages in the flywheel.
B1BP30BC
XSARA
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 260
Page 269 of 462

Downloaded from www.Manualslib.com manuals search engine 263
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: WJY
Setting the timing (continued).
Tighten:
- Screw (9)to 2.1 ± 0.2 m.daN.
- Screws (5)to 2,3 ± 0.2 m.daN.
- Screws (6)to 2,3 ± 0.2 m.daN.
- Remove and refit tool [7].
- The tension value should be between 38 and 46 SEEMunits.
- Remove tools [7], [2], [3]and [4].
- Turn the crankshaft 2 times
in the normal direction of rotation.
- Peg the flywheel, using the peg [2].
- Visually check the peggings of the camshaft and injection pump.
ESSENTIAL: Visually check that the offsets between the holes of
the camshaft and injection pump hubs and the corresponding
pegging holes are not more than 1 mm. If necessary, recommence
the procedure for fitting the timing belt.
XSARA
Setting the timing (continued).
Remove the peg [2].
Remove the screw (4)and the washer.
Refit the lower cover (3).
Refit the intermediate cover (2).
Refit the upper cover (1).
Remove the RH engine support.
Take away the workshop hoist.
Remove the plugs and recouple the diesel fuel delivery and return
hoses.
Refit the accessories drive belt
(see corresponding operation).
Refit the RH lower splash-shield.
Disengage 5th gear.
Connect the battery.
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 263
Page 272 of 462
Downloaded from www.Manualslib.com manuals search engine 266
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY - RHZ
Remove:
- The fixings of the pipe linking the power steering pump with the rotary valve.
- The clutch lower closing plate.
- Lock the engine flywheel, using tool [6].
Remove the screw (8).
Refit the screw (8)without its thrust washer.
Remove:
- The accessories pulley (9), using tool [8].
- Tool [6].
- The lower torque reaction rod.
Support the engine by means of a workshop hoist.
Remove:
- The bearing shell fitting (10).
- The nut (12).
- Screws (11).
- The bracket (13).
NOTE:Lift then lower the engine with the workshop hoist, to have access to the
timing cover fixing screws.
Remove:
- The intermediate timing cover.
- The lower timing cover.
B1CP04BCB1BP2R3CB1BP2R4C
XSARA - XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 266
Page 276 of 462
![Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 270
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY - RHZ
Remove:
- Tools [3]and [5], Screw (7)and the spacer.
Refit:
- The lower, i Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 270
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY - RHZ
Remove:
- Tools [3]and [5], Screw (7)and the spacer.
Refit:
- The lower, i](/manual-img/9/4138/w960_4138-275.png)
Downloaded from www.Manualslib.com manuals search engine 270
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY - RHZ
Remove:
- Tools [3]and [5], Screw (7)and the spacer.
Refit:
- The lower, intermediate and upper covers (5).
- Screw (7), tighten to 1,5 ± 0,1 m.daN.
- Screws (3), (4)and (6).
- The bracket (13).
Screws (11), tighten to 6,1 ± 0,5 m.daN.
The nut (12), tighten to 4,5 ± 0,5 m.daN.
Fit the bearing shell (10).
Take away the workshop hoist.
Clip the fuel delivery and return pipes.
Remove the tool [7].
Couple:
- The fuel delivery pipe (12).
- The fuel return pipe (1).
- Coat the screw (8)with loctite FRENETANCH.
Refit the tool [6]and the screw (8)with the washer (22), tighten to 7 ± 0,2 m.daN
and angular tighten to A= 60°±5°.
Refit the torque reaction rod on the lower engine support.
Remove the tool [6].
Reposition and reclip the cooling hose.
Complete the refitting of components in reverse order to removal.
B1EP1A7CB1BP2R4CB1EP1ADC
XSARA - XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 270
Page 284 of 462
Downloaded from www.Manualslib.com manuals search engine 278 278
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Refitting.
IMPERATIVE: If the position of the index «d» is not correct, restart the operations to tension
the timing belt
(for this, slightly slacken the screw (12) of the tensioner roller).
Refit tool [6].
Remove the auxiliaries drive pulley (7).
Refit:
- The crankshaft position sensor target (10).
- The lower timing cover (9).
- The crankshaft position sensor (11).
- The lower torque reaction rod.
Take away the workshop hoist.
Coat the screw (8)with Loctite FRENETANCH.
Refit the auxiliaries drive pulley (7) and the screw (8)with its washer.
Tighten the screw (8)to 7 ± 0,7 m.daN, then angular tighten by A= 60°±5°.
Remove tools [2], [3] and [6].
Complete the refitting.
B1EP1FKC
B1EP1FLC
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 278