Downloaded from www.Manualslib.com manuals search engine 265
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY - RHZ
Uncouple, plug and move aside, using tool [7], the fuel delivery pipe(2)and return
pipe (1).
Remove:
- Screws (3), (4)and (6).
- Screw (7).
- The upper timing cover (5).
WARNING: Refit screw (7) equipped with a spacer
(17 mm thick), tighten the
screw (7) to 1,5 ± 0,1 m. daN.
NOTE: The screw (7)is one of the screws securing the coolant pump and is there
for its sealing.
Put the gear lever in 5th gear.
Turn the road wheel to turn the engine in its direction of rotation.
Orient the camshaft pulley in the pegging position, use a mirror if necessary.
Peg the camshaft, using tool [5].
Peg the engine flywheel, using tool [3].
B1EP1A7CB1BP2H3CB1BP2H2CB1BP2R2C
XSARA - XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 265
Downloaded from www.Manualslib.com manuals search engine 274
ENGINE
274
CHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Uncouple, plug and move aside, using tool [7],
the fuel delivery pipe (1)and the fuel return pipe (2).
Suspend the engine, using a workshop hoist.
Remove the bracket (3)and the RH engine
support (4).
Move aside the electrical harness (5).
Remove:
- The upper timing cover screws.
- The upper timing cover (6).
Rotate the engine by means of the auxiliaries drive
pulley.
Orient the camshaft pinion in the pegging position,
use a mirror if necessary.
Peg the camshaft, using tool [3].
Peg the engine flywheel, using tool [2].
Lock the flywheel, using tool [6].
B1BP351C
B1EP1FAC
B1EP1FBC
B1BP31EC
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 274