The power grounds are used to control the ground
side relays, solenoids, ignition coil or injectors. The
signal ground is used for any input that uses sensor
return for ground, and the ground side of any inter-
nal processing component.
The PCM case is shielded to prevent RFI and EMI.
The PCM case is grounded and must be firmly
attached to a good, clean body ground.
Internally all grounds are connected together, how-
ever there is noise suppression on the sensor ground.
For EMI and RFI protection the housing and cover
are also grounded separately from the ground pins.
OPERATION - 5 VOLT SUPPLY - PCM OUTPUT
The PCM supplies 5 volts to the following sensors:
²A/C pressure transducer
²Ambient Temperature sensor
²Battery temperature
²Camshaft Position Sensor (NGC)
²Crankshaft Position Sensor (NGC)
²Engine coolant temperature sensor
²Inlet Air Temperature Sensor
²Knock sensor
²Linear EGR solenoid (if equipped)
²Manifold absolute pressure sensor
²Oil Pressure Switch
²Throttle position sensor
STANDARD PROCEDURE
STANDARD PROCEDURE - OBTAINING
DIAGNOSTIC TROUBLE CODES
BULB CHECK
Key on: Bulb illuminated until vehicle starts, as
long as all once per trip (readiness) monitors com-
pleted. If monitors havenotbeen completed, then:
Key on: bulb check for about 5 to 8 seconds, lamp
then flashes if once per trip (readiness) monitors
havenotbeen completed until vehicle is started,
then MIL is extinguished.
OBTAINING DTC'S USING DRB SCAN TOOL
(1) Connect the DRB scan tool to the data link
(diagnostic) connector. This connector is located in
the passenger compartment; at the lower edge of
instrument panel; near the steering column.
(2) Turn the ignition switch on and access the
ªRead Faultº screen.
(3) Record all the DTC's and ªfreeze frameº infor-
mation shown on the DRB scan tool.
(4) To erase DTC's, use the ªErase Trouble Codeº
data screen on the DRB scan tool.Do not erase any
DTC's until problems have been investigated
and repairs have been performed.
STANDARD PROCEDURE - PINION FACTOR
SETTING
NOTE: This procedure must be performed if the
PCM has been replaced with a NEW or replacement
unit. Failure to perform this procedure will result in
an inoperative or improperly calibrated speedome-
ter.
The vehicle speed readings for the speedometer are
taken from the output speed sensor. The PCM must
be calibrated to the different combinations of equip-
ment (final drive and tires) available. Pinion Factor
allows the technician to set the Powertrain Control
Module initial setting so that the speedometer read-
ings will be correct. To properly read and/or reset the
Pinion Factor, it is necessary to use a DRBIIItscan
tool.
(1) Plug the DRBIIItscan tool into the diagnostic
connector located under the instrument panel.
(2) Select the Transmission menu.
(3) Select the Miscellaneous menu.
(4) Select Pinion Factor. Then follow the instruc-
tions on the DRBIIItscan tool screen.
STANDARD PROCEDURE - QUICK LEARN
PROCEDURE
The quick learn procedure requires the use of the
DRBIIItscan tool. This program allows the PCM to
recalibrate itself. This will provide the best possible
transaxle operation.
NOTE: The quick learn procedure should be per-
formed if any of the following procedures are per-
formed:
²Transaxle Assembly Replacement
²Powertrain Control Module Replacement
²Solenoid/Pressure Switch Assembly Replacement
²Clutch Plate and/or Seal Replacement
²Valve Body Replacement or Recondition
To perform the Quick Learn Procedure, the follow-
ing conditions must be met:
²The brakes must be applied
²The engine speed must be above 500 rpm
²The throttle angle (TPS) must be less than 3
degrees
²The shift lever position must stay until
prompted to shift to overdrive
²The shift lever position must stay in overdrive
after the Shift to Overdrive prompt until the
DRBIIItindicates the procedure is complete
²The calculated oil temperature must be above
60É and below 200É
RSELECTRONIC CONTROL MODULES8E-15
POWERTRAIN CONTROL MODULE (Continued)
INSTALLATION - 3.3/3.8L
(1) Install coil over studs on bracket.
(2) Install 2 nuts to the ignition coil studs. Tighten
nuts and bolts.
(3) Connect the electrical connector to the ignition
coil.
(4) Install the ignition cables to the ignition coil.
(5) Reposition the Power steering reservoir. Slide
bracket over the mounting stud (Fig. 11).
(6) Install 2 bolts to the Power steering reservoir
to intake manifold.
(7) Tighten the lower nut to stud on ignition coil
bracket.
(8) Install the throttle and speed control cables to
clip.
(9) Connect the negative battery cable.
KNOCK SENSOR
DESCRIPTION
The knock sensor threads into the cylinder block.
The knock sensor is designed to detect engine vibra-
tion that is caused by detonation.
OPERATION
When the knock sensor detects a knock in one of
the cylinders, it sends an input signal to the PCM. In
response, the PCM retards ignition timing for all cyl-
inders by a scheduled amount.
Knock sensors contain a piezoelectric material
which constantly vibrates and sends an input voltage
(signal) to the PCM while the engine operates. As the
intensity of the crystal's vibration increases, the
knock sensor output voltage also increases.
The voltage signal produced by the knock sensor
increases with the amplitude of vibration. The PCM
receives as an input the knock sensor voltage signal.
If the signal rises above a predetermined level, the
PCM will store that value in memory and retard
ignition timing to reduce engine knock. If the knock
sensor voltage exceeds a preset value, the PCM
retards ignition timing for all cylinders. It is not a
selective cylinder retard.
The PCM ignores knock sensor input during engine
idle conditions. Once the engine speed exceeds a
specified value, knock retard is allowed.
Knock retard uses its own short term and long
term memory program.
Long term memory stores previous detonation
information in its battery-backed RAM. The maxi-
mum authority that long term memory has over tim-
ing retard can be calibrated.
Short term memory is allowed to retard timing up
to a preset amount under all operating conditions (as
long as rpm is above the minimum rpm) except WOT.The PCM, using short term memory, can respond
quickly to retard timing when engine knock is
detected. Short term memory is lost any time the
ignition key is turned off.
NOTE: Over or under tightening affects knock sen-
sor performance, possibly causing improper spark
control.
REMOVAL
REMOVAL - 2.4L
The knock sensor threads into the side of the cyl-
inder block in front of the starter (Fig. 12).
(1) Disconnect electrical connector from knock sen-
sor.
(2) Use a crow foot socket to remove the knock
sensors.
REMOVAL - 3.8L
The knock sensor threads into the side of the cyl-
inder block in the rear.
(1) Disconnect the negative battery cable.
(2) Raise vehicle and support.
(3) On All Wheel Drive vehicles remove the PTU
(Power Transfer Unit), refer to the Transmission sec-
tion for more information.
(4) Disconnect electrical connector from knock sen-
sor.
(5) Use a crow foot socket to remove the knock
sensor.
INSTALLATION
INSTALLATION - 2.4L
The knock sensor threads into the side of the cyl-
inder block in front of the starter (Fig. 12).
(1) Install knock sensor. Tighten knock sensor to
10 N´m (7 ft. lbs.) torque.Over or under tighten-
ing effects knock sensor performance, possibly
causing improper spark control.
(2) Attach electrical connector to knock sensor.
INSTALLATION - 3.8L
The knock sensor threads into the side of the cyl-
inder block in the rear.
(1) Install knock sensor. Tighten knock sensor to
10 N´m (7 ft. lbs.) torque.Over or under tighten-
ing effects knock sensor performance, possibly
causing improper spark control.
(2) Attach electrical connector to knock sensor.
(3) On All Wheel Drive vehicles install the PTU
(Power Transfer Unit) for the rear wheels, refer to
the Transmission section for more information.
8I - 8 IGNITION CONTROLRS
IGNITION COIL (Continued)
INDEX
ABS FASTENER TORQUE,SPECIFICATIONS ...................... 5-91
ABSORBER - DESCRIPTION, SHOCK .......2-36
ABSORBER - INSTALLATION, SHOCK ......2-38
ABSORBER - OPERATION, SHOCK ........2-36
ABSORBER - REMOVAL, SHOCK ..........2-36
ABSORBER (UPPER BUSHING) - ASSEMBLY, SHOCK .................... 2-37
ABSORBER (UPPER BUSHING) - DISASSEMBLY, SHOCK .................2-37
A/C CLUTCH BREAK-IN, STANDARD PROCEDURE ........................ 24-15
A/C COMPRESSOR CLUTCH COIL, DIAGNOSIS AND TESTING .............24-14
A/C COMPRESSOR CLUTCH RELAY - DESCRIPTION ....................... 24-18
A/C COMPRESSOR CLUTCH RELAY - INSTALLATION ....................... 24-19
A/C COMPRESSOR CLUTCH RELAY - OPERATION ......................... 24-18
A/C COMPRESSOR CLUTCH RELAY - REMOVAL .......................... 24-19
A/C COMPRESSOR CLUTCH/COIL - DESCRIPTION ....................... 24-13
A/C COMPRESSOR CLUTCH/COIL - OPERATION ......................... 24-13
A/C COMPRESSOR, DESCRIPTION .......24-72
A/C COMPRESSOR, INSTALLATION .......24-74
A/C COMPRESSOR MOUNTING BRACKET, 2.4L ENGINE ...........24-74,24-75
A/C COMPRESSOR NOISE DIAGNOSIS, DIAGNOSIS AND TESTING .............24-72
A/C COMPRESSOR, OPERATION .........24-72
A/C COMPRESSOR, REMOVAL ..........24-73
A/C CONDENSER - DESCRIPTION ........24-75
A/C CONDENSER - OPERATION ..........24-75
A/C COOL DOWN TEST, DIAGNOSIS AND TESTING ............................ 24-6
A/C DISCHARGE LINE - INSTALLATION . . . 24-80
A/C DISCHARGE LINE - REMOVAL .......24-79
A/C EVAPORATOR - DESCRIPTION . . 24-80,24-98
A/C EVAPORATOR - INSTALLATION ......24-81
A/C EVAPORATOR - OPERATION ....24-80,24-98
A/C EVAPORATOR - REMOVAL ..........24-81
A/C EVAPORATOR, INSTALLATION - REAR ............................. 24-100
A/C EVAPORATOR LINE EXTENSION, INSTALLATION - REAR ...............24-100
A/C EVAPORATOR LINE EXTENSION, REMOVAL - REAR .................... 24-99
A/C EVAPORATOR, REMOVAL - REAR .....24-98
A/C EXPANSION VALVE - DESCRIPTION . . 24-100
A/C EXPANSION VALVE - OPERATION ....24-100
A/C EXPANSION VALVE, DIAGNOSIS AND TESTING - FRONT .................... 24-82
A/C EXPANSION VALVE, DIAGNOSIS AND TESTING - REAR .................... 24-101
A/C HEATER CONTROL - DESCRIPTION . . . 24-19
A/C PERFORMANCE TEST, DIAGNOSIS AND TESTING ........................ 24-7
A/C PRESSURE TRANSDUCER - DESCRIPTION ....................... 24-20
A/C PRESSURE TRANSDUCER - OPERATION ......................... 24-20
A/C PRESSURE TRANSDUCER, DIAGNOSIS AND TESTING .............24-21
A/C SYSTEM - CAUTION ...............24-66
A/C SYSTEM, SPECIFICATIONS ..........24-11
A/C SYSTEM, WARNING ...............24-66
ACCELERATOR PEDAL - INSTALLATION . . . 14-28
ACCELERATOR PEDAL - REMOVAL .......14-28
ACCESSORY DRIVE BELT - DIAGNOSIS AND TESTING .........................7-7
ACCESSORY DRIVE BELT TENSION, SPECIFICATIONS .......................7-5
ACCUMULATOR - DESCRIPTION . . . 21-218,21-73
ACCUMULATOR - OPERATION ....21-218,21-73
A/C-HEATER CONTROL - DESCRIPTION . . . 24-33
A/C-HEATER CONTROL - INSTALLATION . . . 24-34
A/C-HEATER CONTROL - OPERATION .....24-33
A/C-HEATER CONTROL - REMOVAL ......24-33
A/C-HEATER CONTROL CALIBRATION, STANDARD PROCEDURE ...............24-19
ACTUATOR - DESCRIPTION, BLEND DOOR ........................ 24-22,24-34
ACTUATOR - DESCRIPTION, ENGAGE ......8N-9
ACTUATOR - DESCRIPTION, LATCH ......8N-13 ACTUATOR - DESCRIPTION, MODE
DOOR ............................. 24-29
ACTUATOR - DESCRIPTION, RECIRCULATION DOOR ................24-31
ACTUATOR - INSTALLATION, BLEND DOOR ........................ 24-22,24-35
ACTUATOR - INSTALLATION, ENGAGE ....8N-10
ACTUATOR - INSTALLATION, INSIDE HANDLE ............................ 23-27
ACTUATOR - INSTALLATION, LATCH .....8N-14
ACTUATOR - INSTALLATION, MODE DOOR ............................. 24-30
ACTUATOR - INSTALLATION, RECIRCULATION DOOR ................24-32
ACTUATOR - OPERATION, BLEND DOOR . . 24-22, 24-35
ACTUATOR - OPERATION, ENGAGE .......8N-9
ACTUATOR - OPERATION, LATCH ........8N-13
ACTUATOR - OPERATION, MODE DOOR . . . 24-29
ACTUATOR - OPERATION, RECIRCULATION DOOR ................24-31
ACTUATOR - REAR - DESCRIPTION, MODE DOOR ........................ 24-39
ACTUATOR - REAR - INSTALLATION, MODE DOOR ........................ 24-40
ACTUATOR - REAR - OPERATION, MODE DOOR ............................. 24-39
ACTUATOR - REAR - REMOVAL, MODE DOOR ............................. 24-39
ACTUATOR - REMOVAL, BLEND DOOR . . . 24-22, 24-35
ACTUATOR - REMOVAL, ENGAGE ..........8N-9
ACTUATOR - REMOVAL, INSIDE HANDLE . . 23-27
ACTUATOR - REMOVAL, LATCH .........8N-13
ACTUATOR - REMOVAL, MODE DOOR ....24-29
ACTUATOR - REMOVAL, RECIRCULATION DOOR ............................. 24-32
ADAPTER - INSTALLATION, FRONT DISC BRAKE CALIPER ...................... 5-31
ADAPTER - INSTALLATION, OIL FILTER . . . 9-142
ADAPTER - REMOVAL, FRONT DISC BRAKE CALIPER ...................... 5-31
ADAPTER - REMOVAL, OIL FILTER .......9-142
ADAPTIVE MEMORIES, OPERATION - FUEL CORRECTION OR ................14-24
ADDING ADDITIONAL COOLANT - STANDARD PROCEDURE .................7-4
ADDITIONAL COOLANT - STANDARD PROCEDURE, ADDING ...................7-4
ADHESIVE ATTACHED - INSTALLATION, EXTERIOR NAME PLATES ..............23-51
ADHESIVE ATTACHED - REMOVAL, EXTERIOR NAME PLATES ..............23-51
ADHESIVE LOCATIONS - FOLD-IN-FLOOR ONLY - SPECIFICATIONS,
STRUCTURAL ...................... 23-228
ADHESIVE LOCATIONS - SPECIFICATIONS, STRUCTURAL ........23-218
ADJUSTABLE - INSTALLATION, PEDALS ....5-43
ADJUSTABLE - REMOVAL, PEDALS .......5-40
ADJUSTABLE PEDALS SWITCH - INSTALLATION ........................ 5-11
ADJUSTABLE PEDALS SWITCH - REMOVAL ........................... 5-11
ADJUSTE R-BOR C-PILLAR -
INSTALLATION, SEAT BELT HEIGHT ......8O-38
ADJUSTE R-BOR C-PILLAR -
REMOVAL, SEAT BELT HEIGHT ..........8O-38
ADJUSTER - DIAGNOSIS AND TESTING, DRUM BRAKE AUTOMATIC ..............5-14
ADJUSTER - INSTALLATION, FRONT SEAT TRACK MANUAL ...............23-126
ADJUSTER - INSTALLATION, FRONT SEAT TRACK POWER ................23-124
ADJUSTER - REMOVAL, FRONT SEAT TRACK MANUAL .................... 23-125
ADJUSTER - REMOVAL, FRONT SEAT TRACK POWER ..................... 23-124
ADJUSTER KNOB - INSTALLATION, SEAT BELT HEIGHT ....................... 8O-38
ADJUSTER KNOB - REMOVAL, SEAT BELT HEIGHT ....................... 8O-38
ADJUSTER NOISE DIAGNOSIS - DIAGNOSIS AND TESTING, HYDRAULIC
LASH ............................... 9-34
ADJUSTER TENSION RELEASE - STANDARD PROCEDURE, PARKING
BRAKE AUTOMATIC .................... 5-63ADJUSTER TENSION RESET -
STANDARD PROCEDURE, PARKING
BRAKE AUTOMATIC .................... 5-64
ADJUSTER/MANUAL - OCS - INSTALLATION, FRONT SEAT TRACK ....23-128
ADJUSTER/MANUAL - OCS - REMOVAL, FRONT SEAT TRACK .................23-126
ADJUSTER/POWER - OCS - INSTALLATION, FRONT SEAT TRACK ....23-125
ADJUSTER/POWER - OCS - REMOVAL, FRONT SEAT TRACK .................23-124
ADJUSTERS - INSTALLATION, HYDRAULIC LASH ..................... 9-35
ADJUSTERS - REMOVAL, HYDRAULIC LASH ............................... 9-35
AERATION - DIAGNOSIS AND TESTING, COOLING SYSTEM .....................7-4
AFTER AN AIRBAG DEPLOYMENT - STANDARD PROCEDURE, SERVICE .......8O-7
AIR CLEANER ELEMENT - INSTALLATION . 9-101, 9-24
AIR CLEANER ELEMENT - REMOVAL . 9-101,9-24
AIR CLEANER HOUSING - INSTALLATION . 9-102, 9-25
AIR CLEANER HOUSING - REMOVAL . 9-101,9-25
AIR CONDITIONER, DESCRIPTION - HEATER ............................. 24-1
AIR CONDITIONER, OPERATION - HEATER ............................. 24-4
AIR CONTROL MOTOR - DESCRIPTION, IDLE ............................... 14-33
AIR CONTROL MOTOR - INSTALLATION, IDLE ............................... 14-33
AIR CONTROL MOTOR - OPERATION, IDLE ............................... 14-33
AIR CONTROL MOTOR - REMOVAL, IDLE . . 14-33
AIR EXHAUSTER - DESCRIPTION, REAR QUARTER PANEL/FENDER ..............23-59
AIR EXHAUSTER - INSTALLATION, REAR QUARTER PANEL/FENDER ..............23-60
AIR EXHAUSTER - REMOVAL, REAR QUARTER PANEL/FENDER ..............23-59
AIR FILTER - DESCRIPTION ............24-42
AIR FILTER - INSTALLATION ............24-43
AIR FILTER - REMOVAL ...............24-42
AIR GAP, SPECIFICATIONS - WHEEL SPEED SENSOR ....................... 5-91
AIR INTAKE PIPE - INSTALLATION ......24-115
AIR INTAKE PIPE - REMOVAL ..........24-115
AIR OUTLETS - DESCRIPTION .....24-43,24-56
AIR OUTLETS - INSTALLATION ..........24-56
AIR OUTLETS - REMOVAL .............24-56
AIR PRESSURE TESTS - DIAGNOSIS AND TESTING, CLUTCH ...........21-153,21-8
AIR TEMPERATURE SENSOR - DESCRIPTION, INLET .................14-34
AIRBAG - DESCRIPTION, CURTAIN .......8O-12
AIRBAG - DESCRIPTION, DRIVER ........8O-16
AIRBAG - DESCRIPTION, KNEE BLOCKER . 8O-22
AIRBAG - DESCRIPTION, PASSENGER ....8O-30
AIRBAG - INSTALLATION, CURTAIN ......8O-16
AIRBAG - INSTALLATION, DRIVER .......8O-18
AIRBAG - INSTALLATION, KNEE BLOCKER .......................... 8O-23
AIRBAG - INSTALLATION, PASSENGER . . . 8O-32
AIRBAG - OPERATION, CURTAIN ........8O-13
AIRBAG - OPERATION, DRIVER .........8O-16
AIRBAG - OPERATION, KNEE BLOCKER . . . 8O-22
AIRBAG - OPERATION, PASSENGER ......8O-30
AIRBAG - REMOVAL, CURTAIN ..........8O-14
AIRBAG - REMOVAL, DRIVER ...........8O-17
AIRBAG - REMOVAL, KNEE BLOCKER ....8O-23
AIRBAG - REMOVAL, PASSENGER .......8O-30
AIRBAG DEPLOYMENT - STANDARD PROCEDURE, SERVICE AFTER AN ........8O-7
AIRBAG DISABLED INDICATOR - DESCRIPTION, PASSENGER ............8O-33
AIRBAG DISABLED INDICATOR - INSTALLATION, PASSENGER ...........8O-34
AIRBAG DISABLED INDICATOR - OPERATION, PASSENGER ..............8O-33
AIRBAG DISABLED INDICATOR - REMOVAL, PASSENGER ...............8O-34
AIRBAG SYSTEM - DIAGNOSIS AND TESTING ............................ 8O-6
AIRBAGS - STANDARD PROCEDURE, HANDLING .......................... 8O-6
RS INDEX1
Description Group-Page Description Group-Page Description Group-Page
PANEL TOP COVER - REMOVAL,INSTRUMENT ....................... 23-72
PANEL TOP PAD ASSEMBLY - INSTALLATION, INSTRUMENT ...........23-77
PANEL TOP PAD ASSEMBLY - REMOVAL, INSTRUMENT ....................... 23-77
PANEL/FENDER AIR EXHAUSTER - DESCRIPTION, REAR QUARTER .........23-59
PANEL/FENDER AIR EXHAUSTER - INSTALLATION, REAR QUARTER .........23-60
PANEL/FENDER AIR EXHAUSTER - REMOVAL, REAR QUARTER ............23-59
PANEL-THIRD ROW - FOLD-IN-FLOOR - INSTALLATION, BOTTOM OF SEAT
CUSHION PAN ...................... 23-152
PANEL-THIRD ROW - FOLD-IN-FLOOR - REMOVAL, BOTTOM OF SEAT
CUSHION PAN ...................... 23-152
PARK ASSIST DISPLAY - DESCRIPTION ....8B-3
PARK ASSIST DISPLAY - INSTALLATION . . . 8B-4
PARK ASSIST DISPLAY - OPERATION .....8B-3
PARK ASSIST DISPLAY - REMOVAL .......8B-4
PARK ASSIST MODULE - DESCRIPTION ....8B-4
PARK ASSIST MODULE - INSTALLATION . . . 8B-6
PARK ASSIST MODULE - OPERATION .....8B-5
PARK ASSIST MODULE - REMOVAL .......8B-5
PARK ASSIST SENSOR - DESCRIPTION ....8B-6
PARK ASSIST SENSOR - INSTALLATION . . . 8B-6
PARK ASSIST SENSOR - OPERATION ......8B-6
PARK ASSIST SENSOR - REMOVAL .......8B-6
PARK SWITCH - DIAGNOSIS AND TESTING, FAILED ..................... 8R-2
PARKING BRAKE - INSTALLATION, LEVER .............................. 5-76
PARKING BRAKE - INSTALLATION, SHOES .............................. 5-84
PARKING BRAKE - REMOVAL, LEVER ......5-75
PARKING BRAKE - REMOVAL, SHOES .....5-78
PARKING BRAKE AUTOMATIC ADJUSTER TENSION RELEASE - STANDARD
PROCEDURE ......................... 5-63
PARKING BRAKE AUTOMATIC ADJUSTER TENSION RESET - STANDARD
PROCEDURE ......................... 5-64
PARKING BRAKE CABLES - ADJUSTMENT ........................ 5-65
PARKING BRAKE INTERMEDIATE - INSTALLATION, CABLE .................5-69
PARKING BRAKE INTERMEDIATE - REMOVAL, CABLE ..................... 5-69
PARKING BRAKE LEVER AND FRONT CABLE - INSTALLATION ................5-77
PARKING BRAKE LEVER AND FRONT CABLE - REMOVAL .................... 5-77
PARKING BRAKE SHOES - ADJUSTMENT . . . 5-85
PARK/TURN SIGNAL LAMP - INSTALLATION ....................... 8L-18
PARK/TURN SIGNAL LAMP - REMOVAL . . . 8L-18
PARTS - DESCRIPTION, FFV REPLACEMENT ....................... 14-2
PASSENGER AIRBAG - DESCRIPTION ....8O-30
PASSENGER AIRBAG - INSTALLATION ....8O-32
PASSENGER AIRBAG - OPERATION ......8O-30
PASSENGER AIRBAG - REMOVAL ........8O-30
PASSENGER AIRBAG DISABLED INDICATOR - DESCRIPTION ............8O-33
PASSENGER AIRBAG DISABLED INDICATOR - INSTALLATION ............8O-34
PASSENGER AIRBAG DISABLED INDICATOR - OPERATION ..............8O-33
PASSENGER AIRBAG DISABLED INDICATOR - REMOVAL ...............8O-34
PASSENGER BENCH - INSTALLATION, SEAT BELT BUCKLE - SECOND ROW -
THREE ............................. 8O-40
PASSENGER BENCH - REMOVAL, SEAT BELT BUCKLE - SECOND ROW - THREE . . . 8O-40
PATTERNS - DIAGNOSIS AND TESTING, TIRE WEAR ......................... 22-16
PCM GROUND - OPERATION ...........8E-14
PCM INPUT - OPERATION, DATA BUS COMMUNICATION RECEIVE .............8E-14
PCM INPUT - OPERATION, IGNITION SENSE ............................. 8E-14
PCM INPUT - OPERATION, SENSOR RETURN ............................ 8E-14
PCM OUTPUT - OPERATION, 5 VOLT SUPPLY ............................ 8E-15PCM/SKIM PROGRAMMING - STANDARD
PROCEDURE ......................... 8E-1
PCV SYSTEM - DIAGNOSIS AND TESTING ........................... 25-18
PCV VALVE - DESCRIPTION ............25-18
PCV VALVE - OPERATION ..............25-18
PEDAL - INSTALLATION, ACCELERATOR . . . 14-28
PEDAL - REMOVAL, ACCELERATOR ......14-28
PEDAL TORQUE SHAFT - RHD - INSTALLATION ........................ 5-44
PEDAL TORQUE SHAFT - RHD - REMOVAL ........................... 5-44
PEDALS - ADJUSTABLE - INSTALLATION . . . 5-43
PEDALS - ADJUSTABLE - REMOVAL .......5-40
PEDALS SWITCH - INSTALLATION, ADJUSTABLE ......................... 5-11
PEDALS SWITCH - REMOVAL, ADJUSTABLE ......................... 5-11
PERFORMANCE - DIAGNOSIS AND TESTING, ENGINE DIAGNOSIS ........9-4,9-80
PERFORMANCE TEST, DIAGNOSIS AND TESTING - A/C ........................ 24-7
PERFORMANCE TEST, DIAGNOSIS AND TESTING - HEATER ................... 24-10
PIN BUSHINGS (CONTINENTAL TEVES BRAKES) - ASSEMBLY, CALIPER GUIDE ....5-25
PIN BUSHINGS (CONTINENTAL TEVES BRAKES) - DISASSEMBLY, CALIPER
GUIDE .............................. 5-24
PINCH SENSOR - DESCRIPTION .........8N-17
PINCH SENSOR - INSTALLATION ........8N-18
PINCH SENSOR - OPERATION ..........8N-17
PINCH SENSOR - REMOVAL ............8N-18
PINION FACTOR SETTING - STANDARD PROCEDURE ........................ 8E-15
PINS (TRW BRAKES) - INSTALLATION, DISC BRAKE CALIPER GUIDE ............5-32
PINS (TRW BRAKES) - REMOVAL, DISC BRAKE CALIPER GUIDE ................5-31
PIPE - 3.3/3.8L - INSTALLATION, CROSS-OVER ........................ 11-6
PIPE - 3.3/3.8L - REMOVAL, CROSS- OVER ............................... 11-6
PIPE - INSTALLATION, AIR INTAKE ......24-115
PIPE - REMOVAL, AIR INTAKE .........24-115
PIPES - INSTALLATION, HEATER ........24-120
PIPES - REMOVAL, HEATER ...........24-119
PISTON & CONNECTING ROD - DESCRIPTION ................... 9-119,9-44
PISTON & CONNECTING ROD - INSTALLATION ........................ 9-45
PISTON & CONNECTING ROD - REMOVAL ........................... 9-44
PISTON AND SEAL - ASSEMBLY, CALIPER ........................ 5-26,5-30
PISTON AND SEAL - DISASSEMBLY, CALIPER ........................ 5-24,5-28
PISTON RING, FITTING .................9-47
PISTON RING FITTING - STANDARD PROCEDURE ........................ 9-124
PISTON RINGS - INSTALLATION .........9-124
PISTON RINGS - REMOVAL ............9-124
PISTON TO CYLINDER BORE FITTING - STANDARD PROCEDURE ................9-44
PISTONS - STANDARD PROCEDURE, FITTING ............................ 9-120
PLANETARY GEARTRAIN - DESCRIPTION ................ 21-112,21-263
PLANETARY GEARTRAIN - OPERATION . . 21-112, 21-263
PLASTIC BODY PANEL REPAIR - STANDARD PROCEDURE ................23-3
PLASTIC GROCERY BAG RETAINER - INSTALLATION ...................... 23-149
PLASTIC GROCERY BAG RETAINER - REMOVAL ......................... 23-149
PLASTIGAGE - STANDARD PROCEDURE, MEASURING BEARING CLEARANCE
USING .......................... 9-12,9-86
PLATINUM PLUGS - DESCRIPTION ........8I-9
PLAYER - DESCRIPTION, DVD ..........8A-12
PLAYER - INSTALLATION, DVD ..........8A-12
PLAYER - REMOVAL, DVD .............8A-12
PLUG CABLE - DESCRIPTION, SPARK .....8I-10
PLUG CABLE RESISTANCE, SPECIFICATIONS - SPARK ...............8I-2
PLUG, SPECIFICATIONS - SPARK .........8I-2
PLUGS - DESCRIPTION, PLATINUM ........8I-9PLUGS - STANDARD PROCEDURE,
ENGINE CORE AND OIL GALLERY ....9-10,9-88
PLUMBING - FRONT - DESCRIPTION .....24-65
PLUMBING - FRONT - OPERATION .......24-65
POINTS - DESCRIPTION, LUBRICATION .....0-7
POLISHING - DESCRIPTION, FINESSE SANDING/BUFFING .................. 23-101
PORT REPAIR - STANDARD PROCEDURE, INTAKE MANIFOLD
VACUUM ........................... 9-148
PORT VALVE CORE - DESCRIPTION, SERVICE ........................... 24-95
PORT VALVE CORE - INSTALLATION, SERVICE ........................... 24-95
PORT VALVE CORE - REMOVAL, SERVICE ........................... 24-95
POSITION SENSOR - DESCRIPTION, CAMSHAFT ........................... 8I-4
POSITION SENSOR - DESCRIPTION, CRANKSHAFT ....................... 14-29
POSITION SENSOR - DESCRIPTION, THROTTLE .......................... 14-40
POSITION SENSOR - OPERATION, CAMSHAFT ........................... 8I-4
POSITION SENSOR - OPERATION, CRANKSHAFT ....................... 14-29
POSITION SENSOR - OPERATION, THROTTLE .......................... 14-41
POSITION SENSOR - REMOVAL, CRANKSHAFT ....................... 14-30
POTENTIAL - STANDARD PROCEDURE, TESTING OF VOLTAGE ..............8W-01-9
POWER - INSTALLATION, WINDOW REGULATOR ........................ 23-22
POWER - REMOVAL, WINDOW REGULATOR ........................ 23-22
POWER ADJUSTER - INSTALLATION, FRONT SEAT TRACK .................23-124
POWER ADJUSTER - REMOVAL, FRONT SEAT TRACK ....................... 23-124
POWER BRAKE BOOSTER - DESCRIPTION ........................ 5-45
POWER BRAKE BOOSTER - DIAGNOSIS AND TESTING ........................ 5-46
POWER BRAKE BOOSTER - OPERATION . . . 5-46
POWER DISTRIBUTION SYSTEM - DESCRIPTION .....................8W -97-1
POWER DISTRIBUTION SYSTEM - OPERATION .......................8W -97-1
POWER DISTRIBUTION SYSTEMS, SPECIAL TOOLS ...................8W -97-1
POWER FOLDAWAY MIRROR SWITCH - EXPORT - DESCRIPTION ...............8N-29
POWER FOLDAWAY MIRROR SWITCH - EXPORT - INSTALLATION ..............8N-30
POWER FOLDAWAY MIRROR SWITCH - EXPORT - OPERATION ................8N-29
POWER FOLDAWAY MIRROR SWITCH - EXPORT - REMOVAL .................. 8N-29
POWER LIFTGATE CONTROL MODULE - DESCRIPTION ....................... 8E-10
POWER LIFTGATE CONTROL MODULE - OPERATION ......................... 8E-10
POWER LIFTGATE CONTROL MODULE, DIAGNOSIS AND TESTING .............8E-10
POWER LIFTGATE LEARN CYCLE, STANDARD PROCEDURE ...............8N-8
POWER LIFTGATE SYSTEM - DESCRIPTION ........................ 8N-2
POWER LIFTGATE SYSTEM - OPERATION . . 8N-2
POWER LIFTGATE SYSTEM, DIAGNOSIS AND TESTING ........................ 8N-3
POWER LOCKS - DESCRIPTION .........8N-20
POWER LOCKS - OPERATION ...........8N-21
POWER MIRRORS - DESCRIPTION ......8N-26
POWER MIRRORS - OPERATION ........8N-26
POWER MIRRORS, DIAGNOSIS AND TESTING ........................... 8N-27
POWER MODULE - BLOWER MOTOR - DESCRIPTION ....................... 24-30
POWER MODULE - BLOWER MOTOR - INSTALLATION ....................... 24-31
POWER MODULE - BLOWER MOTOR - OPERATION ......................... 24-30
POWER MODULE - BLOWER MOTOR - REMOVAL .......................... 24-30
POWER MODULE - DESCRIPTION, INTEGRATED ......................8W -97-1
RS INDEX23
Description Group-Page Description Group-Page Description Group-Page
RELIEF VALVE, OPERATION - HIGHPRESSURE ......................... 24-72
REMOTE ENTRY MODULE - DESCRIPTION, SENTRY KEY .............8Q-3
REMOTE ENTRY MODULE - DIAGNOSIS AND TESTING, SENTRY KEY .............8Q-5
REMOTE ENTRY MODULE - INSTALLATION, SENTRY KEY ............8Q-6
REMOTE ENTRY MODULE - OPERATION, SENTRY KEY ......................... 8Q-4
REMOTE ENTRY MODULE - REMOVAL, SENTRY KEY ......................... 8Q-6
REMOTE ENTRY SYSTEM - DIAGNOSIS AND TESTING, SENTRY KEY .............8Q-3
REMOTE KEYLESS ENTRY TRANSMITTER PROGRAMMING -
STANDARD PROCEDURE ..............8N-24
REMOTE SWITCH, DIAGNOSIS AND TESTING ........................... 8N-30
REMOTE SWITCHES - DESCRIPTION .....8A-16
REMOTE SWITCHES - OPERATION .......8A-16
REMOTE SWITCHES, DIAGNOSIS AND TESTING ........................... 8A-16
REPAIR - DESCRIPTION, FRONT CRADLE CROSSMEMBER THREAD ..............13-14
REPAIR - STANDARD PROCEDURE, INTAKE MANIFOLD VACUUM PORT ......9-148
REPAIR - STANDARD PROCEDURE, MANIFOLD STRIPPED THREAD ..........9-147
REPAIR - STANDARD PROCEDURE, PLASTIC BODY PANEL .................23-3
REPAIR OF DAMAGED OR WORN THREADS - STANDARD PROCEDURE . . 9-10,9-88
REPAIR PROCEDURE, STANDARD PROCEDURE - GRID ................... 8G-5
REPAIRING - STANDARD PROCEDURE, TIRE LEAK .......................... 22-17
REQUIREMENTS - DESCRIPTION, FUEL .....0-4
REQUIREMENTS - DIESEL ENGINE - DESCRIPTION, FUEL ....................0-6
REQUIREMENTS, DESCRIPTION - ENGINE COOLING SYSTEM ..............24-1
RESERVOIR - DESCRIPTION, VACUUM ....8P-6
RESERVOIR - INSTALLATION, VACUUM ....8P-6
RESERVOIR - INSTALLATION, WASHER . . . 8R-13
RESERVOIR - OPERATION, VACUUM ......8P-6
RESERVOIR - REMOVAL, VACUUM ........8P-6
RESERVOIR - REMOVAL, WASHER ......8R-12
RESET - STANDARD PROCEDURE, PARKING BRAKE AUTOMATIC
ADJUSTER TENSION ................... 5-64
RESISTANCE, SPECIFICATIONS - SPARK PLUG CABLE ......................... 8I-2
RESISTANCE TEST - DIAGNOSIS AND TESTING, FEED CIRCUIT ...............8F-35
RESISTOR BLOCK - DESCRIPTION, BLOWER MOTOR ............... 24-24,24-37
RESISTOR BLOCK - OPERATION, BLOWER MOTOR ............... 24-24,24-37
RESISTOR BLOCK, DIAGNOSIS AND TESTING - FRONT BLOWER MOTOR ......24-25
RESISTOR BLOCK, DIAGNOSIS AND TESTING - REAR BLOWER MOTOR ......24-38
RESONATOR - INSTALLATION ............11-9
RESONATOR - REMOVAL ...............11-9
RESTRAINT ANCHOR - DESCRIPTION, CHILD .............................. 8O-9
RESTRAINT ANCHOR - OPERATION, CHILD ............................. 8O-10
RESTRAINT CONTROLLER - DESCRIPTION, OCCUPANT .............8O-27
RESTRAINT CONTROLLER - INSTALLATION, OCCUPANT ............8O-29
RESTRAINT CONTROLLER - OPERATION, OCCUPANT ......................... 8O-28
RESTRAINT CONTROLLER - REMOVAL, OCCUPANT ......................... 8O-29
RESTRAINTS - DESCRIPTION ............8O-2
RESTRAINTS - OPERATION .............8O-4
RESTRICTION CHECK - DIAGNOSIS AND TESTING, EXHAUST SYSTEM ............11-2
RETAINER - INSTALLATION, CRANKSHAFT REAR OIL SEAL ..........9-132
RETAINER - INSTALLATION, PLASTIC GROCERY BAG ..................... 23-149
RETAINER - REMOVAL, CRANKSHAFT REAR OIL SEAL ...................... 9-132RETAINER - REMOVAL, PLASTIC
GROCERY BAG ..................... 23-149
RETRACTOR - FIRST ROW - OUTBOARD - INSTALLATION, SEAT BELT ...........8O-40
RETRACTOR - FIRST ROW - OUTBOARD - REMOVAL, SEAT BELT ...............8O-39
RETRACTOR - OUTBOARD - FRONT - INSTALLATION, SEAT BELT .............8O-39
RETRACTOR - OUTBOARD - FRONT - REMOVAL, SEAT BELT ................8O-38
RETRACTOR - SECOND ROW - LEFT OUTBOARD - INSTALLATION, SEAT
BELT .............................. 8O-42
RETRACTOR - SECOND ROW - LEFT OUTBOARD - REMOVAL, SEAT BELT .....8O-42
RETRACTOR - SECOND ROW - RIGHT OUTBOARD - INSTALLATION, SEAT
BELT .............................. 8O-40
RETRACTOR - SECOND ROW - RIGHT OUTBOARD - REMOVAL, SEAT BELT .....8O-40
RETRACTOR - SECOND ROW - RIGHT OUTBOARD WITH REAR HVAC - LWB -
INSTALLATION, SEAT BELT .............8O-41
RETRACTOR - SECOND ROW - RIGHT OUTBOARD WITH REAR HVAC - LWB -
REMOVAL, SEAT BELT ................8O-41
RETURN - PCM INPUT - OPERATION, SENSOR ............................ 8E-14
RETURN HOSE - INSTALLATION, HEATER . 24-89
RETURN HOSE - REMOVAL, HEATER .....24-88
RING AND COVER - FOLD-IN-FLOOR - INSTALLATION, CARPET TRIM ..........23-84
RING AND COVER - FOLD-IN-FLOOR - REMOVAL, CARPET TRIM ..............23-84
RING, FITTING - PISTON ................9-47
RING FITTING - STANDARD PROCEDURE, PISTON .................9-124
RINGS - INSTALLATION, PISTON ........9-124
RINGS - REMOVAL, PISTON ............9-124
RISER - 50/50 SPLIT - INSTALLATION, BENCH SEAT ....................... 23-145
RISER - 50/50 SPLIT - REMOVAL, BENCH SEAT ....................... 23-145
RISER - INSTALLATION, LUGGAGE RACK . . 23-58
RISER - INSTALLATION, QUAD BUCKET SEAT ............................. 23-143
RISER - MANUAL - OCS - INSTALLATION, FRONT SEAT ..........23-123
RISER - MANUAL - OCS - REMOVAL, FRONT SEAT ....................... 23-123
RISER - REMOVAL, LUGGAGE RACK .....23-57
RISER - REMOVAL, QUAD BUCKET SEAT . 23-143
RISER - SECOND ROW - FOLD-IN-FLOOR - INSTALLATION, SEAT BASE ..........23-135
RISER - SECOND ROW - FOLD-IN-FLOOR - REMOVAL, SEAT BASE ..............23-134
RISER - SECOND ROW - INSTALLATION, BENCH SEAT ....................... 23-145
RISER - SECOND ROW - REMOVAL, BENCH SEAT ....................... 23-145
RISER - THIRD ROW - INSTALLATION, BENCH SEAT ....................... 23-145
RISER - THIRD ROW - REMOVAL, BENCH SEAT ....................... 23-145
RISER LATCH LOCKING LINK - INSTALLATION, SEAT .................23-151
RISER LATCH LOCKING LINK - REMOVAL, SEAT .................... 23-151
ROAD TEST - DIAGNOSIS AND TESTING . . . 8P-3
ROAD TEST - DIAGNOSIS AND TESTING . 21-150, 21-5
ROCKER ARMS - DESCRIPTION .........9-112
ROCKER ARMS - INSPECTION ...........9-35
ROCKER ARMS - INSTALLATION .........9-35
ROCKER ARMS - OPERATION ...........9-112
ROCKER ARMS - REMOVAL .............9-35
ROCKER ARMS AND SHAFT - ASSEMBLY . 9-113
ROCKER ARMS AND SHAFT - DISASSEMBLY ....................... 9-113
ROCKER ARMS AND SHAFT - INSTALLATION ....................... 9-113
ROCKER ARMS AND SHAFT - REMOVAL . . 9-112
ROD - DESCRIPTION, LIFT GEAR & LINK . 8N-16
ROD - DESCRIPTION, PISTON & CONNECTING .................... 9-119,9-44
ROD - INSTALLATION, LIFT GEAR & LINK .............................. 8N-17
ROD - INSTALLATION, OUTER TIE .......19-35 ROD - INSTALLATION, PISTON &
CONNECTING ......................... 9-45
ROD - OPERATION, LIFT GEAR & LINK . . . 8N-16
ROD - REMOVAL, LIFT GEAR & LINK .....8N-16
ROD - REMOVAL, OUTER TIE ...........19-34
ROD - REMOVAL, PISTON & CONNECTING ......................... 9-44
ROD - SECOND ROW - FOLD-IN-FLOOR - INSTALLATION, SEAT PROP ...........23-140
ROD - SECOND ROW - FOLD-IN-FLOOR - REMOVAL, SEAT PROP ...............23-139
ROD BEARING CLEARANCE - STANDARD PROCEDURE, MEASURING
CONNECTING ........................ 9-123
ROD, FITTING - CONNECTING ............9-46
RODS - STANDARD PROCEDURE, FITTING CONNECTING .................9-119
ROOF JOINT MOLDING - INSTALLATION . . 23-60
ROOF JOINT MOLDING - REMOVAL ......23-60
ROTATING ASSEMBLY - SECOND ROW - FOLD-IN-FLOOR - INSTALLATION,
ARMREST ......................... 23-130
ROTATING ASSEMBLY - SECOND ROW - FOLD-IN-FLOOR - REMOVAL,
ARMREST ......................... 23-130
ROTATION - STANDARD PROCEDURE, TIRE AND WHEEL ..................... 22-7
ROTOR - DIAGNOSIS AND TESTING, BRAKE .............................. 5-55
ROTOR - INSTALLATION, FRONT BRAKE . . . 5-59
ROTOR - REMOVAL, FRONT BRAKE .......5-59
ROTOR, EXPORT - BRAKE ................5-60
ROTOR MACHINING - STANDARD PROCEDURE, BRAKE ................... 5-58
ROTOR, SPECIFICATIONS - BRAKE ........5-60
RUNOUT, SPECIFICATIONS - TONE WHEEL ............................. 5-91
SAFETY PRECAUTIONS AND WARNINGS, WARNING ........................... 23-1
SAFETY PRECAUTIONS, WARNING - WINDSHIELD ....................... 23-161
SANDING/BUFFING & POLISHING - DESCRIPTION, FINESSE ..............23-101
SBEC CONTROLLER - INSTALLATION .....8E-17
SBEC CONTROLLER - REMOVAL .........8E-16
SCHEMATICS AND DIAGRAMS - 4XTE TRANSAXLE HYDRAULIC SCHEMATICS . . 21-199, 21-54
SCHEMATICS AND DIAGRAMS - SPECIAL TOOLS ............................. 21-68
SCHEMATICS, SCHEMATICS AND DIAGRAMS - 4XTE TRANSAXLE
HYDRAULIC ................... 21-199,21-54
SCREEN - DESCRIPTION, VIDEO ........8A-20
SCREEN - INSTALLATION, VIDEO ........8A-20
SCREEN - OPERATION, VIDEO ..........8A-20
SCREEN - REMOVAL, VIDEO ............8A-20
SCUFF PAD - INSTALLATION, REAR FASCIA .............................. 13-5
SCUFF PAD - REMOVAL, REAR FASCIA ....13-5
SEAL - ASSEMBLY, CALIPER PISTON . . 5-26,5-30
SEAL - DIAGNOSIS AND TESTING, RADIATOR CAP TO FILLER NECK .........7-28
SEAL - DISASSEMBLY, CALIPER PISTON . . . 5-24,
5-28
SEAL - FRONT - INSTALLATION, CRANKSHAFT OIL ................ 9-130,9-42
SEAL - FRONT - REMOVAL, CRANKSHAFT OIL ................ 9-130,9-41
SEAL - OIL PUMP - INSTALLATION .....21-113,
21-264
SEAL - OIL PUMP - REMOVAL . . . 21-113,21-264
SEAL - REAR - INSTALLATION, CRANKSHAFT OIL ................ 9-131,9-42
SEAL - REAR - REMOVAL, CRANKSHAFT OIL ........................... 9-131,9-42
SEAL RETAINER - INSTALLATION, CRANKSHAFT REAR OIL ...............9-132
SEAL RETAINER - REMOVAL, CRANKSHAFT REAR OIL ...............9-132
SEALERS, STANDARD PROCEDURE - FORM-IN-PLACE GASKETS ..........9-11,9-86
SEALING LOCATIONS - FOLD-IN-FLOOR ONLY - SPECIFICATIONS, BODY ........23-209
SEALING LOCATIONS - SPECIFICATIONS, BODY ............................. 23-183
SEALS - DESCRIPTION, VALVE STEM .....9-114
26 INDEXRS
Description Group-Page Description Group-Page Description Group-Page