2005 CHRYSLER CARAVAN air condition

[x] Cancel search: air condition

Page 2279 of 2339

CHRYSLER CARAVAN 2005  Service Manual The major non-monitored circuits are listed below
along with examples of failures modes that do not
directly cause the PCM to set a DTC, but for a sys-
tem that is monitored.
FUEL PRESSURE
The fuel pr

Page 2280 of 2339

CHRYSLER CARAVAN 2005  Service Manual The information obtained by the sensor is used to
calculate the fuel injector pulse width. The PCM is
programmed to maintain the optimum air/fuel ratio.
At this mixture ratio, the catalyst works best

Page 2281 of 2339

CHRYSLER CARAVAN 2005  Service Manual tion occurs such that the PCM cannot maintain the
optimum A/F ratio, then the MIL will be illuminated.
CATALYST MONITOR
To comply with clean air regulations, vehicles are
equipped with catalytic conve

Page 2282 of 2339

CHRYSLER CARAVAN 2005  Service Manual as well as allowing sufficient purge flow in the event
that the solenoid was to become inoperative.
The solenoid actuates the valve to unseal the can-
ister vent while the engine is running. It also w

Page 2292 of 2339

CHRYSLER CARAVAN 2005  Service Manual (2) Install hose on PCV valve. Remove the
make-up air hose from the air plenum at the rear of
the engine. Hold a piece of stiff paper (parts tag)
loosely over the end of the make-up air hose.
(3) Afte

Page 2297 of 2339

CHRYSLER CARAVAN 2005  Service Manual De-energizing the solenoid, but not fully closing the
transducer bleed hole (because of low back-pressure),
varies the strength of vacuum applied to the EGR
valve. Varying the strength of the vacuum c

Page 2298 of 2339

CHRYSLER CARAVAN 2005  Service Manual ON-BOARD DIAGNOSTICS
TABLE OF CONTENTS
page page
TASK MANAGER
DESCRIPTION.........................25OPERATION...........................25
TASK MANAGER
DESCRIPTION
The PCM is responsible for efficient

Page 2302 of 2339

CHRYSLER CARAVAN 2005  Service Manual INDEX
ABS FASTENER TORQUE,SPECIFICATIONS ...................... 5-91
ABSORBER - DESCRIPTION, SHOCK .......2-36
ABSORBER - INSTALLATION, SHOCK ......2-38
ABSORBER - OPERATION, SHOCK ........2-36
ABSORB