LT-16
HEADLAMP (FOR USA)
Revision: August 20072004 QX56
Preliminary CheckEKS0079X
CHECK POWER SUPPLY AND GROUND CIRCUIT
1. CHECK FUSES OR FUSIBLE LINK
Check for blown fuses or fusible link.
Refer to LT- 1 0 , "
Wiring Diagram — H/LAMP —" .
OK or NG
OK >> GO TO 2.
NG >> If fuse is blown, be sure to eliminate cause of blown fuse before installing new fuse. Refer to PG-
4, "POWER SUPPLY ROUTING CIRCUIT" .
2. CHECK POWER SUPPLY CIRCUIT
1. Disconnect BCM connectors.
2. Check voltage between BCM harness connector and ground.
OK or NG
OK >> GO TO 3.
NG >> Check harness for open between BCM and fuse or fus-
ible link.
Unit Power source Fuse No.
BCMBattery f
Ignition switch ON or START position 59
IPDM E/R Battery34
35
40
41
53
BCM
(–)Ignition switch position
(+)
OFF ACC ON
ConnectorTe r m i n a l
(wire color)
M18 38 (W/L)
Ground0V 0VBattery
voltage
M20 70 (W/B)Battery
voltageBattery
voltageBattery
voltage
WKIA1436E
LT-42
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM -
Revision: August 20072004 QX56
How to Proceed With Trouble DiagnosisEKS007AG
1. Confirm the symptom or customer complaint.
2. Understand operation description and function description. Refer to LT-35, "
System Description" .
3. Perform the Preliminary Check. Refer to LT-42, "
Preliminary Check" .
4. Check symptom and repair or replace the cause of malfunction.
5. Does the headlamp operate normally? If YES: GO TO 6. If NO: GO TO 4.
6. Inspection End.
Preliminary CheckEKS007AH
CHECK BCM CONFIGURATION
1. CHECK BCM CONFIGURATION
Confirm BCM configuration for "DTRL" is set to "WITH". Refer to BCS-13, "
READ CONFIGURATION PROCE-
DURE" .
OK or NG
OK >> Continue preliminary check. Refer to LT- 4 2 , "INSPECTION FOR POWER SUPPLY AND
GROUND CIRCUIT" .
NG >> Change BCM configuration for "DTRL" to "WITH". Refer to BCS-16, "
WRITE CONFIGURATION
PROCEDURE" .
INSPECTION FOR POWER SUPPLY AND GROUND CIRCUIT
1. CHECK FUSES AND FUSIBLE LINK
Check for blown fuses or fusible link.
Refer to LT- 3 7 , "
Wiring Diagram — DTRL —" .
OK or NG
OK >> GO TO 2.
NG >> If fuse is blown, be sure to eliminate cause of blown fuse before installing new fuse. Refer to PG-
4, "POWER SUPPLY ROUTING CIRCUIT" .
35 O/B Combination switch output 2
ONLighting, turn, wiper OFF
Wiper dial position 4
36 R/W Combination switch output 1
38 W/L Ignition switch (ON) ON — Battery voltage
39 W CAN-H — — —
40 R CAN-L — — —
67 B Ground ON — 0V
70 W/B Battery power supply (fusible
link)OFF
—Battery voltage Terminal
No.Wire
colorSignal nameMeasuring condition
Reference value
(Approx.) Ignition
switchOperation or condition
SKIA5292E
Unit Power source Fuse No.
BCMBattery f
Ignition switch ON or START position 59
Daytime light relay Battery 45
AUTO LIGHT SYSTEM
LT-55
C
D
E
F
G
H
I
J
L
MA
B
LT
Revision: August 20072004 QX56
*1 USA
*2 Canada
How to Proceed With Trouble DiagnosisEKS007AW
1. Confirm the symptom or customer complaint.
2. Understand operation description and function description. Refer to LT- 4 8 , "
System Description" .
3. Carry out the Preliminary Check. Refer to LT- 5 5 , "
Preliminary Check" .
4. Check symptom and repair or replace the cause of malfunction. Refer to LT- 6 2 , "
Trouble Diagnosis Chart
by Symptom" .
5. Does the auto light system operate normally? If YES: GO TO 6. If NO: GO TO 4.
6. Inspection End.
Preliminary CheckEKS007AX
SETTING CHANGE FUNCTIONS
Sensitivity of auto light system can be adjusted using CONSULT-II. Refer to LT-58, "WORK SUPPORT" .
CHECK POWER SUPPLY AND GROUND CIRCUIT
1. CHECK FUSES OR FUSIBLE LINK
Check for blown fuses or fusible link.
Refer to LT- 5 0 , "
Wiring Diagram — AUTO/L —" .
OK or NG
OK >> GO TO 2.
NG >> If fuse is blown, be sure to eliminate cause of blown fuse before installing new fuse. Refer to PG-
4, "POWER SUPPLY ROUTING CIRCUIT" .
56L/W *1
Y *2Headlamp high (RH) ONLighting switch
HIGH or PASS
positionOFF 0V
ON Battery voltage
57 R/LParking, license, and tail
lampONLighting switch
1ST positionOFF 0V
ON Battery voltage
59 B Ground ON — 0V Terminal
No.Wire color Signal nameMeasuring condition
Reference value
(Approx.) Ignition
switchOperation or condition
Unit Power source Fuse No.
BCMBattery f
Ignition switch ON or START position 59
IPDM E/R Battery34
35
37
40
41
53
FRONT FOG LAMP
LT-75
C
D
E
F
G
H
I
J
L
MA
B
LT
Revision: August 20072004 QX56
Preliminary CheckEKS007BB
CHECK POWER SUPPLY AND GROUND CIRCUIT
1. CHECK FUSES OR FUSIBLE LINK
Check for blown fuses or fusible link.
Refer to LT- 7 1 , "
Wiring Diagram — F/FOG —" .
OK or NG
OK >> GO TO 2.
NG >> If fuse is blown, be sure to eliminate cause of blown fuse before installing new fuse. Refer to PG-
4, "POWER SUPPLY ROUTING CIRCUIT" .
2. CHECK POWER SUPPLY CIRCUIT
1. Disconnect BCM connectors.
2. Check voltage between BCM harness connector and ground.
OK or NG
OK >> GO TO 3.
NG >> Check harness for open between BCM and fuse or fus-
ible link.
3. CHECK GROUND CIRCUIT
Check continuity between BCM harness connector and ground.
OK or NG
OK >> Inspection End.
NG >> Check ground circuit harness.
Unit Power source Fuse No.
BCMBattery f
Ignition switch ON or START position 59
IPDM E/RBattery 53
Battery (Fog lamps ON) 56
BCM
(–)Ignition switch position
(+)
OFF ACC ON
ConnectorTerminal
(wire color)
M18 38 (W/L)
Ground0V 0VBattery
voltage
M20 70 (W/B)Battery
voltageBattery
voltageBattery
voltage
WKIA1436E
BCM
Continuity
ConnectorTe r m i n a l
(wire color)
M20 67 (B) Ground Yes
LIIA0915E
TURN SIGNAL AND HAZARD WARNING LAMPS
LT-87
C
D
E
F
G
H
I
J
L
MA
B
LT
Revision: August 20072004 QX56
Preliminary CheckEKS007BO
CHECK POWER SUPPLY AND GROUND CIRCUIT
1. CHECK FUSES OR FUSIBLE LINK
Check for blown fuses or fusible link.
Refer to LT- 8 3 , "
Wiring Diagram — TURN —" .
OK or NG
OK >> GO TO 2.
NG >> If fuse is blown, be sure to eliminate cause of blown fuse before installing new fuse. Refer to PG-
4, "POWER SUPPLY ROUTING CIRCUIT" .
2. CHECK POWER SUPPLY CIRCUIT
1. Disconnect BCM connectors.
2. Check voltage between BCM harness connector and ground.
OK or NG
OK >> GO TO 3.
NG >> Check harness for open between BCM and fuse or fus-
ible link.
3. CHECK GROUND CIRCUIT
Check continuity between BCM harness connector and ground.
OK or NG
OK >> Inspection End.
NG >> Check ground circuit harness.
Unit Power source Fuse No.
BCMBattery f
Ignition switch ON or START position 59
BCM
(–)Ignition switch position
(+)
OFF ACC ON
ConnectorTerminal
(wire color)
M18 38 (W/L)
Ground0V 0VBattery
voltage
M20 70 (W/B)Battery
voltageBattery
voltageBattery
voltage
WKIA1436E
BCM
Continuity
ConnectorTe r m i n a l
(wire color)
M20 67 (B) Ground Yes
LIIA0915E
LT-116
PARKING, LICENSE PLATE AND TAIL LAMPS
Revision: August 20072004 QX56
Preliminary CheckEKS007CL
CHECK POWER SUPPLY AND GROUND CIRCUIT
1. CHECK FUSES OR FUSIBLE LINK
Check for blown fuses or fusible link.
Refer to LT- 111 , "
Wiring Diagram — TAIL/L —" .
OK or NG
OK >> GO TO 2.
NG >> If fuse is blown, be sure to eliminate cause of blown fuse before installing new fuse. Refer to PG-
4, "POWER SUPPLY ROUTING CIRCUIT" .
2. CHECK POWER SUPPLY CIRCUIT
1. Disconnect BCM connectors.
2. Check voltage between BCM harness connector and ground.
OK or NG
OK >> GO TO 3.
NG >> Check harness for open between BCM and fuse or fus-
ible link.
3. CHECK GROUND CIRCUIT
Check continuity between BCM harness connector and ground.
OK or NG
OK >> Inspection End.
NG >> Check ground circuit harness.
Unit Power source Fuse No.
BCMBattery f
Ignition switch ON or START position 59
IPDM E/RBattery 53
Battery (Tail lamps ON) 37
BCM
(–)Ignition switch position
(+)
OFF ACC ON
ConnectorTe r m i n a l
(wire color)
M18 38 (W/L)
Ground0V 0VBattery
voltage
M20 70 (W/B)Battery
voltageBattery
voltageBattery
voltage
WKIA1436E
BCM
Continuity
ConnectorTe r m i n a l
(wire color)
M20 67 (B) Ground Yes
LIIA0915E
INTERIOR ROOM LAMP
LT-143
C
D
E
F
G
H
I
J
L
MA
B
LT
Revision: August 20072004 QX56
Preliminary CheckEKS007D3
INSPECTION FOR POWER SUPPLY AND GROUND CIRCUIT
1. CHECK FUSES OR FUSIBLE LINK
Check for blown BCM fuses or fusible link.
Refer to LT-135, "
Wiring Diagram — INT/L —" .
OK or NG
OK >> GO TO 2.
NG >> If fuse is blown, be sure to eliminate cause of blown fuse before installing new fuse. Refer to PG-
4, "POWER SUPPLY ROUTING CIRCUIT" .
2. CHECK POWER SUPPLY CIRCUIT
1. Disconnect BCM connectors.
2. Check voltage between BCM connector and ground.
OK or NG
OK >> GO TO 3.
NG >> Check harness for open between BCM and fuse or fusible link.
3. CHECK GROUND CIRCUIT
Check continuity between BCM and ground.
OK or NG
OK >> Inspection End.
NG >> Check harness ground circuit.
Unit Power source Fuse or fusible link No.
BCMBatteryf
22
Ignition switch ON or START position 59
BCM
(–)Ignition switch position
(+)
OFF ON
ConnectorTerminal
(wire color)
M2057 (Y/R)
GroundBattery voltage Battery voltage
70 (W/B) Battery voltage Battery voltage
M18 38 (W/L) 0V Battery voltage
WKIA1478E
BCM
Continuity
ConnectorTe r m i n a l
(wire color)
M20 67 (B) Ground Yes
LIIA0915E
PG-1
POWER SUPPLY, GROUND & CIRCUIT ELEMENTS
K ELECTRICAL
CONTENTS
C
D
E
F
G
H
I
J
L
M
SECTION PG
A
B
PG
Revision: August 20072004 QX56 PRECAUTIONS .......................................................... 3
Precautions for Supplemental Restraint System
(SRS) “AIR BAG” and “SEAT BELT PRE-TEN-
SIONER” .................................................................. 3
Wiring Diagrams and Trouble Diagnosis .................. 3
POWER SUPPLY ROUTING CIRCUIT ...................... 4
Schematic ................................................................ 4
Wiring Diagram — POWER — ................................. 6
BATTERY POWER SUPPLY — IGNITION SW.
IN ANY POSITION ................................................ 6
ACCESSORY POWER SUPPLY — IGNITION
SW. IN ACC OR ON .............................................11
IGNITION POWER SUPPLY — IGNITION SW.
IN ON .................................................................. 12
IGNITION POWER SUPPLY — IGNITION SW.
IN ON AND/OR START ....................................... 13
IPDM E/R (INTELLIGENT POWER DISTRIBUTION
MODULE ENGINE ROOM) ...................................... 17
System Description ................................................ 17
SYSTEMS CONTROLLED BY IPDM E/R ........... 17
CAN COMMUNICATION LINE CONTROL ......... 17
IPDM E/R STATUS CONTROL ........................... 18
CAN Communication System Description .............. 18
Function of Detecting Ignition Relay Malfunction ... 18
CONSULT-II Function (IPDM E/R) ......................... 19
CONSULT-II BASIC OPERATION ...................... 19
SELF-DIAGNOSTIC RESULTS .......................... 20
DATA MONITOR ................................................. 20
ACTIVE TEST ..................................................... 22
Auto Active Test ..................................................... 23
DESCRIPTION .................................................... 23
OPERATION PROCEDURE ............................... 23
INSPECTION IN AUTO ACTIVE TEST MODE ... 23
Schematic .............................................................. 25
IPDM E/R Terminal Arrangement ........................... 26
IPDM E/R Power/Ground Circuit Inspection .......... 27
Inspection with CONSULT-II (Self-Diagnosis) ........ 28
Removal and Installation of IPDM E/R ................... 29
REMOVAL ........................................................... 29
INSTALLATION ................................................... 29GROUND CIRCUIT ................................................... 30
Ground Distribution ................................................. 30
MAIN HARNESS ................................................. 30
ENGINE ROOM HARNESS ................................ 33
ENGINE CONTROL HARNESS .......................... 36
BODY HARNESS ................................................ 37
BODY NO. 2 HARNESS ..................................... 38
BACK DOOR NO. 2 RH HARNESS .................... 39
HARNESS ................................................................. 40
Harness Layout ...................................................... 40
HOW TO READ HARNESS LAYOUT ................. 40
OUTLINE ............................................................. 41
MAIN HARNESS ................................................. 42
ENGINE ROOM HARNESS (LH VIEW) .............. 44
ENGINE ROOM HARNESS (RH VIEW) ............. 47
ENGINE CONTROL HARNESS .......................... 49
CHASSIS HARNESS .......................................... 51
BODY HARNESS ................................................ 53
BODY NO. 2 HARNESS ..................................... 55
ROOM LAMP HARNESS .................................... 57
FRONT DOOR LH HARNESS ............................ 58
FRONT DOOR RH HARNESS ............................ 58
REAR DOOR LH HARNESS ............................... 59
REAR DOOR RH HARNESS .............................. 59
BACK DOOR HARNESS .................................... 60
Wiring Diagram Codes (Cell Codes) ...................... 61
ELECTRICAL UNITS LOCATION ............................ 64
Electrical Units Location ......................................... 64
ENGINE COMPARTMENT .................................. 64
PASSENGER COMPARTMENT ......................... 65
Fuse ........................................................................ 67
Fusible Link ............................................................ 67
Circuit Breaker (Built Into BCM) ............................. 67
HARNESS CONNECTOR ......................................... 68
Description .............................................................. 68
HARNESS CONNECTOR (TAB-LOCKING
TYPE) .................................................................. 68
HARNESS CONNECTOR (SLIDE-LOCKING
TYPE) .................................................................. 69
HARNESS CONNECTOR (DIRECT-CONNECT