2004 CHRYSLER VOYAGER ignition

[x] Cancel search: ignition

Page 400 of 2585

CHRYSLER VOYAGER 2004  Service Manual OPERATION
The data link connector (diagnostic connector)
links the DRB scan tool with the Powertrain Control
Module (PCM). Refer to On-Board Diagnostics in the
General Diagnosis section of this group.

Page 401 of 2585

CHRYSLER VOYAGER 2004  Service Manual and ground connections inspected around the affected
areas on the vehicle.
REMOVAL
(1) Disconnect and isolate the negative and posi-
tive battery cables from the battery.
(2) Remove the battery from t

Page 405 of 2585

CHRYSLER VOYAGER 2004  Service Manual NOTE: PCM Inputs:
²Air Conditioning Pressure Transducer
²Ambient temperature Sensor
²ASD Relay
²Battery Temperature Sensor (NGC)
²Battery Voltage
²Brake Switch
²Camshaft Position Sensor
²Crank

Page 408 of 2585

CHRYSLER VOYAGER 2004  Service Manual OPERATION - SENSOR RETURN - PCM INPUT
The sensor return circuit provides a low electrical
noise ground reference for all of the systems sensors.
The sensor return circuit connects to internal ground
c

Page 411 of 2585

CHRYSLER VOYAGER 2004  Service Manual Refer to the appropriate Powertrain Diagnostic Man-
ual and the DRBIIItscan tool.
(1) Install PCM module to the mounting bracket.
(2) Install electrical connectors and lock.
(3) Install the splash shi

Page 412 of 2585

CHRYSLER VOYAGER 2004  Service Manual (6) Rotate the SKIM upwards and then to the side
away from the steering column to slide the SKIM
antenna ring from around the ignition switch lock
cylinder housing.
(7) Remove the SKIM from the vehicl

Page 413 of 2585

CHRYSLER VOYAGER 2004  Service Manual (2) Remove the appropriate door trim panel from
the vehicle. Refer to Body for the procedure.
(3) Remove the weather shield. Refer to Body for
the procedure.
(4) Disconnect the power door control modu

Page 418 of 2585

CHRYSLER VOYAGER 2004  Service Manual BODY CONTROL MODULE
TABLE OF CONTENTS
page page
BODY CONTROL MODULE DESCRIPTION ..........................1
OPERATION ............................1 REMOVAL
.............................3
INSTALLATION