2003 JEEP GRAND CHEROKEE Exhaust intake

[x] Cancel search: Exhaust intake

Page 1343 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual ²Step 2: Verify that bolts 1±10, all reached 27
N´m (20 ft. lbs.), by repeating step-1 without loosen-
ing the bolts. Tighten bolts 11 thru 14 to 14 N´m (10
ft. lbs.).
²Step 3: Tighten bolts 1±1

Page 1347 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual CYLINDER HEAD COVER(S) -
RIGHT
DESCRIPTION
The cylinder head covers are made of die cast mag-
nesium, and are not interchangeable from side-to-
side. It is imperative that nothing rest on the
cylinder

Page 1348 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual STANDARD PROCEDUREÐREFACING
NOTE: Valve seats that are worn or burned can be
reworked, provided that correct angle and seat
width are maintained. Otherwise the cylinder head
must be replaced.
NOTE: W

Page 1349 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (4) Remove the two spring retainer lock halves.
NOTE: the valve spring is under tension use care
when releasing the valve spring compressor.
(5) Remove the valve spring compressor.
(6) Remove the spri

Page 1350 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (7) Install the camshaft bearing cap retaining
bolts. Tighten the bolts 9±13 N´m (100 in. lbs.) in1¤2
turn increments in the sequence shown (Fig. 43).
(8) Position the hydraulic lash adjusters and

Page 1351 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (4) For rocker arm installation on cylinders 1 and
7 Rotate the crankshaft until cylinder #2 is at TDC
compression stroke.
(5) Using special tool 8516 press downward on the
valve spring, install rocke

Page 1369 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual ITEM DESCRIPTION TORQUE
1 NUT 45 N´m
(Qty 1) (33 ft. lbs)
2 BOLT 46 N´m
(Qty 4) (34 ft. lbs.)
3 BOLT 68 N´m
(Qty 2 Per
Side)(50 ft. lbs.)
4 BOLT 46 N´m
(Qty 2 Per
Side)(34 ft. lbs.)
5 BOLT 46 N´m

Page 1381 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (7) Connect throttle cable and speed control cable
to throttle body.
(8) Install fuel rail (Refer to 14 - FUEL SYSTEM/
FUEL DELIVERY/FUEL RAIL - INSTALLATION).
(9) Install ignition coil towers (Refer
Page:   < prev 1-10 ... 9-16 17-24 25-32 33-40 41-48 49-56 next >