2003 CHRYSLER CARAVAN check oil

[x] Cancel search: check oil

Page 2087 of 2177

CHRYSLER CARAVAN 2003  Service Manual REFRIGERANT OIL
DESCRIPTION
The refrigerant oil used in R-134a refrigerant sys-
tems is a synthetic-based, PolyAlkylene Glycol (PAG),
wax-free lubricant. Mineral-based R-12 refrigerant
oils are not co

Page 2113 of 2177

CHRYSLER CARAVAN 2003  Service Manual The following is a list of the monitored compo-
nents:
²Comprehensive Components
²Oxygen Sensor Monitor
²Oxygen Sensor Heater Monitor
²Catalyst Monitor
COMPREHENSIVE COMPONENTS
Along with the majo

Page 2114 of 2177

CHRYSLER CARAVAN 2003  Service Manual ªBig Slopeº. The PCM checks the oxygen sensor volt-
age in increments of a few milliseconds.
Reduced Output Voltage (Half Cycle)ÐThe
output voltage of the O2S ranges from 0 to 1 volt
(voltages are

Page 2116 of 2177

CHRYSLER CARAVAN 2003  Service Manual period the switch ratio reaches a predetermined
value, a counter is incremented by one. The monitor
is enabled to run another test during that trip. When
the test fails 6 times, the counter increments

Page 2117 of 2177

CHRYSLER CARAVAN 2003  Service Manual FUEL INJECTOR MECHANICAL MALFUNCTIONS
The PCM cannot determine if a fuel injector is
clogged, the needle is sticking or if the wrong injector
is installed. However, these could result in a rich or
lea

Page 2145 of 2177

CHRYSLER CARAVAN 2003  Service Manual CENTER - DESCRIPTION, ELECTRONIC
VEHICLE INFO.......................8M-6
CENTER - DIAGNOSIS AND TESTING,
ELECTRONIC VEHICLE INFORMATION.....8M-7
CENTER - INSTALLATION, ELECTRONIC
VEHICLE INFO.........

Page 2146 of 2177

CHRYSLER CARAVAN 2003  Service Manual COLUMN COVER BACKING PLATE -
REMOVAL, STEERING.................23-69
COLUMN TORQUE, SPECIFICATIONS.....19-14
COMBUSTION PRESSURE LEAKAGE
TEST - DIAGNOSIS AND TESTING,
CYLINDER........................9

Page 2147 of 2177

CHRYSLER CARAVAN 2003  Service Manual COOLANT LEVEL CHECK - STANDARD
PROCEDURE..........................7-5
COOLANT RECOVERY CONTAINER -
DESCRIPTION........................7-19
COOLANT RECOVERY CONTAINER -
INSTALLATION....................