A79196
New O±Ring
New O±Ring
A79182
Collar
Groove
±
ENGINE MECHANICAL PARTIAL ENGINE ASSY(1CD±FTV)
14±299
AVENSIS REPAIR MANUAL (RM1018E)
132.INSTALL VACUUM PUMP ASSY
(a)Install 2 new O±rings to the vacuum pump.
(b)Align the key of the vacuum pump with the keyway of the
exhaust camshaft, insert the vacuum pump into place.
Secure the pump with the 2 bolts.
Torque: 21 N m (214 kgf cm, 15 ft lbf)
133.INSTALL EGR VALVE ASSY
(a)Install a new gasket and the EGR valve with the bolt and 2 nuts. Torque: 18 N m (184 kgf cm, 13 ft lbf)
134.INSTALL INTAKE AIR CONNECTOR SUB±ASSY
(a)Install a new gasket and the intake air connector with diesel throttle b\
ody with the bolt and 2 nuts. Torque: 21 N m (214 kgf cm, 15 ft lbf)
135.INSTALL WATER OUTLET SUB±ASSY
(a)Install a new gasket and the water outlet with the 2 bolts. Torque: 21 N m (214 kgf cm,15 ft lbf)
136.INSTALL OIL COOLER ASSY (See page 17±32)
137.INSTALL EXHAUST MANIFOLD
(a)Install a new gasket, the exhaust manifold and the 8 col-lars with new 8 nuts.
Torque: 47 N m (479 kgf cm, 35 ft lbf)
HINT:
When installing the collars, pay attention to the mounting
orientation. Ring groove of the collar should be outside. Refer
to the illustration on the left.
138.INSTALL EGR PIPE SUB±ASSY NO.1
(a)Install 2 new gaskets and the EGR pipe with the bolt and 4 new nuts. Torque:
37 Nm (375 kgf cm,27 ft lbf) for bolt
25 N m (250 kgf cm,18 ft lbf) for nut
139.INSTALL TURBOCHARGER SUB±ASSY (See page 13±11)
140.INSTALL TURBO OIL INLET PIPE SUB±ASSY (See page 13±11)
141.INSTALL TURBOCHARGER STAY (See page 13±11)
142.INSTALL EXHAUST MANIFOLD CONVERTER SUB±ASSY (See page 13±11)
143.INSTALL MANIFOLD STAY NO.2 (See page 13±11)
144.INSTALL EXHAUST MANIFOLD HEAT INSULATOR NO.2 (See page 13±11)
145.INSTALL TURBO INSULATOR NO.1 (See page 13±11)
146.INSTALL TURBO INSULATOR NO.2 (See page 13±11)