NOTE: The engine cooling system will push any
remaining air into the coolant bottle within about an
hour of normal driving. As a result, a drop in cool-
ant level in the pressure bottle may occur. If the
engine cooling system overheats and pushes cool-
ant into the overflow side of the coolant bottle, this
coolant will be sucked back into the cooling system
ONLY IF THE PRESSURE CAP IS LEFT ON THE
BOTTLE. Removing the pressure cap breaks the
vacuum path between the two bottle sections and
the coolant will not return to cooling system.
(3) With heater control unit in the HEAT position,
operate engine with pressure bottle cap in place.
(4) Add coolant to pressure bottle as necessary.
Only add coolant to the pressure bottle when
the engine is cold. Coolant level in a warm
engine will be higher due to thermal expansion.
NOTE: The coolant bottle has two chambers. Cool-
ant will normally only be in the outboard (larger) of
the two. The inboard chamber is only to recover
coolant in the event of an overheat or after a recent
service fill. The inboard chamber should normally
be empty. If there is coolant in the overflow side of
the coolant bottle (after several warm/cold cycles of
the engine) and coolant level is above cold full
when cold, disconnect the end of the overflow hose
at the fill neck and lower it into a clean container.
Allow coolant to drain into the container until emp-
tied. Reconnect overflow hose to fill neck.
STANDARD PROCEDURE - COOLING SYSTEM -
REVERSE FLUSHING
CAUTION: The cooling system normally operates at
97-to-110 kPa (14-to -16 psi) pressure. Exceeding
this pressure may damage the radiator or hoses.
Reverse flushing of the cooling system is the forc-
ing of water through the cooling system. This is done
using air pressure in the opposite direction of normal
coolant flow. It is usually only necessary with very
dirty systems with evidence of partial plugging.
CHEMICAL CLEANING
If visual inspection indicates the formation of
sludge or scaly deposits, use a radiator cleaner
(Mopar Radiator Kleen or equivalent) before flushing.
This will soften scale and other deposits and aid the
flushing operation.
CAUTION: Be sure instructions on the container are
followed.
REVERSE FLUSHING RADIATOR
Disconnect the radiator hoses from the radiator fit-
tings. Attach a section of radiator hose to the radia-
tor bottom outlet fitting and insert the flushing gun.
Connect a water supply hose and air supply hose to
the flushing gun.
CAUTION: The cooling system normally operates at
97-to-110 kPa (14- to-16 psi) pressure. Exceeding
this pressure may damage the radiator or hoses.
Allow the radiator to fill with water. When radiator
is filled, apply air in short blasts allowing radiator to
refill between blasts. Continue this reverse flushing
until clean water flows out through rear of radiator
cooling tube passages. For more information, refer to
operating instructions supplied with flushing equip-
ment. Have radiator cleaned more extensively by a
radiator repair shop.
REVERSE FLUSHING ENGINE
Drain the cooling system (Refer to 7 - COOLING -
STANDARD PROCEDURE). Remove the thermostat
housing and thermostat. Install the thermostat hous-
ing. Disconnect the radiator upper hose from the
radiator and attach the flushing gun to the hose. Dis-
connect the radiator lower hose from the water
pump. Attach a lead away hose to the water pump
inlet fitting.
CAUTION: Be sure that the heater control valve is
closed (heat off). This is done to prevent coolant
flow with scale and other deposits from entering
the heater core.
Connect the water supply hose and air supply hose
to the flushing gun. Allow the engine to fill with
water. When the engine is filled, apply air in short
blasts, allowing the system to fill between air blasts.
Continue until clean water flows through the lead
away hose. For more information, refer to operating
instructions supplied with flushing equipment.
Remove the lead away hose, flushing gun, water
supply hose and air supply hose. Remove the thermo-
stat housing (Refer to 7 - COOLING/ENGINE/EN-
GINE COOLANT THERMOSTAT - REMOVAL).
Install the thermostat and housing with a replace-
ment gasket (Refer to 7 - COOLING/ENGINE/EN-
GINE COOLANT THERMOSTAT -
INSTALLATION). Connect the radiator hoses. Refill
the cooling system with the correct antifreeze/water
mixture (Refer to 7 - COOLING - STANDARD PRO-
CEDURE).
7s - 12 COOLING - 2.4LKJ
COOLING - 2.4L (Continued)
ENGINE
TABLE OF CONTENTS
page page
COOLANT
DESCRIPTION
DESCRIPTION - HOAT COOLANT.........18
DESCRIPTION - ENGINE COOLANT.......19
OPERATION...........................20
COOLANT RECOVERY PRESS CONTAINER
DESCRIPTION.........................20
OPERATION...........................20
ENGINE BLOCK HEATER - 2.4L
DESCRIPTION.........................20
OPERATION...........................20
REMOVAL - 2.4L........................20
INSTALLATION - 2.4L....................20
ENGINE COOLANT TEMPERATURE SENSOR
DESCRIPTION.........................21
OPERATION...........................21
REMOVAL.............................21
INSTALLATION.........................22
ENGINE COOLANT THERMOSTAT
REMOVAL - 2.4L ENGINE.................22
INSTALLATION - 2.4L ENGINE.............22
RADIATOR
DESCRIPTION.........................22REMOVAL.............................22
CLEANING............................24
INSPECTION..........................24
INSTALLATION.........................24
RADIATOR PRESSURE CAP
DESCRIPTION.........................25
OPERATION...........................25
DIAGNOSIS AND TESTING - RADIATOR
PRESSURE CAP......................25
CLEANING............................25
INSPECTION..........................25
RADIATOR FAN - ELECTRIC
DESCRIPTION.........................26
OPERATION...........................26
REMOVAL.............................26
INSTALLATION.........................27
WATER PUMP - 2.4L
DESCRIPTION.........................27
OPERATION...........................27
REMOVAL - 2.4L ENGINE.................27
INSPECTION..........................28
INSTALLATION - 2.4L ENGINE.............28
COOLANT
DESCRIPTION
DESCRIPTION - HOAT COOLANT
WARNING: ANTIFREEZE IS AN ETHYLENE GLYCOL
BASE COOLANT AND IS HARMFUL IF SWAL-
LOWED OR INHALED. IF SWALLOWED, DRINK
TWO GLASSES OF WATER AND INDUCE VOMIT-
ING. IF INHALED, MOVE TO FRESH AIR AREA.
SEEK MEDICAL ATTENTION IMMEDIATELY. DO NOT
STORE IN OPEN OR UNMARKED CONTAINERS.
WASH SKIN AND CLOTHING THOROUGHLY AFTER
COMING IN CONTACT WITH ETHYLENE GLYCOL.
KEEP OUT OF REACH OF CHILDREN. DISPOSE OF
GLYCOL BASE COOLANT PROPERLY, CONTACT
YOUR DEALER OR GOVERNMENT AGENCY FOR
LOCATION OF COLLECTION CENTER IN YOUR
AREA. DO NOT OPEN A COOLING SYSTEM WHEN
THE ENGINE IS AT OPERATING TEMPERATURE OR
HOT UNDER PRESSURE, PERSONAL INJURY CAN
RESULT. AVOID RADIATOR COOLING FAN WHENENGINE COMPARTMENT RELATED SERVICE IS
PERFORMED, PERSONAL INJURY CAN RESULT.
CAUTION: Use of Propylene Glycol based coolants
is not recommended, as they provide less freeze
protection and less corrosion protection.
The cooling system is designed around the coolant.
The coolant must accept heat from engine metal, in
the cylinder head area near the exhaust valves and
engine block. Then coolant carries the heat to the
radiator where the tube/fin radiator can transfer the
heat to the air.
The use of aluminum cylinder blocks, cylinder
heads, and water pumps requires special corrosion
protection. MopartAntifreeze/Coolant, 5 Year/100,000
Mile Formula (MS-9769), or the equivalent ethylene
glycol base coolant with organic corrosion inhibitors
(called HOAT, for Hybrid Organic Additive Technology)
is recommended. This coolant offers the best engine
cooling without corrosion when mixed with 50% Eth-
ylene Glycol and 50% distilled water to obtain a freeze
point of -37ÉC (-35ÉF). If it loses color or becomes con-
taminated, drain, flush, and replace with fresh prop-
erly mixed coolant solution.
7s - 18 ENGINEKJ
CAUTION: MoparTAntifreeze/Coolant, 5
Year/100,000 Mile Formula (MS-9769) may not be
mixed with any other type of antifreeze. Mixing of
coolants other than specified (non-HOAT or other
HOAT), may result in engine damage that may not
be covered under the new vehicle warranty, and
decreased corrosion protection.
COOLANT PERFORMANCE
The required ethylene-glycol (antifreeze) and water
mixture depends upon climate and vehicle operating
conditions. The coolant performance of various mix-
tures follows:
Pure Water-Water can absorb more heat than a
mixture of water and ethylene-glycol. This is for pur-
pose of heat transfer only. Water also freezes at a
higher temperature and allows corrosion.
100 percent Ethylene-Glycol-The corrosion
inhibiting additives in ethylene-glycol need the pres-
ence of water to dissolve. Without water, additives
form deposits in system. These act as insulation
causing temperature to rise to as high as 149ÉC
(300ÉF). This temperature is hot enough to melt plas-
tic and soften solder. The increased temperature can
result in engine detonation. In addition, 100 percent
ethylene-glycol freezes at -22ÉC (-8ÉF).
50/50 Ethylene-Glycol and Water-Is the recom-
mended mixture, it provides protection against freez-
ing to -37ÉC (-34ÉF). The antifreeze concentration
must alwaysbe a minimum of 44 percent, year-
round in all climates. If percentage is lower, engine
parts may be eroded by cavitation. Maximum protec-
tion against freezing is provided with a 68 percent
antifreeze concentration, which prevents freezing
down to -67.7ÉC (-90ÉF). A higher percentage will
freeze at a warmer temperature. Also, a higher per-
centage of antifreeze can cause the engine to over-
heat because specific heat of antifreeze is lower than
that of water.
CAUTION: Richer antifreeze mixtures cannot be
measured with normal field equipment and can
cause problems associated with 100 percent ethyl-
ene-glycol.
COOLANT SELECTION AND ADDITIVES
The use of aluminum cylinder blocks, cylinder
heads and water pumps requires special corrosion
protection. Only MopartAntifreeze/Coolant, 5
Year/100,000 Mile Formula (glycol base coolant with
corrosion inhibitors called HOAT, for Hybrid Organic
Additive Technology) is recommended. This coolant
offers the best engine cooling without corrosion when
mixed with 50% distilled water to obtain to obtain a
freeze point of -37ÉC (-35ÉF). If it loses color or
becomes contaminated, drain, flush, and replace with
fresh properly mixed coolant solution.CAUTION: Do not use coolant additives that are
claimed to improve engine cooling.
DESCRIPTION - ENGINE COOLANT
ETHYLENE-GLYCOL MIXTURES
CAUTION: Richer antifreeze mixtures cannot be
measured with normal field equipment and can
cause problems associated with 100 percent ethyl-
ene-glycol.
The required ethylene-glycol (antifreeze) and water
mixture depends upon the climate and vehicle oper-
ating conditions. The recommended mixture of 50/50
ethylene-glycol and water will provide protection
against freezing to -37 deg. C (-35 deg. F). The anti-
freeze concentrationmust alwaysbe a minimum of
44 percent, year-round in all climates.If percentage
is lower than 44 percent, engine parts may be
eroded by cavitation, and cooling system com-
ponents may be severely damaged by corrosion.
Maximum protection against freezing is provided
with a 68 percent antifreeze concentration, which
prevents freezing down to -67.7 deg. C (-90 deg. F). A
higher percentage will freeze at a warmer tempera-
ture. Also, a higher percentage of antifreeze can
cause the engine to overheat because the specific
heat of antifreeze is lower than that of water.
Use of 100 percent ethylene-glycol will cause for-
mation of additive deposits in the system, as the cor-
rosion inhibitive additives in ethylene-glycol require
the presence of water to dissolve. The deposits act as
insulation, causing temperatures to rise to as high as
149 deg. C (300) deg. F). This temperature is hot
enough to melt plastic and soften solder. The
increased temperature can result in engine detona-
tion. In addition, 100 percent ethylene-glycol freezes
at 22 deg. C (-8 deg. F ).
PROPYLENE-GLYCOL MIXTURES
It's overall effective temperature range is smaller
than that of ethylene-glycol. The freeze point of 50/50
propylene-glycol and water is -32 deg. C (-26 deg. F).
5 deg. C higher than ethylene-glycol's freeze point.
The boiling point (protection against summer boil-
over) of propylene-glycol is 125 deg. C (257 deg. F )
at 96.5 kPa (14 psi), compared to 128 deg. C (263
deg. F) for ethylene-glycol. Use of propylene-glycol
can result in boil-over or freeze-up on a cooling sys-
tem designed for ethylene-glycol. Propylene glycol
also has poorer heat transfer characteristics than
ethylene glycol. This can increase cylinder head tem-
peratures under certain conditions.
KJENGINE7s-19
COOLANT (Continued)
(8) Disconnect the power steering cooler line from
cooler.
(9) Disconnect the radiator upper and lower hoses.
(10) Disconnect the overflow hose from radiator.
(11) The lower part of radiator is equipped with
two alignment dowel pins (Fig. 8). They are located
on the bottom of radiator tank and fit into rubber
grommets. These rubber grommets are pressed into
the radiator lower crossmember.
WARNING: THE AIR CONDITIONING SYSTEM (IF
EQUIPPED) IS UNDER A CONSTANT PRESSURE
EVEN WITH THE ENGINE OFF. REFER TO REFRIG-
ERANT WARNINGS IN, HEATING AND AIR CONDI-
TIONING BEFORE HANDLING ANY AIR
CONDITIONING COMPONENT.
NOTE: The radiator and radiator cooling fan can be
removed as an assembly. It is not necessary to
remove the cooling fan before removing or install-
ing the radiator.
(12) Gently lift up and remove radiator from vehi-
cle. Be careful not to scrape the radiator fins against
any other component. Also be careful not to disturb
the air conditioning condenser (if equipped).CLEANING
Clean radiator fins With the engine cold, apply cold
water and compressed air to the back (engine side) of
the radiator to flush the radiator and/or A/C con-
denser of debris.
INSPECTION
The radiator cooling fins should be checked for
damage or deterioration. Inspect cooling fins to make
sure they are not bent or crushed, these areas result
in reduced heat exchange causing the cooling system
to operate at higher temperatures. Inspect the plastic
end tanks for cracks, damage or leaks.
Inspect the radiator neck for damage or distortion.
INSTALLATION
CAUTION: Before installing the radiator or A/C con-
denser, be sure the radiator-to-body and radiator-to-
A/C condenser rubber air seals are properly
fastened to their original positions. These are used
at the top, bottom and sides of the radiator and A/C
condenser. To prevent overheating, these seals
must be installed to their original positions.
(1) Gently lower the radiator and fan shroud into
the vehicle. Guide the two radiator alignment dowels
into the rubber grommets located in lower radiator
crossmember.
(2) Connect the radiator upper and lower hoses
and hose clamps to radiator.
CAUTION: The tangs on the hose clamps must be
positioned straight down.
(3) Install coolant reserve/overflow tank hose at
radiator.
(4) Connect both transmission cooler lines at the
radiator.
(5) Install both radiator mounting bolts.
(6) Reconnect the electric cooling fan.
(7) Install the grill (Refer to 23 - BODY/EXTERI-
OR/GRILLE - INSTALLATION).
(8) Reinstall the cooling fan to the engine.
(9) Rotate the fan blades (by hand) and check for
interference at fan shroud.
(10) Refill cooling system (Refer to 7 - COOLING -
STANDARD PROCEDURE).
(11) Connect battery cable at battery.
(12) Start and warm engine. Check for leaks.
Fig. 8 Radiator Alignment Dowels - Typical
1 - RADIATOR
2 - ALIGNMENT DOWEL
3 - RADIATOR LOWER ISOLATOR
4 - RADIATOR LOWER CROSSMEMBER
7s - 24 ENGINEKJ
RADIATOR (Continued)
COMPASS CALIBRATION - STANDARD
PROCEDURE.........................8M-2
COMPASS DEMAGNETIZING -
STANDARD PROCEDURE...............8M-2
COMPASS MINI-TRIP COMPUTER -
DIAGNOSIS AND TESTING..............8M-6
COMPASS MINI-TRIP ILLUMINATION
BULB - INSTALLATION................8L-75
COMPASS MINI-TRIP ILLUMINATION
BULB - REMOVAL....................8L-74
COMPASS VARIATION ADJUSTMENT -
STANDARD PROCEDURE...............8M-3
COMPASS/MINI-TRIP COMPUTER -
DESCRIPTION........................8M-4
COMPASS/MINI-TRIP COMPUTER -
INSTALLATION.......................8M-8
COMPASS/MINI-TRIP COMPUTER -
OPERATION.........................8M-5
COMPASS/MINI-TRIP COMPUTER -
REMOVAL...........................8M-7
COMPRESSION PRESSURE - DIAGNOSIS
AND TESTING, CYLINDER................9-8
COMPRESSOR CLUTCH - INSPECTION,
A/C................................24-14
COMPRESSOR CLUTCH - INSTALLATION,
A/C................................24-14
COMPRESSOR CLUTCH - REMOVAL, A/C . . 24-13
COMPRESSOR CLUTCH BREAK-IN -
STANDARD PROCEDURE, A/C...........24-12
COMPRESSOR CLUTCH COIL -
DIAGNOSIS AND TESTING, A/C..........24-12
COMPRESSOR CLUTCH RELAY -
DESCRIPTION, A/C...................24-15
COMPRESSOR CLUTCH RELAY -
DIAGNOSIS AND TESTING.............24-15
COMPRESSOR CLUTCH RELAY -
INSTALLATION, A/C...................24-16
COMPRESSOR CLUTCH RELAY -
OPERATION, A/C.....................24-15
COMPRESSOR CLUTCH RELAY -
REMOVAL, A/C......................24-16
COMPRESSOR NOISE - DIAGNOSIS AND
TESTING, A/C.......................24-42
COMPUTER - DESCRIPTION, COMPASS/
MINI-TRIP..........................8M-4
COMPUTER - DIAGNOSIS AND TESTING,
COMPASS MINI-TRIP..................8M-6
COMPUTER - INSTALLATION, COMPASS/
MINI-TRIP..........................8M-8
COMPUTER - OPERATION, COMPASS/
MINI-TRIP..........................8M-5
COMPUTER - REMOVAL, COMPASS/
MINI-TRIP..........................8M-7
CONDENSER - DESCRIPTION, A/C.......24-45
CONDENSER - INSTALLATION, A/C.......24-46
CONDENSER - OPERATION, A/C.........24-45
CONDENSER - REMOVAL, A/C..........24-45
CONDITIONER - DESCRIPTION, HEATER
AND AIR ............................24-1
CONDITIONER - OPERATION, HEATER
AND AIR ............................24-2
CONDITIONS - DIAGNOSIS AND
TESTING, SPARK PLUG................8I-13
CONNECT FITTING - DESCRIPTION,
QUICK.............................14-10
CONNECTING ROD - DESCRIPTION,
PISTON.............................9-49
CONNECTING ROD BEARING - FITTING -
STANDARD PROCEDURE................9-40
CONNECTING ROD BEARING, FITTING.....9-49
CONNECTOR - DESCRIPTION, DATA LINK . 8E-10
CONNECTOR - INSTALLATION
.......8W-01-11
CONNECTOR - INSTALLATION, TRAILER
TOW
..............................8L-61
CONNECTOR - OPERATION, DATA LINK
. . . 8E-10
CONNECTOR - REMOVAL
...........8W-01-11
CONNECTOR - REMOVAL, TRAILER TOW
. . 8L-61
CONNECTOR, GROUND AND SPLICE
INFORMATION - DESCRIPTION
........8W-01-7
CONNECTOR/GROUND/SPLICE LOCATION
- DESCRIPTION
....................8W-91-1
CONSOLE - DESCRIPTION, OVERHEAD
....8M-1
CONSOLE - INSTALLATION, FLOOR
.....23-158
CONSOLE - OPERATION, OVERHEAD
......8M-2
CONSOLE - REMOVAL, FLOOR
.........23-158
CONSOLE DUCT - INSTALLATION, FLOOR
. 24-31
CONSOLE DUCT - REMOVAL, FLOOR
.....24-31CONSOLE LID LATCH - INSTALLATION,
FLOOR............................23-158
CONSOLE LID LATCH - REMOVAL,
FLOOR............................23-158
CONSOLE, REMOVAL - OVERHEAD.......8M-4
CONTAINER - DESCRIPTION, COOLANT
RECOVERY PRESS....................7-19
CONTAINER - OPERATION, COOLANT
RECOVERY PRESS....................7-19
CONTAMINATION - DIAGNOSIS AND
TESTING, BRAKE FLUID................5-26
CONTAMINATION - DIAGNOSIS AND
TESTING, FLUID....................21-125
CONTINUITY - STANDARD PROCEDURE,
TESTING.........................8W-01-9
CONTROL - DESCRIPTION, A/C HEATER . . . 24-16
CONTROL - DESCRIPTION, IGNITION......8I-1
CONTROL - DESCRIPTION, SPEED........8P-1
CONTROL - INSTALLATION, A/C HEATER . . 24-17
CONTROL - OPERATION, IGNITION........8I-1
CONTROL - OPERATION, SPEED..........8P-1
CONTROL - REMOVAL, A/C HEATER......24-17
CONTROL - TORQUE, SPEED............8P-2
CONTROL ARM - DESCRIPTION, LOWER . . . 2-21
CONTROL ARM - INSTALLATION, LOWER . . 2-10,
2-21
CONTROL ARM - INSTALLATION, UPPER . . . 2-21
CONTROL ARM - OPERATION, LOWER.....2-21
CONTROL ARM - REMOVAL, LOWER . . 2-10,2-21
CONTROL ARM - REMOVAL, UPPER......2-20
CONTROL ASSEMBLY WINDOW
DEFOGGER FUNCTION - DIAGNOSIS
AND TESTING, REAR HVAC.............8G-9
CONTROL CABLE - INSTALLATION,
THROTTLE..........................14-46
CONTROL CABLE - REMOVAL,
THROTTLE..........................14-45
CONTROL ILLUMINATION BULB -
INSTALLATION, HEATER-A/C............8L-78
CONTROL ILLUMINATION BULB -
REMOVAL, HEATER-A/C...............8L-78
CONTROL INFORMATION (VECI) LABEL -
DESCRIPTION, VEHICLE EMISSION.....Intro.-8
CONTROL MODULE - DESCRIPTION,
AIRBAG.............................8O-9
CONTROL MODULE - DESCRIPTION,
BODY...............................8E-2
CONTROL MODULE - DESCRIPTION,
SIDE IMPACT AIRBAG.................8O-43
CONTROL MODULE - DESCRIPTION,
TRANSMISSION......................8E-18
CONTROL MODULE - DIAGNOSIS AND
TESTING, BODY.......................8E-7
CONTROL MODULE - INSTALLATION....23-183
CONTROL MODULE - INSTALLATION,
AIRBAG............................8O-12
CONTROL MODULE - INSTALLATION,
BODY...............................8E-7
CONTROL MODULE - INSTALLATION,
SIDE IMPACT AIRBAG.................8O-45
CONTROL MODULE - OPERATION,
AIRBAG............................8O-10
CONTROL MODULE - OPERATION, BODY . . . 8E-5
CONTROL MODULE - OPERATION, SIDE
IMPACT AIRBAG.....................8O-43
CONTROL MODULE - OPERATION,
TRANSMISSION......................8E-18
CONTROL MODULE - REMOVAL........23-183
CONTROL MODULE - REMOVAL, AIRBAG . 8O-11
CONTROL MODULE - REMOVAL, BODY....8E-7
CONTROL MODULE - REMOVAL, SIDE
IMPACT AIRBAG.....................8O-44
CONTROL MOTOR - DESCRIPTION, IDLE
AIR ...............................14-35
CONTROL MOTOR - INSTALLATION, IDLE
AIR ...............................14-36
CONTROL MOTOR - OPERATION, IDLE
AIR ...............................14-35
CONTROL MOTOR - REMOVAL, IDLE AIR . . 14-36
CONTROL RELAY - DESCRIPTION,
TRANSMISSION.....................21-168
CONTROL RELAY - OPERATION,
TRANSMISSION
.....................21-168
CONTROL SWITCH - DESCRIPTION
.....23-184
CONTROL SWITCH - DIAGNOSIS AND
TESTING
..........................23-184
CONTROL SWITCH - INSTALLATION
.....23-184
CONTROL SWITCH - OPERATION
.......23-184CONTROL SWITCH - REMOVAL........23-184
CONTROL SYSTEM - DESCRIPTION,
EMISSION...........................25-1
CONTROL SYSTEM - DESCRIPTION,
EVAPORATION.......................25-24
CONTROLLER ANTILOCK BRAKE -
INSTALLATION.......................8E-10
CONTROLLER ANTILOCK BRAKE -
REMOVAL..........................8E-10
CONVERTER - DESCRIPTION, CATALYTIC . . . 11-2
CONVERTER - DESCRIPTION, TORQUE . . . 21-162
CONVERTER - INSPECTION, CATALYTIC....11-3
CONVERTER - INSTALLATION, CATALYTIC . . 11-3
CONVERTER - INSTALLATION, TORQUE . . 21-167
CONVERTER - OPERATION, TORQUE....21-166
CONVERTER - REMOVAL, CATALYTIC......11-2
CONVERTER - REMOVAL, TORQUE......21-167
CONVERTER HOUSING FLUID LEAK -
DIAGNOSIS AND TESTING.............21-80
COOLANT - DESCRIPTION, ENGINE........0-3
COOLANT LOW INDICATOR -
DESCRIPTION.......................8J-15
COOLANT LOW INDICATOR - OPERATION . 8J-16
COOLANT RECOVERY PRESS
CONTAINER - DESCRIPTION.............7-19
COOLANT RECOVERY PRESS
CONTAINER - OPERATION...............7-19
COOLANT TEMPERATURE SENSOR -
DESCRIPTION, ENGINE.................7-19
COOLANT TEMPERATURE SENSOR -
INSTALLATION, ENGINE................7-21
COOLANT TEMPERATURE SENSOR -
OPERATION, ENGINE...................7-20
COOLANT TEMPERATURE SENSOR -
REMOVAL, ENGINE....................7-20
COOLANT THERMOSTAT - OPERATION,
ENGINE.............................7-21
COOLER - DESCRIPTION, FLUID.........19-20
COOLER - DESCRIPTION, TRANS.........7-32
COOLER - INSTALLATION, FLUID........19-20
COOLER - OPERATION, FLUID..........19-20
COOLER - REMOVAL, FLUID............19-20
COOLING, SPECIAL TOOLS..............7-14
COOLING SYSTEM - OPERATION..........7-2
COOLING SYSTEM - REVERSE
FLUSHING - STANDARD PROCEDURE.....7-12
COOLING SYSTEM 3.7L ENGINE -
DESCRIPTION.........................7-1
COOLING SYSTEM 3.7L ENGINE -
STANDARD PROCEDURE, DRAINING......7-12
COOLING SYSTEM 3.7L ENGINE -
STANDARD PROCEDURE, REFILLING......7-12
COOLING SYSTEM DIAGNOSIS CHART -
DIAGNOSIS AND TESTING...............7-6
COOLING SYSTEM LEAKS - DIAGNOSIS
AND TESTING.........................7-4
COOLING SYSTEM REQUIREMENTS -
DESCRIPTION........................24-1
COOLING SYSTEM ROUTING 3.7L
ENGINE - DESCRIPTION.................7-2
CORE - DESCRIPTION, HEATER.........24-52
CORE - INSTALLATION, HEATER.........24-53
CORE - OPERATION, HEATER...........24-52
CORE - REMOVAL, HEATER............24-52
CORE AND OIL GALLERY PLUGS -
STANDARD PROCEDURE, ENGINE........9-10
COURTESY LAMP BULB - INSTALLATION . . 8L-76
COURTESY LAMP BULB - REMOVAL.....8L-75
COURTESY LAMP REPLACEMENT -
STANDARD PROCEDURE...............8M-2
COURTESY LAMP UNIT - INSTALLATION . . 8L-77
COURTESY LAMP UNIT - REMOVAL......8L-76
COVER - DESCRIPTION, STRUCTURAL.....9-55
COVER - FRONT - INSTALLATION, SEAT
BACK.............................23-167
COVER - FRONT - INSTALLATION, SEAT
CUSHION..........................23-167
COVER - FRONT - REMOVAL, SEAT BACK . 23-166
COVER - FRONT - REMOVAL, SEAT
CUSHION..........................23-167
COVER - INSTALLATION, COWL TRIM . . . 23-157
COVER - INSTALLATION, INSTRUMENT
PANEL TOP
........................23-153
COVER - INSTALLATION, STRUCTURAL
....9-55
COVER - OPERATION, STRUCTURAL
......9-55
COVER - REAR - INSTALLATION, SEAT
BACK
.............................23-169
COVER - REAR - REMOVAL, SEAT BACK
. 23-169
6 INDEXKJ
Description Group-Page Description Group-Page Description Group-Page
COOLANT TEMPERATURE SENSOR -
OPERATION, ENGINE...................7-21
COOLANT TEMPERATURE SENSOR -
REMOVAL, ENGINE....................7-21
COOLER - DESCRIPTION, TRANS.........7-30
COOLERS AND TUBES - STANDARD
PROCEDURE, FLUSHING................7-30
COOLING, SPECIAL TOOLS..............7-13
COOLING SYSTEM - OPERATION..........7-2
COOLING SYSTEM - REVERSE
FLUSHING - STANDARD PROCEDURE.....7-12
COOLING SYSTEM - STANDARD
PROCEDURE, DRAINING................7-11
COOLING SYSTEM - STANDARD
PROCEDURE, REFILLING................7-11
COOLING SYSTEM 2.4L ENGINE -
DESCRIPTION.........................7-1
COOLING SYSTEM DIAGNOSIS CHART -
DIAGNOSIS AND TESTING...............7-5
COOLING SYSTEM LEAKS - DIAGNOSIS
AND TESTING.........................7-2
CORE AND OIL GALLERY PLUGS -
STANDARD PROCEDURE, ENGINE.........9-9
COVER - CLEANING, CYLINDER HEAD.....9-26
COVER - INSPECTION, CYLINDER HEAD . . . 9-26
COVER - INSTALLATION, CYLINDER
HEAD...............................9-26
COVER - REMOVAL, CYLINDER HEAD.....9-26
COVER(S) - INSTALLATION, TIMING
BELT ...............................9-53
COVER(S) - REMOVAL, TIMING BELT......9-53
CRANKSHAFT - DESCRIPTION...........9-32
CRANKSHAFT - INSPECTION.............9-34
CRANKSHAFT - INSTALLATION...........9-34
CRANKSHAFT - OPERATION.............9-33
CRANKSHAFT - REMOVAL..............9-33
CRANKSHAFT END PLAY - STANDARD
PROCEDURE.........................9-33
CRANKSHAFT OIL SEAL - FRONT -
INSTALLATION........................9-37
CRANKSHAFT OIL SEAL - FRONT -
REMOVAL...........................9-37
CRANKSHAFT OIL SEAL - REAR -
INSTALLATION........................9-39
CRANKSHAFT OIL SEAL - REAR -
REMOVAL...........................9-38
CRANKSHAFT SPROCKET -
INSTALLATION........................9-56
CRANKSHAFT SPROCKET - REMOVAL.....9-55
CROSS-OVER PIPE - INSTALLATION.......11-4
CROSS-OVER PIPE - REMOVAL..........11-4
CYLINDER BORE FITTING - STANDARD
PROCEDURE, PISTON TO...............9-30
CYLINDER BORE HONING - STANDARD
PROCEDURE.........................9-31
CYLINDER COMBUSTION PRESSURE
LEAKAGE TEST - DIAGNOSIS AND
TESTING.............................9-3
CYLINDER COMPRESSION PRESSURE
TEST - DIAGNOSIS AND TESTING.........9-3
CYLINDER HEAD - CLEANING............9-20
CYLINDER HEAD - DESCRIPTION.........9-19
CYLINDER HEAD - INSPECTION..........9-21
CYLINDER HEAD - INSTALLATION........9-21
CYLINDER HEAD - OPERATION...........9-19
CYLINDER HEAD - REMOVAL............9-20
CYLINDER HEAD COVER - CLEANING......9-26
CYLINDER HEAD COVER - INSPECTION....9-26
CYLINDER HEAD COVER -
INSTALLATION
........................9-26
CYLINDER HEAD COVER - REMOVAL
......9-26
CYLINDER HEAD GASKET - DIAGNOSIS
AND TESTING
........................9-19
CYLINDER HEAD OFF - INSTALLATION
.....9-28
CYLINDER HEAD OFF - REMOVAL
........9-27
CYLINDER HEAD ON - INSTALLATION
.....9-28
CYLINDER HEAD ON - REMOVAL
.........9-27
DAMAGED OR WORN THREADS -
STANDARD PROCEDURE, REPAIR OF
.......9-9
DAMPER - INSTALLATION, VIBRATION
.....9-43
DAMPER - REMOVAL, VIBRATION
........9-43
DAYTIME RUNNING LAMP RELAY -
DESCRIPTION
.......................8L-20
DAYTIME RUNNING LAMP RELAY -
INSTALLATION
.......................8L-21
DAYTIME RUNNING LAMP RELAY -
OPERATION
.........................8L-20DAYTIME RUNNING LAMP RELAY -
REMOVAL..........................8L-21
DESCRIPTION - OPERATION.............7-20
DESCRIPTION, BACKUP LAMP SWITCH . . . 8L-15
DESCRIPTION, BALANCE SHAFT..........9-59
DESCRIPTION, BRAKE LAMP SWITCH....8L-16
DESCRIPTION, CAMSHAFT(S)............9-23
DESCRIPTION, CATALYTIC CONVERTER....11-2
DESCRIPTION, COMBINATION FLASHER . . . 8L-19
DESCRIPTION, COOLANT RECOVERY
PRESS CONTAINER....................7-20
DESCRIPTION, COOLING SYSTEM 2.4L
ENGINE..............................7-1
DESCRIPTION, CRANKSHAFT............9-32
DESCRIPTION, CYLINDER HEAD..........9-19
DESCRIPTION, DAYTIME RUNNING
LAMP RELAY........................8L-20
DESCRIPTION, ENGINE - 2.4L.............9-3
DESCRIPTION, ENGINE BLOCK...........9-30
DESCRIPTION, ENGINE BLOCK HEATER -
2.4L................................7-20
DESCRIPTION, ENGINE COOLANT.........7-19
DESCRIPTION, ENGINE COOLANT
TEMPERATURE SENSOR................7-21
DESCRIPTION, ENGINE MOUNTING.......9-44
DESCRIPTION, EXHAUST MANIFOLD......9-53
DESCRIPTION, EXHAUST SYSTEM........11-1
DESCRIPTION, FRONT FOG LAMP RELAY . . 8L-22
DESCRIPTION, HAZARD SWITCH........8L-28
DESCRIPTION, HEADLAMP HIGH BEAM
RELAY.............................8L-33
DESCRIPTION, HEADLAMP LEVELING
MOTOR............................8L-35
DESCRIPTION, HEADLAMP LEVELING
SWITCH............................8L-37
DESCRIPTION, HEADLAMP LOW BEAM
RELAY.............................8L-39
DESCRIPTION, HEAT SHIELDS...........11-4
DESCRIPTION, HOAT COOLANT..........7-18
DESCRIPTION, HOSE CLAMPS............7-1
DESCRIPTION, INTAKE MANIFOLD........9-51
DESCRIPTION, INTAKE/EXHAUST VALVES
& SEATS ............................9-27
DESCRIPTION, LAMP BAR.............8L-65
DESCRIPTION, LAMP BAR SWITCH......8L-67
DESCRIPTION, LAMPS/LIGHTING -
EXTERIOR...........................8L-2
DESCRIPTION, LUBRICATION............9-46
DESCRIPTION, MUFFLER...............11-4
DESCRIPTION, MULTI-FUNCTION
SWITCH............................8L-46
DESCRIPTION, OIL FILTER..............9-47
DESCRIPTION, OIL PRESSURE
SENSOR/SWITCH.....................9-48
DESCRIPTION, PARK LAMP RELAY.......8L-54
DESCRIPTION, PISTON & CONNECTING
ROD................................9-40
DESCRIPTION, RADIATOR...............7-22
DESCRIPTION, RADIATOR FAN -
ELECTRIC...........................7-26
DESCRIPTION, RADIATOR PRESSURE
CAP ................................7-25
DESCRIPTION, REAR FOG LAMP RELAY . . . 8L-56
DESCRIPTION, TRAILER TOW RELAY.....8L-62
DESCRIPTION, TRAILER TOW WIRING....8L-64
DESCRIPTION, TRANS COOLER..........7-30
DESCRIPTION, WATER PUMP - 2.4L......7-27
DIAGNOSIS - DIAGNOSIS AND TESTING,
LASH ADJUSTER (TAPPET) NOISE........9-28
DIAGNOSIS - DIAGNOSIS AND TESTING,
SERPENTINE DRIVE BELT...............7-15
DIAGNOSIS - PERFORMANCE -
DIAGNOSIS AND TESTING, ENGINE........9-5
DIAGNOSIS AND TESTING, BACKUP
LAMP SWITCH......................8L-15
DIAGNOSIS AND TESTING, BRAKE LAMP
SWITCH............................8L-17
DIAGNOSIS AND TESTING, COOLING
SYSTEM DIAGNOSIS CHART
..............7-5
DIAGNOSIS AND TESTING, COOLING
SYSTEM LEAKS
........................7-2
DIAGNOSIS AND TESTING, CYLINDER
COMBUSTION PRESSURE LEAKAGE
TEST
................................9-3
DIAGNOSIS AND TESTING, CYLINDER
COMPRESSION PRESSURE TEST
..........9-3
DIAGNOSIS AND TESTING, CYLINDER
HEAD GASKET
........................9-19DIAGNOSIS AND TESTING, ENGINE........9-5
DIAGNOSIS AND TESTING, ENGINE
DIAGNOSIS - PERFORMANCE.............9-5
DIAGNOSIS AND TESTING, ENGINE
MECHANICAL.........................9-7
DIAGNOSIS AND TESTING, ENGINE OIL
LEAK INSPECTION......................9-4
DIAGNOSIS AND TESTING, ENGINE OIL
PRESSURE CHECKING.................9-46
DIAGNOSIS AND TESTING, EXHAUST
SYSTEM............................11-2
DIAGNOSIS AND TESTING, FRONT FOG
LAMP RELAY........................8L-23
DIAGNOSIS AND TESTING, HEADLAMP
HIGH BEAM RELAY...................8L-34
DIAGNOSIS AND TESTING, HEADLAMP
LEVELING SWITCH...................8L-37
DIAGNOSIS AND TESTING, HEADLAMP
LOW BEAM RELAY...................8L-40
DIAGNOSIS AND TESTING, INTAKE
MANIFOLD LEAKS.....................9-51
DIAGNOSIS AND TESTING, LAMP BAR....8L-65
DIAGNOSIS AND TESTING, LAMPS/
LIGHTING - EXTERIOR.................8L-7
DIAGNOSIS AND TESTING, LASH
ADJUSTER (TAPPET) NOISE
DIAGNOSIS..........................9-28
DIAGNOSIS AND TESTING, MULTI-
FUNCTION SWITCH...................8L-50
DIAGNOSIS AND TESTING, ON-BOARD
DIAGNOSTICS (OBD)....................7-2
DIAGNOSIS AND TESTING, PARK LAMP
RELAY.............................8L-55
DIAGNOSIS AND TESTING,
PRELIMINARY CHECKS..................7-2
DIAGNOSIS AND TESTING, RADIATOR
PRESSURE CAP.......................7-25
DIAGNOSIS AND TESTING, REAR FOG
LAMP RELAY........................8L-57
DIAGNOSIS AND TESTING, SERPENTINE
DRIVE BELT DIAGNOSIS................7-15
DIAGNOSIS AND TESTING, TRAILER
TOW RELAY.........................8L-62
DIAGNOSIS CHART - DIAGNOSIS AND
TESTING, COOLING SYSTEM.............7-5
DIAGNOSTICS (OBD) - DIAGNOSIS AND
TESTING, ON-BOARD...................7-2
DISASSEMBLY, OIL PUMP...............9-49
DRAINING COOLING SYSTEM -
STANDARD PROCEDURE................7-11
DRIVE BELT DIAGNOSIS - DIAGNOSIS
AND TESTING, SERPENTINE.............7-15
ELECTRIC - DESCRIPTION, RADIATOR
FAN ................................7-26
ELECTRIC - INSTALLATION, RADIATOR
FAN ................................7-27
ELECTRIC - OPERATION, RADIATOR FAN . . . 7-26
ELECTRIC - REMOVAL, RADIATOR FAN....7-26
END PLAY - STANDARD PROCEDURE,
CRANKSHAFT........................9-33
END-PLAY - STANDARD PROCEDURE,
CAMSHAFT..........................9-23
ENGINE - 2.4L - DESCRIPTION............9-3
ENGINE - DESCRIPTION, COOLING
SYSTEM 2.4L.........................7-1
ENGINE - DIAGNOSIS AND TESTING.......9-5
ENGINE - INSTALLATION, 2.4L . . 7-14,7-17,7-22,
7-28
ENGINE - REMOVAL, 2.4L . . . 7-14,7-16,7-22,7-27
ENGINE - SPECIFICATIONS, 2.4L.........9-13
ENGINE - STANDARD PROCEDURE,
HYDROSTATIC LOCKED..................9-9
ENGINE ASSEMBLY - INSTALLATION......9-12
ENGINE ASSEMBLY - REMOVAL..........9-12
ENGINE BLOCK - DESCRIPTION..........9-30
ENGINE BLOCK HEATER - 2.4L -
DESCRIPTION........................7-20
ENGINE BLOCK HEATER - 2.4L -
OPERATION..........................7-20
ENGINE COOLANT - DESCRIPTION
........7-19
ENGINE COOLANT TEMPERATURE
SENSOR - DESCRIPTION
...............7-21
ENGINE COOLANT TEMPERATURE
SENSOR - INSTALLATION
...............7-22
ENGINE COOLANT TEMPERATURE
SENSOR - OPERATION
.................7-21
ENGINE COOLANT TEMPERATURE
SENSOR - REMOVAL
...................7-21
2 INDEXKJ
Description Group-Page Description Group-Page Description Group-Page
ENGINE CORE AND OIL GALLERY PLUGS
- STANDARD PROCEDURE...............9-9
ENGINE DIAGNOSIS - PERFORMANCE -
DIAGNOSIS AND TESTING...............9-5
ENGINE GASKET SURFACE
PREPARATION - STANDARD
PROCEDURE.........................9-11
ENGINE MECHANICAL - DIAGNOSIS AND
TESTING.............................9-7
ENGINE MOUNTING - DESCRIPTION......9-44
ENGINE OIL AND FILTER CHANGE -
STANDARD PROCEDURE................9-47
ENGINE OIL LEAK INSPECTION -
DIAGNOSIS AND TESTING...............9-4
ENGINE OIL LEVEL CHECK, STANDARD
PROCEDURE.........................9-47
ENGINE OIL PRESSURE CHECKING -
DIAGNOSIS AND TESTING..............9-46
ENGINE, SPECIAL TOOLS - 2.4L..........9-17
EXHAUST MANIFOLD - CLEANING........9-53
EXHAUST MANIFOLD - DESCRIPTION.....9-53
EXHAUST MANIFOLD - INSPECTION.......9-53
EXHAUST MANIFOLD - INSTALLATION.....9-53
EXHAUST MANIFOLD - OPERATION.......9-53
EXHAUST MANIFOLD - REMOVAL.........9-53
EXHAUST SYSTEM - DESCRIPTION.......11-1
EXHAUST SYSTEM - DIAGNOSIS AND
TESTING............................11-2
EXTERIOR - DESCRIPTION, LAMPS/
LIGHTING...........................8L-2
EXTERIOR - DIAGNOSIS AND TESTING,
LAMPS/LIGHTING.....................8L-7
EXTERIOR - OPERATION, LAMPS/
LIGHTING...........................8L-5
EXTERIOR - SPECIFICATIONS,
LAMPS/LIGHTING....................8L-15
FAN - ELECTRIC - DESCRIPTION,
RADIATOR...........................7-26
FAN - ELECTRIC - INSTALLATION,
RADIATOR...........................7-27
FAN - ELECTRIC - OPERATION,
RADIATOR...........................7-26
FAN - ELECTRIC - REMOVAL, RADIATOR . . . 7-26
FILTER - DESCRIPTION, OIL.............9-47
FILTER - INSTALLATION, OIL............9-47
FILTER - REMOVAL, OIL................9-47
FILTER CHANGE - STANDARD
PROCEDURE, ENGINE OIL...............9-47
FITTING - CONNECTING ROD............9-32
FITTING - PISTON RING................9-42
FITTING - STANDARD PROCEDURE,
MAIN BEARING.......................9-35
FITTING - STANDARD PROCEDURE,
PISTON TO CYLINDER BORE............9-30
FLASHER - DESCRIPTION, COMBINATION . 8L-19
FLASHER - OPERATION, COMBINATION . . . 8L-19
FLUSHING - STANDARD PROCEDURE,
COOLING SYSTEM - REVERSE...........7-12
FLUSHING COOLERS AND TUBES -
STANDARD PROCEDURE................7-30
FOG LAMP BULB - INSTALLATION,
FRONT.............................8L-22
FOG LAMP BULB - REMOVAL, FRONT....8L-21
FOG LAMP RELAY - DESCRIPTION,
FRONT.............................8L-22
FOG LAMP RELAY - DESCRIPTION, REAR . 8L-56
FOG LAMP RELAY - DIAGNOSIS AND
TESTING, FRONT.....................8L-23
FOG LAMP RELAY - DIAGNOSIS AND
TESTING, REAR......................8L-57
FOG LAMP RELAY - INSTALLATION,
FRONT.............................8L-24
FOG LAMP RELAY - INSTALLATION,
REAR..............................8L-58
FOG LAMP RELAY - OPERATION, FRONT . . 8L-22
FOG LAMP RELAY - OPERATION, REAR . . . 8L-57
FOG LAMP RELAY - REMOVAL, FRONT . . . 8L-24
FOG LAMP RELAY - REMOVAL, REAR....8L-58
FOG LAMP UNIT - ADJUSTMENT, FRONT . . 8L-25
FOG LAMP UNIT - INSTALLATION,
FRONT
.............................8L-25
FOG LAMP UNIT - REMOVAL, FRONT
.....8L-24
FORM-IN-PLACE GASKETS AND
SEALERS - STANDARD PROCEDURE
......9-10
FRONT - INSTALLATION, CRANKSHAFT
OIL SEAL
............................9-37
FRONT - REMOVAL, CRANKSHAFT OIL
SEAL
...............................9-37FRONT FOG LAMP BULB -
INSTALLATION.......................8L-22
FRONT FOG LAMP BULB - REMOVAL.....8L-21
FRONT FOG LAMP RELAY -
DESCRIPTION.......................8L-22
FRONT FOG LAMP RELAY - DIAGNOSIS
AND TESTING.......................8L-23
FRONT FOG LAMP RELAY -
INSTALLATION.......................8L-24
FRONT FOG LAMP RELAY - OPERATION . . 8L-22
FRONT FOG LAMP RELAY - REMOVAL....8L-24
FRONT FOG LAMP UNIT - ADJUSTMENT . . 8L-25
FRONT FOG LAMP UNIT - INSTALLATION . . 8L-25
FRONT FOG LAMP UNIT - REMOVAL.....8L-24
FRONT LAMP BULB - INSTALLATION.....8L-27
FRONT LAMP BULB - REMOVAL.........8L-27
FRONT LAMP UNIT - INSTALLATION.....8L-28
FRONT LAMP UNIT - REMOVAL.........8L-27
FRONT MOUNT - INSTALLATION..........9-44
FRONT MOUNT - REMOVAL.............9-44
FRONT POSITION LAMP BULB -
INSTALLATION.......................8L-28
FRONT POSITION LAMP BULB -
REMOVAL..........................8L-28
FRONT SUSPENSION, SPECIAL TOOLS.....2-1
GALLERY PLUGS - STANDARD
PROCEDURE, ENGINE CORE AND OIL......9-9
GASKET - DIAGNOSIS AND TESTING,
CYLINDER HEAD......................9-19
GASKET SURFACE PREPARATION -
STANDARD PROCEDURE, ENGINE........9-11
GASKETS AND SEALERS - STANDARD
PROCEDURE, FORM-IN-PLACE...........9-10
HAZARD SWITCH - DESCRIPTION.......8L-28
HAZARD SWITCH - INSTALLATION.......8L-30
HAZARD SWITCH - OPERATION.........8L-29
HAZARD SWITCH - REMOVAL..........8L-29
HEAD - CLEANING, CYLINDER...........9-20
HEAD - DESCRIPTION, CYLINDER........9-19
HEAD - INSPECTION, CYLINDER..........9-21
HEAD - INSTALLATION, CYLINDER........9-21
HEAD - OPERATION, CYLINDER..........9-19
HEAD - REMOVAL, CYLINDER...........9-20
HEAD COVER - CLEANING, CYLINDER.....9-26
HEAD COVER - INSPECTION, CYLINDER . . . 9-26
HEAD COVER - INSTALLATION,
CYLINDER...........................9-26
HEAD COVER - REMOVAL, CYLINDER.....9-26
HEAD GASKET - DIAGNOSIS AND
TESTING, CYLINDER...................9-19
HEAD OFF - INSTALLATION, CYLINDER....9-28
HEAD OFF - REMOVAL, CYLINDER........9-27
HEAD ON - INSTALLATION, CYLINDER.....9-28
HEAD ON - REMOVAL, CYLINDER........9-27
HEADLAMP BULB - INSTALLATION.......8L-32
HEADLAMP BULB - REMOVAL..........8L-30
HEADLAMP HIGH BEAM RELAY -
DESCRIPTION.......................8L-33
HEADLAMP HIGH BEAM RELAY -
DIAGNOSIS AND TESTING.............8L-34
HEADLAMP HIGH BEAM RELAY -
INSTALLATION.......................8L-35
HEADLAMP HIGH BEAM RELAY -
OPERATION.........................8L-33
HEADLAMP HIGH BEAM RELAY -
REMOVAL..........................8L-34
HEADLAMP LEVELING MOTOR -
DESCRIPTION.......................8L-35
HEADLAMP LEVELING MOTOR -
INSTALLATION.......................8L-36
HEADLAMP LEVELING MOTOR -
OPERATION.........................8L-36
HEADLAMP LEVELING MOTOR -
REMOVAL..........................8L-36
HEADLAMP LEVELING SWITCH -
DESCRIPTION.......................8L-37
HEADLAMP LEVELING SWITCH -
DIAGNOSIS AND TESTING.............8L-37
HEADLAMP LEVELING SWITCH -
INSTALLATION
.......................8L-38
HEADLAMP LEVELING SWITCH -
OPERATION
.........................8L-37
HEADLAMP LEVELING SWITCH -
REMOVAL
..........................8L-38
HEADLAMP LOW BEAM RELAY -
DESCRIPTION
.......................8L-39
HEADLAMP LOW BEAM RELAY -
DIAGNOSIS AND TESTING
.............8L-40HEADLAMP LOW BEAM RELAY -
INSTALLATION.......................8L-41
HEADLAMP LOW BEAM RELAY -
OPERATION.........................8L-39
HEADLAMP LOW BEAM RELAY -
REMOVAL..........................8L-40
HEADLAMP UNIT - ADJUSTMENT........8L-42
HEADLAMP UNIT - INSTALLATION.......8L-42
HEADLAMP UNIT - REMOVAL...........8L-41
HEAT SHIELDS - DESCRIPTION..........11-4
HEATER - 2.4L - DESCRIPTION, ENGINE
BLOCK..............................7-20
HEATER - 2.4L - OPERATION, ENGINE
BLOCK..............................7-20
HIGH BEAM RELAY - DESCRIPTION,
HEADLAMP.........................8L-33
HIGH BEAM RELAY - DIAGNOSIS AND
TESTING, HEADLAMP.................8L-34
HIGH BEAM RELAY - INSTALLATION,
HEADLAMP.........................8L-35
HIGH BEAM RELAY - OPERATION,
HEADLAMP.........................8L-33
HIGH BEAM RELAY - REMOVAL,
HEADLAMP.........................8L-34
HIGH MOUNTED STOP LAMP BULB -
INSTALLATION, CENTER...............8L-19
HIGH MOUNTED STOP LAMP BULB -
REMOVAL, CENTER...................8L-18
HIGH MOUNTED STOP LAMP UNIT -
INSTALLATION, CENTER...............8L-19
HIGH MOUNTED STOP LAMP UNIT -
REMOVAL, CENTER...................8L-19
HOAT COOLANT - DESCRIPTION..........7-18
HONING - STANDARD PROCEDURE,
CYLINDER BORE......................9-31
HOSE CLAMPS - DESCRIPTION...........7-1
HOSE CLAMPS - OPERATION.............7-2
HYDRAULIC LIFTERS - INSTALLATION.....9-29
HYDRAULIC LIFTERS - REMOVAL.........9-29
HYDROSTATIC LOCKED ENGINE -
STANDARD PROCEDURE.................9-9
INSPECTION - DIAGNOSIS AND
TESTING, ENGINE OIL LEAK..............9-4
INSPECTION, CAMSHAFT(S).............9-25
INSPECTION, CATALYTIC CONVERTER.....11-3
INSPECTION, CRANKSHAFT.............9-34
INSPECTION, CYLINDER HEAD...........9-21
INSPECTION, CYLINDER HEAD COVER.....9-26
INSPECTION, EXHAUST MANIFOLD.......9-53
INSPECTION, INTAKE MANIFOLD.........9-52
INSPECTION, OIL PUMP................9-50
INSPECTION, RADIATOR................7-24
INSPECTION, RADIATOR PRESSURE CAP . . . 7-25
INSPECTION, REMOVAL................9-28
INSPECTION, ROCKER ARMS............9-30
INSPECTION, STANDARD PROCEDURE.....9-32
INSPECTION, WATER PUMP - 2.4L........7-28
INSTALLATION - BALANCE SHAFT
TIMING.............................9-61
INSTALLATION, 2.4L...................7-20
INSTALLATION, 2.4L...................9-19
INSTALLATION, 2.4L ENGINE....7-14,7-17,7-22,
7-28
INSTALLATION, BALANCE SHAFT
CARRIER............................9-64
INSTALLATION, BALANCE SHAFT CHAIN . . . 9-64
INSTALLATION, BRAKE LAMP SWITCH....8L-18
INSTALLATION, CAMSHAFT OIL SEAL(S) . . . 9-22
INSTALLATION, CAMSHAFT(S)...........9-25
INSTALLATION, CATALYTIC CONVERTER
....11-3
INSTALLATION, CENTER HIGH MOUNTED
STOP LAMP BULB
....................8L-19
INSTALLATION, CENTER HIGH MOUNTED
STOP LAMP UNIT
....................8L-19
INSTALLATION, CLEVIS BRACKET
BUSHING
.............................2-4
INSTALLATION, CRANKSHAFT
............9-34
INSTALLATION, CRANKSHAFT OIL SEAL -
FRONT
..............................9-37
INSTALLATION, CRANKSHAFT OIL SEAL -
REAR
...............................9-39
INSTALLATION, CRANKSHAFT SPROCKET
. . 9-56
INSTALLATION, CROSS-OVER PIPE
.......11-4
INSTALLATION, CYLINDER HEAD
.........9-21
INSTALLATION, CYLINDER HEAD COVER
. . . 9-26
INSTALLATION, CYLINDER HEAD OFF
......9-28
INSTALLATION, CYLINDER HEAD ON
......9-28
KJINDEX 3
Description Group-Page Description Group-Page Description Group-Page
RELAY - DIAGNOSIS AND TESTING,
FRONT FOG LAMP....................8L-23
RELAY - DIAGNOSIS AND TESTING,
HEADLAMP HIGH BEAM...............8L-34
RELAY - DIAGNOSIS AND TESTING,
HEADLAMP LOW BEAM...............8L-40
RELAY - DIAGNOSIS AND TESTING,
PARK LAMP.........................8L-55
RELAY - DIAGNOSIS AND TESTING,
REAR FOG LAMP.....................8L-57
RELAY - DIAGNOSIS AND TESTING,
TRAILER TOW.......................8L-62
RELAY - INSTALLATION, DAYTIME
RUNNING LAMP.....................8L-21
RELAY - INSTALLATION, FRONT FOG
LAMP..............................8L-24
RELAY - INSTALLATION, HEADLAMP
HIGH BEAM.........................8L-35
RELAY - INSTALLATION, HEADLAMP
LOW BEAM.........................8L-41
RELAY - INSTALLATION, PARK LAMP.....8L-56
RELAY - INSTALLATION, REAR FOG
LAMP..............................8L-58
RELAY - INSTALLATION, TRAILER TOW . . . 8L-63
RELAY - OPERATION, DAYTIME
RUNNING LAMP.....................8L-20
RELAY - OPERATION, FRONT FOG LAMP . . 8L-22
RELAY - OPERATION, HEADLAMP HIGH
BEAM..............................8L-33
RELAY - OPERATION, HEADLAMP LOW
BEAM..............................8L-39
RELAY - OPERATION, PARK LAMP.......8L-54
RELAY - OPERATION, REAR FOG LAMP . . . 8L-57
RELAY - OPERATION, TRAILER TOW.....8L-62
RELAY - REMOVAL, DAYTIME RUNNING
LAMP..............................8L-21
RELAY - REMOVAL, FRONT FOG LAMP . . . 8L-24
RELAY - REMOVAL, HEADLAMP HIGH
BEAM..............................8L-34
RELAY - REMOVAL, HEADLAMP LOW
BEAM..............................8L-40
RELAY - REMOVAL, PARK LAMP........8L-55
RELAY - REMOVAL, REAR FOG LAMP....8L-58
RELAY - REMOVAL, TRAILER TOW.......8L-63
REMOVAL - CLEANING.................9-55
REMOVAL - INSPECTION...............9-28
REMOVAL, 2.4L.......................7-20
REMOVAL, 2.4L.......................9-19
REMOVAL, 2.4L ENGINE....7-14,7-16,7-22,7-27
REMOVAL, BALANCE SHAFT.............9-60
REMOVAL, BALANCE SHAFT CARRIER.....9-64
REMOVAL, BALANCE SHAFT CHAIN.......9-64
REMOVAL, BRAKE LAMP SWITCH.......8L-17
REMOVAL, CAMSHAFT OIL SEAL(S).......9-22
REMOVAL, CAMSHAFT(S)...............9-24
REMOVAL, CATALYTIC CONVERTER.......11-2
REMOVAL, CENTER HIGH MOUNTED
STOP LAMP BULB....................8L-18
REMOVAL, CENTER HIGH MOUNTED
STOP LAMP UNIT....................8L-19
REMOVAL, CLEVIS BRACKET BUSHING.....2-2
REMOVAL, CRANKSHAFT...............9-33
REMOVAL, CRANKSHAFT OIL SEAL -
FRONT..............................9-37
REMOVAL, CRANKSHAFT OIL SEAL -
REAR...............................9-38
REMOVAL, CRANKSHAFT SPROCKET......9-55
REMOVAL, CROSS-OVER PIPE...........11-4
REMOVAL, CYLINDER HEAD.............9-20
REMOVAL, CYLINDER HEAD COVER.......9-26
REMOVAL, CYLINDER HEAD OFF.........9-27
REMOVAL, CYLINDER HEAD ON..........9-27
REMOVAL, DAYTIME RUNNING LAMP
RELAY.............................8L-21
REMOVAL, ENGINE ASSEMBLY...........9-12
REMOVAL, ENGINE COOLANT
TEMPERATURE SENSOR................7-21
REMOVAL, EXHAUST MANIFOLD.........9-53
REMOVAL, FRONT FOG LAMP BULB......8L-21
REMOVAL, FRONT FOG LAMP RELAY.....8L-24
REMOVAL, FRONT FOG LAMP UNIT......8L-24
REMOVAL, FRONT LAMP BULB.........8L-27
REMOVAL, FRONT LAMP UNIT
..........8L-27
REMOVAL, FRONT MOUNT
..............9-44
REMOVAL, FRONT POSITION LAMP
BULB
..............................8L-28
REMOVAL, HAZARD SWITCH
...........8L-29
REMOVAL, HEADLAMP BULB
...........8L-30REMOVAL, HEADLAMP HIGH BEAM
RELAY.............................8L-34
REMOVAL, HEADLAMP LEVELING
MOTOR............................8L-36
REMOVAL, HEADLAMP LEVELING
SWITCH............................8L-38
REMOVAL, HEADLAMP LOW BEAM
RELAY.............................8L-40
REMOVAL, HEADLAMP UNIT...........8L-41
REMOVAL, HYDRAULIC LIFTERS.........9-29
REMOVAL, INTAKE MANIFOLD...........9-52
REMOVAL, LAMP....................8L-66
REMOVAL, LAMP BAR................8L-65
REMOVAL, LAMP BAR SWITCH.........8L-67
REMOVAL, LICENSE PLATE LAMP BULB . . 8L-44
REMOVAL, LICENSE PLATE LAMP UNIT . . . 8L-45
REMOVAL, LOWER BALL JOINT...........2-5
REMOVAL, LOWER CONTROL ARM
BUSHING.............................2-2
REMOVAL, LOWER SUSPENSION ARM
BUSHING.............................2-7
REMOVAL, MUFFLER...................11-4
REMOVAL, MULTI-FUNCTION SWITCH....8L-53
REMOVAL, OIL FILTER.................9-47
REMOVAL, OIL PAN...................9-48
REMOVAL, OIL PUMP..................9-49
REMOVAL, PARK LAMP RELAY..........8L-55
REMOVAL, PISTON & CONNECTING ROD . . . 9-40
REMOVAL, RADIATOR..................7-22
REMOVAL, RADIATOR FAN - ELECTRIC....7-26
REMOVAL, REAR FOG LAMP RELAY......8L-58
REMOVAL, REAR LAMP BULB..........8L-59
REMOVAL, REAR LAMP UNIT...........8L-59
REMOVAL, REAR MOUNT...............9-45
REMOVAL, REPEATER LAMP BULB.......8L-60
REMOVAL, REPEATER LAMP UNIT.......8L-61
REMOVAL, RHD........................5-1
REMOVAL, ROCKER ARMS..............9-29
REMOVAL, STRUCTURAL COLLAR........9-44
REMOVAL, TIMING BELT................9-55
REMOVAL, TIMING BELT COVER(S).......9-53
REMOVAL, TIMING BELT TENSIONER &
PULLEY.............................9-59
REMOVAL, TRAILER TOW CONNECTOR . . . 8L-61
REMOVAL, TRAILER TOW RELAY........8L-63
REMOVAL, UPPER BALL JOINT...........2-6
REMOVAL, UPPER CONTROL ARM
BUSHINGS............................2-3
REMOVAL, UPPER SUSPENSION ARM
BUSHING.............................2-7
REMOVAL, VIBRATION DAMPER..........9-43
REPAIR OF DAMAGED OR WORN
THREADS - STANDARD PROCEDURE.......9-9
REPEATER LAMP BULB - INSTALLATION . . 8L-60
REPEATER LAMP BULB - REMOVAL......8L-60
REPEATER LAMP UNIT - INSTALLATION . . 8L-61
REPEATER LAMP UNIT - REMOVAL......8L-61
REVERSE FLUSHING - STANDARD
PROCEDURE, COOLING SYSTEM.........7-12
RHD - INSTALLATION...................5-1
RHD - REMOVAL.......................5-1
RING, FITTING - PISTON................9-42
ROCKER ARMS - INSPECTION...........9-30
ROCKER ARMS - INSTALLATION.........9-30
ROCKER ARMS - REMOVAL.............9-29
ROD - DESCRIPTION, PISTON &
CONNECTING.........................9-40
ROD - INSTALLATION, PISTON &
CONNECTING.........................9-41
ROD - OPERATION, PISTON &
CONNECTING.........................9-40
ROD - REMOVAL, PISTON &
CONNECTING.........................9-40
ROD, FITTING - CONNECTING............9-32
RUNNING LAMP RELAY - DESCRIPTION,
DAYTIME...........................8L-20
RUNNING LAMP RELAY - INSTALLATION,
DAYTIME...........................8L-21
RUNNING LAMP RELAY - OPERATION,
DAYTIME
...........................8L-20
RUNNING LAMP RELAY - REMOVAL,
DAYTIME
...........................8L-21
SEAL - FRONT - INSTALLATION,
CRANKSHAFT OIL
.....................9-37
SEAL - FRONT - REMOVAL,
CRANKSHAFT OIL
.....................9-37
SEAL - REAR - INSTALLATION,
CRANKSHAFT OIL
.....................9-39SEAL - REAR - REMOVAL, CRANKSHAFT
OIL ................................9-38
SEALERS - STANDARD PROCEDURE,
FORM-IN-PLACE GASKETS..............9-10
SEAL(S) - INSTALLATION, CAMSHAFT
OIL ................................9-22
SEAL(S) - REMOVAL, CAMSHAFT OIL.....9-22
SEATS - CLEANING, INTAKE/EXHAUST
VALVES .............................9-27
SEATS - DESCRIPTION, INTAKE/
EXHAUST VALVES.....................9-27
SENSOR - DESCRIPTION, ENGINE
COOLANT TEMPERATURE...............7-21
SENSOR - INSTALLATION, ENGINE
COOLANT TEMPERATURE...............7-22
SENSOR - OPERATION, ENGINE
COOLANT TEMPERATURE...............7-21
SENSOR - REMOVAL, ENGINE COOLANT
TEMPERATURE.......................7-21
SENSOR/SWITCH - DESCRIPTION, OIL
PRESSURE..........................9-48
SENSOR/SWITCH - OPERATION, OIL
PRESSURE..........................9-48
SERPENTINE DRIVE BELT DIAGNOSIS -
DIAGNOSIS AND TESTING..............7-15
SHAFT - DESCRIPTION, BALANCE........9-59
SHAFT - OPERATION, BALANCE..........9-59
SHAFT - REMOVAL, BALANCE...........9-60
SHAFT CARRIER - INSTALLATION,
BALANCE............................9-64
SHAFT CARRIER - REMOVAL, BALANCE....9-64
SHAFT CHAIN - INSTALLATION,
BALANCE............................9-64
SHAFT CHAIN - REMOVAL, BALANCE......9-64
SHAFT TIMING, INSTALLATION -
BALANCE............................9-61
SHIELDS - DESCRIPTION, HEAT..........11-4
SPECIAL TOOLS - 2.4L ENGINE..........9-17
SPECIAL TOOLS - COOLING.............7-13
SPECIAL TOOLS - FRONT SUSPENSION.....2-1
SPECIAL TOOLS - REAR SUSPENSION......2-6
SPECIFICATIONS - TORQUE.............7-13
SPECIFICATIONS, 2.4L ENGINE...........9-13
SPECIFICATIONS, LAMPS/LIGHTING -
EXTERIOR..........................8L-15
SPECIFICATIONS, TORQUE..............9-16
SPROCKET - INSTALLATION,
CRANKSHAFT........................9-56
SPROCKET - REMOVAL, CRANKSHAFT.....9-55
STANDARD PROCEDURE - CLEANING.....9-31
STANDARD PROCEDURE - ENGINE OIL
LEVEL CHECK........................9-47
STANDARD PROCEDURE - INSPECTION....9-32
STANDARD PROCEDURE, CAMSHAFT
END-PLAY...........................9-23
STANDARD PROCEDURE, COOLING
SYSTEM - REVERSE FLUSHING..........7-12
STANDARD PROCEDURE, CRANKSHAFT
END PLAY ...........................9-33
STANDARD PROCEDURE, CYLINDER
BORE HONING........................9-31
STANDARD PROCEDURE, DRAINING
COOLING SYSTEM....................7-11
STANDARD PROCEDURE, ENGINE CORE
AND OIL GALLERY PLUGS...............9-9
STANDARD PROCEDURE, ENGINE
GASKET SURFACE PREPARATION.........9-11
STANDARD PROCEDURE, ENGINE OIL
AND FILTER CHANGE..................9-47
STANDARD PROCEDURE, FLUSHING
COOLERS AND TUBES.................7-30
STANDARD PROCEDURE, FORM-IN-
PLACE GASKETS AND SEALERS..........9-10
STANDARD PROCEDURE, HYDROSTATIC
LOCKED ENGINE.......................9-9
STANDARD PROCEDURE, LAMP BAR
AIMING............................8L-65
STANDARD PROCEDURE, MAIN BEARING
- FITTING
............................9-35
STANDARD PROCEDURE, MEASURING
BEARING CLEARANCE USING
PLASTIGAGE
.........................9-11
STANDARD PROCEDURE, PISTON TO
CYLINDER BORE FITTING
...............9-30
STANDARD PROCEDURE, REFILLING
COOLING SYSTEM
....................7-11
STANDARD PROCEDURE, REPAIR OF
DAMAGED OR WORN THREADS
...........9-9
6 INDEXKJ
Description Group-Page Description Group-Page Description Group-Page