2002 JEEP GRAND CHEROKEE Fuel injector

[x] Cancel search: Fuel injector

Page 1467 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual MAP SENSOR
DESCRIPTION
DESCRIPTION
On the 4.0L six-cylinder engine the MAP sensor is
mounted to the engine throttle body. On the 4.7L V-8
engine the MAP sensor is mounted to front of the
intake manifo

Page 1469 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual The other two heater elements (downstream sen-
sors 1/2 and 2/2) are controlled by the downstream
heater relay through output signals from the PCM.
To avoid a large simultaneous current surge, power
i

Page 1470 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual In Closed Loop operation, the PCM monitors cer-
tain O2 sensor input(s) along with other inputs, and
adjusts the injector pulse width accordingly. During
Open Loop operation, the PCM ignores the O2 se

Page 1471 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual THROTTLE BODY
DESCRIPTION
The throttle body is located on the intake manifold.
Fuel does not enter the intake manifold through the
throttle body. Fuel is sprayed into the manifold by
the fuel injector

Page 1475 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (7) From inside vehicle, install clip holding cable
to dashpanel (Fig. 16).
(8) From inside vehicle, slide throttle cable core
wire into opening in top of pedal arm.
(9) Push cable retainer (clip) int

Page 2160 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (M)Malfunction Indicator Lamp (MIL) illuminated during engine operation if this DTC was recorded
(depending if required by CARB and/or EPA). MIL is displayed as an engine icon on instrument panel.
(G)

Page 2172 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual DESCRIPTION - TASK MANAGER
The PCM is responsible for efficiently coordinating
the operation of all the emissions-related compo-
nents. The PCM is also responsible for determining if
the diagnostic sy

Page 2173 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual tive system and seal the evaporative system so the
leak detection test can be run.
The primary components within the assembly are:
A three port solenoid that activates both of the func-
tions listed a