2002 JEEP GRAND CHEROKEE oil

[x] Cancel search: oil

Page 1396 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (22) Install timing chain cover (Refer to 9 -
ENGINE/VALVE TIMING/TIMING BELT / CHAIN
COVER(S) - INSTALLATION) and crankshaft
damper (Refer to 9 - ENGINE/ENGINE BLOCK/VI-
BRATION DAMPER - INSTALLATION

Page 1426 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (3) Apply a small amount of clean engine oil to
o-rings.
(4) Position filter/regulator to body and install 2
bolts. Tighten bolts to 3 N´m (30 in. lbs.) torque.
(5) Connect 3 fittings. Refer to Quick

Page 1429 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (5) Connect (-) and (+) test cable leads into LCS
adapter receptacles. Use10 amp (10A +)receptacle
and common (-) receptacles.
(6) Gain access to MAIN MENU on DRB screen.
(7) Press DVOM button on DRB.

Page 1430 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (19) Disconnect test leads from relay cavities
immediately after testing.
FUEL PUMP PRESSURE TEST
Use this test in conjunction with other fuel system
tests. Refer to the Fuel Pump Capacity Test, Fuel

Page 1436 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (12) Remove first three ignition coils on each bank
(cylinders #1, 3, 5, 2, 4 and 6). Refer to Ignition Coil
Removal/Installation.
(13) Remove 4 fuel rail mounting bolts (Fig. 22).
(14) Gently rock an

Page 1437 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (9) Disconnect speed control cable at throttle body
(if equipped). Refer to Speed Control Cable.
(10) Disconnect automatic transmission cable at
throttle body (if equipped).
(11) Remove cable routing

Page 1449 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (a) Type 1: Pry up on latch clip with a screw-
driver (Fig. 50).
(b) Type 2: Separate and unlatch 2 small arms
on end of clip (Fig. 51) and swing away from fuel
line.
(c) Slide latch clip toward fuel

Page 1451 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual FUEL INJECTION
DIAGNOSIS AND TESTING
VISUAL INSPECTION
A visual inspection for loose, disconnected or incor-
rectly routed wires, vacuum lines and hoses should
be made. This should be done before atte