2002 JEEP GRAND CHEROKEE Throttle valve

[x] Cancel search: Throttle valve

Page 1169 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual TEMPERATURE VALVE ACTUATOR (MTC) - BLACK 6 WAY
CAV CIRCUIT FUNCTION
5- -
6- -
7 Z132 20BK/OR GROUND
8 C67 20RD/LB BLEND AIR DOOR POSITION CONTROL
9- -
10 F22 20WT/PK FUSED IGNITION SWITCH OUTPUT (RUN)

Page 1185 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual CONNECTOR NAME/
NUMBERCOLOR LOCATION FIG.
Right Front Park/Turn Signal
Lamp (Except Built-Up-Export)BK At Lamp N/S
Right Front Side Marker Lamp
(Except Built-Up-Export)WT At Lamp N/S
Right Front Turn

Page 1248 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual CONDITION POSSIBLE CAUSES CORRECTION
3. Worn or incorrect gapped spark
plugs3. Clean plugs and set gap. (Refer to
8 - ELECTRICAL/IGNITION
CONTROL/SPARK PLUG -
CLEANING).
4. Dirt or water in fuel syste

Page 1251 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual DIAGNOSIS AND TESTINGÐCYLINDER
COMPRESSION PRESSURE
The results of a cylinder compression pressure test
can be utilized to diagnose several engine malfunc-
tions.
Ensure the battery is completely cha

Page 1255 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (7) Remove the fan assembly from the water pump
(Refer to 7 - COOLING/ENGINE/RADIATOR FAN -
REMOVAL).
(8) Remove the fan shroud.
(9) Disconnect the transmission fluid cooler lines
(automatic transmiss

Page 1256 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual INSTALLATION
CAUTION: When installing the engine into a vehicle
equipped with an automatic transmission, be care-
ful not to damage the trigger wheel on the engine
flywheel.
(1) Attach a lifting devic

Page 1262 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (2) Lift cover up and position to the side.
(3) Remove air cleaner element.
INSTALLATION - 4.0L
(1) Clean inside of air cleaner housing before
installing new element.
(2) Install air cleaner element i

Page 1265 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (12) Install the push rods, rocker arms, pivots and
bridges in the order they were removed (Refer to 9 -
ENGINE/CYLINDER HEAD/ROCKER ARM /
ADJUSTER ASSY - INSTALLATION).
(13) Install the engine cylind
Page:   < prev 1-8 9-16 17-24 25-32 33-40 41-48 ... 88 next >