Page 254 of 426
7-77
Yuki_Data:Yuki_data:Yuki:Yuki_1:ATV:HM00B061_YFM400FWA-61:YFM600-7.frame
EL
l
If your ATV can’t make it up a hill you are
trying to climb:
Turn the ATV around if you still have for-
ward speed. If not, stop, dismount on the
uphill side of the ATV and physically turn
the ATV around. If the ATV starts to slip
backwards DO NOT USE THE REAR BRAKE
- the ATV may tip over on top of you. Dis-
mount the ATV on the uphill side. (See
pages 7-45 ~ 7-53.)
l
If your ATV is traversing a sloping surface:
Be sure to ride with your weight positioned
towards the uphill side of the ATV to main-
tain proper balance. If the ATV starts to tip,
steer down the hill (if there are no obstacles
in your way) to regain balance. If you dis-
cover that the ATV is going to tip over, dis-
mount on the uphill side. (See pages 7-59 ~
7-61.)
Page 298 of 426
8-41
Yuki_Data:Yuki_data:Yuki:Yuki_1:ATV:HM00B061_YFM400FWA-61:YFM600-8.frame
EL
10. Start the engine and warm it up for sever-
al minutes. While warming up, check for
oil leakage. If oil leakage is found, stop the
engine immediately and check for the
cause.
11. Install the panels.
EBU00705
Final gear oil
Final gear oil measurement
1. Place the machine on a level place.
2. Remove the oil filler bolt and check the oil
level. It should be up to the brim of the
hole. If the level is low, add oil to raise it to
the proper level.CAUTION:Be sure no foreign material enters the finalgear case.
1. Final gear oil
2. Final gear case filler bolt
3. Proper level
1. Huile de transmission finale
2. Boulon de remplissage du carter de transmission finale
3. Niveau correct
1. Aceite de la transmisión final
2. Tapa de la caja del filtro
3. Nivel adecuado
Page 340 of 426
8-83
Yuki_Data:Yuki_data:Yuki:Yuki_1:ATV:HM00B061_YFM400FWA-61:YFM600-8.frame
EL
EBU00657
Idle speed adjustmentNOTE:A diagnostic tachometer must be used for thisprocedure.
1. Start the engine and warm it up for a few
minutes at approximately 1,000 to
2,000 r/min. Occasionally rev the engine
to 4,000 to 5,000 r/min. The engine is
warm when it quickly responds to the
throttle.
2. Remove panel D. (See pages 8-17 ~ 8-21
for removal and installation procedures.)
3. Connect the tachometer and set the idle to
the specified idling speed by adjusting the
throttle stop screw. Turn the screw in to
increase engine speed, and out to de-
crease engine speed.
4. Install the panel.Specified idle speed:
1,450 ~ 1,550 r/min
1. Throttle stop screw
1. Vis d’arrêt de l’accélérateur
1. Tornillo de tope del acelerador
Page 398 of 426
9-5
Yuki_Data:Yuki_data:Yuki:Yuki_1:ATV:HM00B061_YFM400FWA-61:YFM600-9.frame
EL
7. Automotive type wax may be applied to
all painted and chrome plated surfaces.
Avoid combination cleaner-waxes. Many
contain abrasives which may mar the
paint or protective finish.
When finished, start the engine and let it
idle for several minutes.
WARNING
Wet brakes may have reduced stopping abili-
ty, increasing the chance of an accident. Test
the brakes after washing. Apply the brakes
several times at slow speeds to let friction dry
out the linings.