2001 SUZUKI GRAND VITARA instrument panel

[x] Cancel search: instrument panel

Page 1 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual Important
WARNING/CAUTION/NOTE
Please read this manual and follow its instructions carefully. To emphasize special information, the words
WARNING, CAUTION
 and NOTE
 have special meanings. Pay special

Page 11 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual 0A-6 GENERAL INFORMATION
Identification Information
Vehicle Identification Number
The vehicle body number is on the left side of instrument panel
and punched on the chassis inside the tire housing on

Page 23 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual 1A-2 HEATER AND VENTILATION
General Description
The heater, an in and out air selectable-type hot water heater, is so constructed that it is possible to assure an
agreeable ventilation at all times by

Page 79 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual 3C1-4 AIR BAG STEERING WHEEL AND COLUMN
Steering Column
REMOVAL
1) Disconnect negative (–) cable at battery.
2) Disable air bag system. Refer to “DISABLING AIR BAG SYSTEM” under “SERVICE PRECA

Page 167 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual 6-1-6 ENGINE GENERAL INFORMATION AND DIAGNOSIS (H27 ENGINE)
Engine Diagnosis
General Description
This vehicle is equipped with an engine and emission control system which are under control of ECM (PCM

Page 177 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual 6-1-16 ENGINE GENERAL INFORMATION AND DIAGNOSIS (H27 ENGINE)
Malfunction Indicator Lamp (MIL) Check
1) Turn ON ignition switch (but the engine at stop) and check
that MIL (1) lights.
If MIL does not l

Page 374 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual ENGINE AND EMISSION CONTROL SYSTEM (SEQUENTIAL MULTIPORT FUEL INJECTION FOR H27 ENGINE) 6E2-41
INSTALLATION
1) Confirm that vacuum passage on intake manifold is free from
clog.
2) Apply engine oil to

Page 375 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual 6E2-42 ENGINE AND EMISSION CONTROL SYSTEM (SEQUENTIAL MULTIPORT FUEL INJECTION FOR H27 ENGINE)
3) Check resistance between each two terminals as in table
below.
If check results are as specified, proc
Page:   1-8 9-16 17-24 next >