7B1-56 AUTOMATIC TRANSMISSION (4 A/T)
DISASSEMBLY
1) Remove bypass valve (1), bypass valve spring, check ball
valve damping spring, valve body ball (2) and ball valve
spring.
2) Remove lower valve body plate (1) and lower valve body
plate gasket.
3) Remove TCC (lock-up) control valve plate (2) and TCC
(lock-up) control valve gasket.
4) With pressure relief valve retainer (1) pressed with finger,
remove pressure relief valve bolt and then remove pressure
relief valve retainer (1), pressure relief valve spring and pres-
sure relief valve ball.
5) Remove TCC (lock-up) solenoid valve (1) and Then remove
O-ring (2) from TCC solenoid valve (1).
3. Check ball
4. Primary regulator valve sleeve retainer
5. Locating pin
Page 467 of 656

7B1-58 AUTOMATIC TRANSMISSION (4 A/T)
ASSEMBLY
Assemble each component by reversing disassembly procedure
and noting the following points.
•Coil outer diameter and free length of each valve spring
should be as listed below. Be sure to use each one of correct
size.
Coil outer diameter and free length of each valve spring :
•Install primary regulator valve sleeve so that its tip is posi-
tioned as it was before disassembly.
•Use new TCC (lock-up) control valve gasket, solenoid gas-
ket and lower valve body plate gasket.
•Tighten shift solenoid valve bolt to specified torque.
Tightening torque
Shift solenoid valve bolt : 10 N·m (1.0 kg-m, 7.5 lb-ft)
Name of spring Outer diameter Free length
Pressure relief valve spring 13.14 mm (0.517 in.) 32.14 mm (1.265 in.)
TCC (Lock-up) control valve
spring11.40 mm (0.449 in.) 32.60 mm (1.283 in.)
Valve damping spring 4.95 mm (0.195 in.) 20.00 mm (0.787 in.)
Low coast modulator valve spring 10.00 mm (0.394 in.) 42.35 mm (1.667 in.)
Inter coast modulator valve
spring9.04 mm (0.356 in.)
(G16 and J20 engines)27.26 mm (1.073 in.)
(G16 and J20 engines)
10.00 mm (0.394 in.)
(H25 and H27 engine)25.60 mm (1.008 in.)
(H25 and H27 engine)
Ball valve spring 10.5 mm (0.413 in.) 13.7 mm (0.539 in.)
Bypass valve spring 13.82 mm (0.544 in.) 28.90 mm (1.138 in.)
Primary regulator valve spring 17.02 mm (0.670 in.) 50.28 mm (1.980 in.)
1. Solenoid valve No. 1 (Shift solenoid valve)
2. Low coast modulator valve spring
3. Inter coast modulator valve spring
4. Intermediate coast modulator valve
5. Low coast modulator valve
Page 468 of 656
AUTOMATIC TRANSMISSION (4 A/T) 7B1-59
•Tighten TCC (lock-up) solenoid valve bolt to specified
torque.
Tightening torque
TCC solenoid valve bolt :
5.5 N·m (0.55 kg-m, 4.0 lb-ft)
•Tighten pressure relief valve bolt to specified torque.
Tightening torque
Pressure relief valve bolt :
5.5 N·m (0.55 kg-m, 4.0 lb-ft)
•Tighten lower valve body plate (1), TCC (lock-up) control
valve plate (2) flange bolt to specified torque.
Tightening torque
Lower valve body and TCC control valve Plate bolts :
5.5 N·m (0.55 kg-m, 4.0 lb-ft)
Unit Assembly
1) Apply A/T fluid to new O-ring and spring and install them to
accumulator piston and install accumulator piston to trans-
mission case.
1. Solenoid valve No. 2 (TCC solenoid valve)
2. O-ring
4. Upper spring
Page 470 of 656
AUTOMATIC TRANSMISSION (4 A/T) 7B1-61
Special Tool
09925-37811-001 09931-76030 09931-76011
Oil pressure gauge 16/14 pin DLC cable for
Tech 1AMass storage cartridge for
Tech 1ATech 1A kit (SUZUKI scan
tool) (See NOTE “A”.)
09940-53111
Bearing installer Tech 2 kit (SUZUKI scan
tool) (See NOTE “B”.)
NOTE:
“A”: This kit includes the following items and substitutes for the Tech 2 kit.
1. Storage case, 2. Operator’s manual, 3. Suzuki scan tool, 4. DLC cable, 5. Test lead/probe,
6. Power source cable, 7. DLC cable adapter, 8. Self-test adapter
“B”: This kit includes the following items and substitutes for the Tech 1A kit.
1. Tech 2, 2. PCMCIA card, 3. DLC cable, 4. SAE 16/19 adapter, 5. Cigarette cable, 6. DLC loopback
adapter, 7. Battery power cable, 8. RS232 cable, 9. RS232 adapter, 10. RS232 loopback connector,
11. Storage case, 12. Power supply
Page 475 of 656
7E-2 DIFFERENTIAL (FRONT)
General Description
4WD Control System
System circuit
1. 4WD switch 4. Release valve 7. Front differential 10. To ignition switch
2. Air pump assembly 5. Pressure switch 8. Air hose and pipe 11. ECM or PCM
3. Pump motor 6. Transfer 9. 4WD indicator lamp
Page 478 of 656
DIFFERENTIAL (FRONT) 7E-5
4WD Control System Circuit Inspection
Voltage check
Check for input or output voltage (voltage between each circuit and body ground) of ECM (PCM) with ECM
(PCM) connector connected and ignition switch turned ON.
TER-
MINALCIRCUITWIRE
COLORNORMAL
VOLTAGECONDITION
E61-19 4WD Indicator lampORN/
BLK10 –14 V Transfer shift lever : 2H or N
0 – 1 V4 seconds after transfer shift lever shifted
to 4H or 4L
C51-1-9Air pump assembly
(Pump motor and release
valve)RED 0 – 1 V Transfer shift lever : 2H or N
10 – 14 V1 seconds after transfer shift lever shifted
to 4H or 4L
C51-3-7 4WD switchBLK/
ORN10 – 14 V Transfer shift lever : 2H or N
0 – 1 V Transfer shift lever : 4H or 4L
C51-3-17 GroundBLK/
ORN 0 – 1 V –
C51-3-18Air pump assembly
(pressure switch)PNK 0 – 1 V Transfer shift lever : 2H or N
10 – 14 V4 seconds after transfer shift lever shifted
to 4H or 4L
1. ECM (PCM) connector terminal arrangement ; viewed from harness side
Page 479 of 656

7E-6 DIFFERENTIAL (FRONT)
4WD Control System Inspection
1) Install special tool to air hose connecting between air pump
assembly and differential (actuator) as shown in figure.
Tighten adjusting screw (2) of special tool as far as it stops.
Close air check side opening by using fuel hose (1) as blind
plug.
Special tool
(A) : 09918-18110
SUZUKI GENUINE PARTS
(B) : 09367-04002
2) Turn ON ignition switch and shift transfer lever from 2H to 4H
range.
3) Check that motor starts running (a sound can be heard)
within 1 second and it stops when gauge of special tool indi-
cates specified pressure value.
Check also for air leakage.
Air pressure specification
(for 4WD control system inspection) :
30.0 – 45.0 kPa (0.30 – 0.45 kg/cm
2, 4.25 - 6.40 psi)
4) Check that pressure value indicated on gauge of special tool
drops as soon as transfer lever is shifted to 2H position.
5) Start motor by shifting transfer lever to 4H position again.
Loosen adjusting screw (2) to lower pressure value on
gauge. Motor should start to run again and stop in about 4
seconds.
6) With the adjusting screw (2) of special tool loosened, shift
transfer shift lever to N or 2H position and then 4L or 4H
position.
Pump motor should stop about 10 seconds after motor starts
to run. NOTE:
Use care not to bend any part of hose.
3. pipe (to air pump assembly)
4. Hose (to differential carrier)
5. Differential housing
Page 484 of 656
DIFFERENTIAL (FRONT) 7E-11
Unit Repair
Refer to the same section of “UNIT REPAIR MANUAL” mentioned in “FOREWORD” of this manual.
Tightening Torque Specification
Special Tool
Fastening partTightening torque
Nm kg-m lb-ft
Front mounting bolts 85 8.5 61.5
Front mounting bracket bolts 50 5.0 36.5
Front drive shaft flange bolts 50 5.0 36.5
Propeller shaft flange bolts 50 5.0 36.5
Rear mounting bolt 85 8.5 61.5
Rear mounting bracket bolts 50 5.0 36.5
Rear mounting bracket No.2 bolts 85 8.5 61.5
09918-18110 09951-16080 09951-26010
Air pressure regulator Bearing installer Bush remover plate