Page 1149 of 2395

2 CHECK VIAS CONTROL SOLENOID VALVE POWER SUPPLY CIRCUIT
1. Stop engine.
2. Disconnect VIAS control solenoid valve harness connector.
SEF019Z
3. Turn ignition switch ªONº.
4. Check voltage between terminal 1 and ground with CONSULT-II or tester.
SEF603X
OK or NG
OK©GO TO 4.
NG©GO TO 3.
3 DETECT MALFUNCTIONING PART
Check the following.
IHarness connectors M32, F23
I10A fuse
IHarness continuity between fuse and VIAS control solenoid valve
©Repair harness or connectors.
4 CHECK VIAS CONTROL SOLENOID VALVE OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch ªOFFº.
2. Disconnect ECM harness connector.
3. Check harness continuity between ECM terminal 16 and terminal 2. Refer to Wiring Diagram.
Continuity should exist.
4. Also check harness for short to ground and short to power.
OK or NG
OK©GO TO 5.
NG©Repair open circuit or short to ground or short to power in harness or connectors.
VARIABLE INDUCTION AIR CONTROL SYSTEM (VIAS)
Diagnostic Procedure (Cont'd)
EC-614
Page 1152 of 2395
Wiring DiagramNBEC0386
MEC974C
GI
MA
EM
LC
FE
AT
TF
PD
AX
SU
BR
ST
RS
BT
HA
SC
EL
IDX
INJECTOR
Wiring Diagram
EC-617
Page 1154 of 2395
3 CHECK INJECTOR POWER SUPPLY CIRCUIT
1. Turn ignition switch ªOFFº.
SEF023Z
2. Turn ignition switch ªONº.
3. Check voltage between injector terminal 1 and ground with CONSULT-II or tester.
SEF364Z
OK or NG
OK©GO TO 5.
NG©GO TO 4.
4 DETECT MALFUNCTIONING PART
Check the following.
IHarness connectors M33, F22
IHarness connectors F5, F100
IFuse block (J/B) connector M10
I10A fuse
IHarness for open or short between injector and fuse
©Repair harness or connectors.
5 CHECK INJECTOR OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Turn ignition switch ªOFFº.
2. Disconnect ECM harness connector.
3. Check harness continuity between injector terminal 2 and ECM terminals 103, 104, 107, 101, 105, 102. Refer to Wiring
Diagram.
Continuity should exist.
4. Also check harness for short to ground and short to power.
OK or NG
OK©GO TO 7.
NG©GO TO 6.
GI
MA
EM
LC
FE
AT
TF
PD
AX
SU
BR
ST
RS
BT
HA
SC
EL
IDX
INJECTOR
Diagnostic Procedure (Cont'd)
EC-619
Page 1155 of 2395
6 DETECT MALFUNCTIONING PART
Check the following.
IHarness connectors F100, F5
IHarness for open or short between harness connector F5 and ECM
IHarness for open or short between harness connector F100 and injector
©Repair open circuit or short to ground or short to power in harness or connectors.
7 CHECK SUB-HARNESS CIRCUIT FOR OPEN AND SHORT
1. Remove intake manifold collector.
2. Disconnect injector harness connectors.
3. Check harness continuity between the following terminals. Refer to Wiring Diagram.
MTBL0483
Continuity should exist.
OK or NG
OK©GO TO 8.
NG©Repair open circuit or short to ground or short to power in harness or connectors.
8 CHECK INJECTOR
1. Disconnect injector harness connector.
2. Check resistance between terminals as shown in the figure.
SEF964XC
OK or NG
OK©GO TO 9.
NG©Replace injector.
9 CHECK INTERMITTENT INCIDENT
Refer to ªTROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENTº, EC-140.
©INSPECTION END
INJECTOR
Diagnostic Procedure (Cont'd)
EC-620
Page 1157 of 2395
Wiring Diagram=NBEC0390
MEC975C
START SIGNAL
Wiring Diagram
EC-622
Page 1159 of 2395

5 CHECK FUSE
1. Turn ignition switch ªOFFº.
2. Disconnect 7.5A fuse.
3. Check if 7.5A fuse is OK.
OK or NG
OK©GO TO 6.
NG©Replace 7.5A fuse.
6 CHECK START SIGNAL INPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Disconnect ECM harness connector.
2. Disconnect ignition switch harness connector.
3. Check harness continuity between ECM terminal 42 and fuse block, ignition switch and fuse block. Refer to Wiring Dia-
gram.
Continuity should exist.
4. Also check harness for short to ground and short to power.
OK or NG
OK©GO TO 8.
NG©GO TO 7.
7 DETECT MALFUNCTIONING PART
Check the following.
IHarness connectors M32, F23
IFuse block (J/B) connectors M10, E3
IHarness for open or short between ignition switch and fuse
IHarness for open or short between ECM and fuse
©Repair open circuit or short to ground or short to power in harness or connectors.
8 CHECK INTERMITTENT INCIDENT
Refer to ªTROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENTº, EC-140.
©INSPECTION END
START SIGNAL
Diagnostic Procedure (Cont'd)
EC-624
Page 1162 of 2395
Wiring DiagramNBEC0396
MEC976C
GI
MA
EM
LC
FE
AT
TF
PD
AX
SU
BR
ST
RS
BT
HA
SC
EL
IDX
FUEL PUMP
Wiring Diagram
EC-627
Page 1164 of 2395
3 DETECT MALFUNCTIONING PART
Check the following.
IFuse block (J/B) connector M10
I15A fuse in fuse block (J/B)
IHarness connectors M1, E1
IHarness for open or short between fuse and fuel pump relay-1 and fuel pump relay-2
©Repair harness or connectors.
4 CHECK FUEL PUMP RELAY-1 POWER SUPPLY CIRCUIT-II
Check voltage between terminal 3 and ground with CONSULT-II or tester.
SEF348Z
OK or NG
OK©GO TO 8.
NG©GO TO 5.
5 CHECK FUEL PUMP RELAY-2 OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1. Disconnect fuel pump relay-2.
2. Check harness continuity between fuel pump relay-2 terminal 5 and fuel pump relay-1 terminal 3. Refer to Wiring Dia-
gram.
Continuity should exist.
3. Also check harness for short to ground and short to power.
OK or NG
OK©GO TO 6.
NG©Repair open circuit or short to ground or short to power in harness or connectors.
GI
MA
EM
LC
FE
AT
TF
PD
AX
SU
BR
ST
RS
BT
HA
SC
EL
IDX
FUEL PUMP
Diagnostic Procedure (Cont'd)
EC-629