Page 228 of 1002
Downloaded from www.Manualslib.com manuals search engine
ICylinder Head and Valvetrain -.
Rotate engine clockwise (arrow) from 45" before TDC to
TDC position.
Secure crankshaft in
TDC position with BMW special tool
11 2 300.
4 Fit sprocket with primary chain to intaite camshaft on right
cylinder head:
Press timing chain tensioner rail against timing chain
(white arrow) to check that fastener holes are centered in
sprocket slots (black arrows) when slack is removed from
timing chain.
If necessary, remove sprocket and reposition.
Fit sprocket with chain to intake camshaft
5-8 with long bores aligned centrally.
Install bolts (arrows) and finger tighten cylinder
head
Page 253 of 1002
Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing Chain
4 Unscrew and remove cylinder head cover studs (arrows) at
rear of cylinder head.
% Secure camshafts in TDC position using BMW special tool
set
11 3 240.
4 Remove access plugs (arrows) from VANOS control unit.
Page 276 of 1002
Downloaded from www.Manualslib.com manuals search engine
. .. ~-
Camshaft Timing Chain -
4 Secure camshafts in TDC position using BMW special tool
set
11 3 240.
- Disconnect compressed air line, leaving compressed air fit-
ting attached to VANOS control unit.
NOTE -
Oil will drain from pressure line. Have a container and rags
ready
4 Unscrew sealing plugs from VANOS control unit (arrows).
NOTE-
Oil will drain from sealing plug bores. Have a container and
rags ready
4 Pull sealing caps straight out of VANOS control unit with
BMW special tool 11 6 170, or with short nose pliers.
NOTE-
Additional oil may drain from VANOS control unit.
4 Remove set screws (left-hand thread) on ends of intake and
exhaust camshafts.
NOTE-
Set screws have left hand threads. Remove with a clockwise
motion.
Page 278 of 1002

Downloaded from www.Manualslib.com manuals search engine
I Camshaft Timing Chain
- Using new gasket, install VANOS control unit to cylinde~
head.
Reinstall engine support eye.
Tightening torques VANOS control unit to cylinder head
M6 nut 10 Nm (89 in-lb)
M7 nut 14 Nm (10 ft-ib)
4 Insert and tighten VANOS hydraulic piston set screws on
intake and exhaust camshafts.
CAUTIOI\C
Set screws have left hand thread Tighten counterclocltwise.
Tightening torque
Hydraulic piston
to splined shaft 10 Nm (89 in-lb)
(set screw)
4 Replace sealing caps inside VANOS control unit with BMW
special tool 11 6 170, or short flat nosed pliers.
Insert and secure VANOS sealing plugs (arrows), using new
sealing O-rings.
Tightening torque Sealing plug to VANOS control unit 50 Nm (37
it-lb)
Remove compressed air fitting from VANOS control unit
Fit VANOS oil line banjo bolt with new seals. Attach oil line to
VANOS control unit.
Tightening torque Oil line to VANOS control unit (banjo bolt) 32
Nm (24
it-lb) -
Page 281 of 1002

Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing chain1
< With compressed air line connected, turn engine at least
twice in direction of rotation until cylinder
1 intake and ex-
haust camshaft lobes (arrows) face each other.
Do not rotate engine counterclockwise to reach the top dead
center position. Instead, complete another two complete ro-
Remove sealing plug from bore at bellhousing. Secure crank-
shaft in
TDC position with BMW special tool 11 2 300 (ar-
row).
- Remove cylinder head cover studs at rear of cylinder head.
< Place BMW special tool 11 3 240 over camshafts ends and
measure clearance of tool to cylinder head surface.
NOTE-
If the exhaust side of the tool (A) is not flush with the head,
adjust camshaft timing as described below.
Due to flexible sprocket design and VANOS control unit tol-
erances and play, the
intake side of special tool 11 3 240
(B) may be up to 1 mm (0.04 in) above the surface of the
cylinder head. This is normal. Reassemble engine. Other-
wise, adjust camshaft timing as described below.
- Remove double VANOS control unit. See VANOS control
unit, removing
(M52 TU and M54 engines).
< Press down on secondary chain tensionerand lock into place
using BMW special tool
11 3 292 or equivalent pin or drift.
Page 283 of 1002
Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing chain]
4 Pull out exhaust camshaft splined shaft to stop.
- Make sure camshafts are secured in TDC position using
BMW soecial tools 11 3 240 and 11 3 244.
4 Preload primary chain tensioning rail:
Tighten adjusting screw on
BMW special tool 11 4 220.
Tightening torque
Primary chain tensioner preload
0.7 Nm (6 in-lb)
4 Preload exhaust camshaft spring plate by pressing on im-
pulse wheel. Tighten mounting nuts
(arrows) by hand. Do
not tighten fully.
Page 284 of 1002

Downloaded from www.Manualslib.com manuals search engine
-
I Camshaft Timing Chain - --
Install BMW special tool 11 6 150 (VANOS setup bracket) to
front of cylinder head timing case. Tighten nuts
(arrows) by
hand, and then tighten down uniformly until special tool is in
full contact with cylinder head.
CAUTION-
Male sure all gasket material is removed from face of cylin-
der head. Clean
sealins face and keep free of oil.
Secure camshaft impulse sprockets and wheels:
Pretighten Torx screws
(A) on exhaust camshaft impulse
wheel to approx.
5 Nm (44 in-lb).
Pretighten mounting nuts
(B) on exhaust and intake
sprocket assemblies to approx.
5 Nm (44 in-lb).
- Torque down Torx screws (A) and nuts (8) to flnal
specifications.
Tightening torques Sprocket assembly
to camshaft
initial torque
5 Nm (44 in-lb)
Sprocket assembly to camshaft
M7 Torx screw (A) 20 Nm (15 fl-lb)
ivl6 mounting nut (B) 10 tdm (89 in-lb)
- Remove flywheel locking tool from transmission bellhousing
so that crankshaft is no longer locked.
- Remove camshaft locking tools from rear of cylinder head.
- Crank engine over twice by hand in direction of rotation until
cylinder
1 intake and exhaust camshaft lobes face each other - again.
- Secure crankshaft with BMW special tool 11 2 300.
4 Place BMW special tool 11 3 240 over camshaft ends and
measure clearance of tool to cylinder head surface.
NOJE-
If the exhaust side of the tool (A) is not flush with the head,
camshaft timing
Is incorrect. Repeat camshaft timing pro-
cedure.
* Due to flexible sprocket design and VANOS control unit tol-
erances and play, the
intake side of special tool 11 3 240
(6) may be up to 1 mm (0.04 in) above the sudace of the
cylinder head. This is normal. Otherwise, repeat camshaft
timing procedure.
Page 301 of 1002

Downloaded from www.Manualslib.com manuals search engine
Cp-- Camshaft -- Timing Chain
Secure camshaft sprockets and impulse wheels:
Tighten mounting screws
(A) on exhaust camshaft impulse
wheel to approx.
5 Nm (44 in-lb).
Tighten mounting nuts
(6) on exhaust and intake sprocket
assemblies to approx.
5 Nm (44 in-lb).
Torque down mounting screws (A) and nuts
(6) to iinal
specifications.
Tightening torques Sprocket assembly
to camshaft
initial torque
5 Nrn (44 in-lb)
Sprocket assembly to camshaft
M7 Torx screw (A) 20 Nm (I5 it-lb)
M6 mounting nut (8) 10 Nm (89 in-lb)
- Remove flywheel locking tool from transmission bellhousing
so that crankshaft is no longer secured.
- Remove camshaft loclting tools from rear of camshafts.
4 Crank engine over by hand twice in direction of rotation until
cylinder
1 intake and exhaust camshaft lobes (arrows) face
each other.
- Secure crankshaft in TDC position with BMW special tool
11 2 300.
4 Place BMW special tool 11 3 240 over camshaft ends and
measure clearance of tool to cylinder head surface.
NOTE-
* If the exhaust side of the tool is not flush with the head (gap
A), retime the camshafts as described laler in this repair
group.
Due to flexible sprocket design and VANOS control unit tol-
erances and play, the
intake side of special tool 71 3 240
may be up to
I mm (0.04 in) above the suriace of the cyl-
inder head (gap
B). This is normal. Otherwise, retime the
camshafts as described in
VANOS timing, checking and
adjusting (M52 TU and 11154 engines).
- Remove VANOS setup bracket from front of cylinder head
- Install VANOS control unit. See VANOS control unit, in-
stalling
(01152 TU and M54 engines).
- Install intake camshaft oil baffle